Search Documents

Sort by

  • SME
    Pilot study on the influence of the eccentric speed on cone crusher production and operation (edb7524e-49ff-4eb7-a7e1-0da505b43724)

    By D. Jacobson

    There are many different machine design parameters and variables that affect the production of cone crushers in a mineral processing plant. One of these variables is the speed at which the cone gyrate

    Dec 1, 2013

  • CIM
    Pilot Test Of Emew® Technology Application To Copper Electrorefinery Bleed Streams With High Arsenic Content

    By L. Byszynski

    The results of a three month evaluation of the application of EMEW® technology at the KGHM Glogów II Smelter tank house bleed stream are presented. The current, conven¬tional electrolyte decopperizati

    Jan 1, 2007

  • SME
    Pilot Test Of The Dupont Activator Technology At The Homestake Mine, Lead, South Dakota

    By H. Hinds

    Plant testing of DuPont's Activator Technology in the vat leach circuit of the Homestake mine shows increased gold recoveries of 3-5%. Activators are catalysts of gold dissolution in cyanide solu

    Jan 1, 1997

  • CIM
    Pilot Test Of The Permeable Reactive Barrier For Removing Uranium From The Flooded Gunnar Pit

    By D. Kong, A. Klyashtorin, L. McGilp, I. Wilson

    This work reports on applying iron oxide coated sands media in an experimental permeable reactive barrier to remove uranium species from uranium containing water. A field experiment was conducted at t

    Jan 1, 2020

  • SME
    Pilot Testing of a Permeable Reactive Barrier (PRB) to Remediate Sulfate, Metals, and Low pH in Groundwater

    By J. F. Strunk Jr., K. M. Maestas, Y. Chai, R. Legrand, R. L. Henry

    "Groundwater with elevated sulfate and metals was treated using a sulfate-reducing pilot PRB consisting of a series of six 55-gallon drums filled with ZVI (Fe0), wood chips, brewer’s grain, limestone,

    Jan 1, 2016

  • CIM
    Pilot Testing Of A Process Developed For Treatment Of Nicontaining Copper Concentrate After High-Grade Matte Separation Resulting In Blister Copper Production In Twozone Vaniukov Furnace

    By L. B. Tsymbulov, L. Sh. Tsemekhman, A. N. Golov

    Gipronickel Institute, JS is developing a process of continuous converting of Nicontaining copper matte and concentrates resulting in the production of blister copper and fluid NiO-containing slag in

    Jan 1, 2007

  • SME
    Pilot Testing Of Column For Coarse Particles Flotation

    By H. Soto

    As a follow-up to a laboratory study, a pilot scale column for the flotation of coarse particles was designed and then tested in two different applications. In the first test, the concentration of a c

    Jan 1, 1993

  • AUSIMM
    Pilot Tests for Heavy Metals Removal in Mine Water

    By M Vendrup, T C. Christensen, C Dube

    The adsorptive and granulate forming MetClean™ process has been used at many locations in Northern Sweden, Norway, Denmark, France, Spain, Mongolia, Japan and Australia. It has been pilot tested and u

    Sep 7, 2015

  • TMS
    Pilot Trial of Detoxification of Chromium Slag in Cyclone Furnace and Preparation of Glass-Ceramics with the Water-Quenched Melt

    By Lingling Zhang, Daqiang Cang, Guizhou Zhao

    Pilot trial ofthe detoxification ofchromium slag in cyclonefurnace and the preparation of glass-ceramics were investigated in a power plant in China. 10wt.%chromiumslagweremixedwithpulverizedbituminou

    Mar 1, 2018

  • TMS
    Pilot Trial of Direct Modification of Molten Blast Furnace Slag and Production of High Acidity Coefficient Slag Wool Fibers

    By Jun Li, Lingling Zhang, Daqiang Cang, Guizhou Zhao

    Pilot trial of direct modification of molten blast furnace slag and production of high acidity coefficient slag wool fibers were investigated nearby a blast furnace. Molten blast furnace slag discharg

    Mar 1, 2018

  • AUSIMM
    Pilot Tunnel and Blast Enlargement for Vibration Control

    By Lunardi P, Pelizza S

    The link between the Lecco bypass and major road SS36 (Italy) requires the construction of a double two-way tunnel (through the mount San Martino carbonatic massif). The tunnel excavating section

    Jan 1, 1987

  • IOM3
    Pilot-plant bio-oxidation of gold-bearing arsenopyrite concentrates

    By J. R. Budden, P. A. Spencer, J. Barrett

    The initially produced arsenic (III) is very toxic to the unconditioned culture but the mixed culture has the capacity to oxidise it to arsenic (V) in the presence of iron (III). It was possible to bu

    Apr 1, 1991

  • CIM
    Pilot-plant data for the design of primary autogenous and semi-autogenous mills

    By C. A. Rowland

    "Plant owners and operators, plant designers and grinding mill manufacturers are giving much attention to the design and manufacture of autogenous and semi-autogenous grinding mills, particularly the

    Jan 1, 1981

  • CIM
    Pilot-Plant Facilities for Hydraulic Transport of Solids

    By L. G. Smith, C. A. Shook, W. H. W. Husband, W. Schriek

    "The flow of slurries in pipelines is governed by many variables, and the study of the influence of each of these variables is difficult, if not impossible, in some cases. Many correlations are availa

    Jan 1, 1973

  • AIME
    Pilot-Plant Investigation of Concentration of Blackbird Cobalt Ore by Roast-Flotation Process

    By S. F. Ravitz, S. R. Zimmerely

    High-grade cobalt concentrates were produced from the complex Blackbird ore with very good recovery in continuous pilot-plant operations in which a low-grade bulk cobaltite-pyrite flotation concentrat

    Jan 10, 1950

  • SME
    Pilot-Plant Pressure Filtration Of Coal-Preparation-Plant Refuse Slurry

    By D. W. Hutchinson

    One of the most important problems facing the coal industry today is the disposal of refuse from the coal preparation plants in a safe, economical, and efficient manner while complying with all legal

    Jan 1, 1977

  • AIME
    Pilot-Plant Production Of Electrolytic Magnesium From Magnesia

    By C. K. Stoddard, R. G. Knickerbocker, E. T. Leidigh, R. R. Lloyd, K. L. Mattingly

    DURING July 1941, a study was initiated at the Boulder City Experiment Station of the Bureau of Mines on proposed methods for the production of magnesium metal. The major emphasis was placed upon deve

    Jan 1, 1945

  • SME
    Pilot-Plant Solution Mining And Environmental Monitoring At The Mutooroo Copper Mine, South Australia - Introduction

    By J. H. Canterford

    To date, large-scale solution mining has received little attention in Australia, although the potential of this technique has not gone unnoticed. The possibility of long-term damage to the local envir

    Jan 1, 1981

  • SAIMM
    Pilot-Plant Solvent Extraction Of Cobalt And Nickel For Avmin?s Nkomati Project

    By A. Feather

    Avmin have developed a flowsheet for the refining of copper, nickel and cobalt from Nkomati concentrates. Cobalt is recovered from calcium-saturated solution using Cyanex® 272. Nickel is subsequently

    Jan 1, 2002

  • AUSIMM
    Pilot-Plant Testing of Ammoniacal-Cyanidation for Gold Recovery from Copper Gold-Bearing Ore

    Pilot-Plant Testing of Ammoniacal-Cyanidation for Gold Recovery from Copper Gold-Bearing Ore The results of pilot-plant tested ammoniacal-cyanidation of gold recovery from copper gold-bearing ore are

    Sep 13, 2010