Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pile Set-Up to Optimize High-Rise Bridge DesignBy Charles Winter
The Ohio Department of Transpor- tation's (ODOT's) $228 million 1-480 Valley View Bridge project was needed to keep traffic flowing on one of the state's busiest freeway segments. Deterioration from a
May 1, 2022
-
Pile Settlement Design Using Continuous Surface Wave Testing And Modulus DegradationBy Hennie F. T. Barnard
Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me
-
Pile Settlement Design Using Continuous Surface Wave Testing and Modulus Degradation (9593f752-8bd1-4766-938c-27b4baad33f2)By Hennie F. T. Barnard, Theodore E. B. Vorster
Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me
Jan 1, 2017
-
Pile Shaft Capacity from Cone Penetration Test (CPT) Records; Considering Scale EffectsBy Abolfazl Eslami, Sepide Lotfi, Mohammad M. Eslami
"Via direct CPT methods for pile capacity prediction, correlation coefficients smaller than unity are used to relate cone tip resistance (qc) and sleeve friction (fs) to pile toe capacity (rt) and sha
Jan 1, 2015
-
Pile Test Results - 1-15 Corridor Reconstruction Project, Salt Lake City, Utah (Abstract Only) - DFI Member Conference - Seattle, 1998By D. M. Holloway
As a part of the 1-15 Reconstruction Project, static and dynamic (high-strain) testing methods formed the basis to estimate long-term axial capacities, and to assess the magnitudes of bearing capacity
Jan 1, 1998
-
Pile Testing Methods - Authors' Presentations. - Paper 9.1 An Innovative Approach To Load Testing Of High Capacity PilesBy W. G. K. Fleming
Mr P. Bermingham introduced paper 9.1, describing the development and trials of a new pile load-testing technique that the Authors had termed "Statnamic". The system involved launching a test weight m
Jan 1, 1991
-
Pile Top Hydraulic Hammer Drive Down The Hole Chiselling Round Steel Piling System - SummaryBy J. Nakayama
For installation of round steel piles or cast-in-place pile construction through boulder contained ground or rocky formation, usual system does not function properly or impossible to work. This paper
Jan 1, 1999
-
Pile-Supported Raft Foundation SystemBy Emre Biringen
Over the past decades, there has been an increasing recognition of the strategic use of pile-supported rafts in design of heavily-loaded structures to reduce total and differential settlements. Howeve
-
Pile-Supported Raft Foundation System (fd70e68a-eb6f-470f-9fd8-5fc4c0cc8d20)By Mohab Sabry, Emre Biringen
"Over the past decades, there has been an increasing recognition of the strategic use of pile-supported rafts in design of heavily-loaded structures to reduce total and differential settlements. Howev
Jan 1, 2017
-
Piled Foundation Design as Reflected In Codes and StandardsBy Bengt H. Fellenius
"ABSTRACTAn example from a guidelines document for the Eurocode is discussed that addresses design for geotechnical strength of piled foundations in settling soil, generating drag force and downdrag.
Jan 1, 2014
-
Piled Foundations for the New Wembley Stadium, LondonBy Anthony L. Reynolds, Clifford J. Wren
"The adoption of a significant pile testing regime, the use of Eurocode 7 as the design standard, the development of lean construction techniques, and lateral thinking in overcoming some considerable
Jan 1, 2005
-
Piled Raft Design For High Rise Buildings In East London, UKBy D. P. Nicholson
The current phase of office development at Canary Wharf in the London Docklands includes twelve multi-storey buildings varying from eighteen to forty stories in height. The area of Canary Wharf South
Jan 1, 2002
-
Piled Raft Floats On MoraineBy Terence P. Holman
Instrumented load testing of high capacity micropiles, followed by detailed analysis and numerical modeling, provided an opportunity for real foundation performance to be incorporated into the design
Jan 1, 2007
-
Piled Raft On Layered SoilsBy Luca de Sanctis
The analysis of piled raft foundations in layered soils may be performed by 3D finite elements or by approximate procedures. Among the latter, the code NAPRA (Russo, 1998) is based on the method of th
Jan 1, 2002
-
Piled Raft System - Approximate Design Methods. - SynopsisBy S. L. Karunakaran
There are cases where it is found that a raft foundation would have adequate factor of safety against ultimate bearing capacity failure but the settlements would be excessive. Piles may be introduced
Jan 1, 1996
-
Piled Rafts In Geotechnical Practice - An International PerspectiveBy Michael W. Neill, O&apos
The performance of foundations that combine the high bearing capacity of rafts (mats) with the settlement reduction capability of piles is described through a summary of 24 case histories. Structures
Jan 1, 2003
-
Piled Rafts: Are We Modelling Them Correctly?By Jonathan J. Dewsbury
It is argued that approximate computer based methods are only suited to modelling conventional piled rafts, for pile enhanced rafts where the interactions will be non linear three dimensional finite e
Jan 1, 2010
-
Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected PilesBy A. Eslami
In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;
Jan 1, 2008
-
Piled-Raft Foundations in BelarusBy V. A. Sernov
"One of the ways to increase the bearing capacity of a piled foundation is to take into account soil resistance in the base of the raft. Piled raft is similar to shallow foundation and can transfer si
Jan 1, 2016
-
Piles In Expansive Soil For Large Tension Forces ? SynopsisBy G. W. Plant
This paper describes the design philosophy and construction details of piles between 25m and 32m deep to support 160m high and 110m base diameter cooling rowers for a major power station. It is sited
Jan 1, 2010