Search Documents

Sort by

  • AUSIMM
    Pike River Coal - Modern Mine Design

    The Pike River Coal Company is set to develop the Pike River Coal Mine in the Paparoa Ranges of New ZealandÆs South Island. The mine will be developed to extract a coking coal deposit of the Brunner S

    Jan 1, 2005

  • AUSIMM
    Pike River Coal - Project Management Challenges

    The Pike River Coalfield is located on the West Coast of the South Island of New Zealand near the top of the Paparoa Range approximately 45 km north east of the coastal town of Greymouth. The Pike Riv

    Jan 1, 2005

  • AUSIMM
    Pike River Coal - Quality Environmental Management

    A major new mine to be developed at Pike River during 2005 has been designed to have a minimal impact upon the environment, and an overall net conservation gain. The Pike River Coalfield is located on

    Jan 1, 2005

  • AUSIMM
    Pilbara creek diversions – resilience gained through increased ore recovery and an integrated approach to design

    By M Rafty, A Markham, S Atkinson, M Heyting

    Over recent years there has been a significant increase in the number of miners in the Pilbara region of Western Australia targeting channel iron deposits (CID) located in valleys, intersected by ephe

    Jul 24, 2017

  • AUSIMM
    Pilbara Iron Ore Classification - A Proposal for a Common Classification for BIF-Derived Supergene Iron Ore

    A co-operative research project, combining Commonwealth Scientific and Industrial Research Organisation (CSIRO) research scientists findings and company iron ore geologists' expertise, resulted i

    Jan 1, 1984

  • AUSIMM
    Pilbara Iron Ore Density

    Iron ore in the Pilbara Region of Western Australia varies in composition giving iron ore a range of densities. An accurate density figure of the material leads to accurate calculations of production

    Jan 1, 2003

  • DFI
    Pile Construction And Related Problems ? Synopsis

    By K. Fujita

    In order to deal properly with the fundamental aspects of pile construction, the following problems and their solutions are introduced: For driven piles - stresses, damage, movements of surroundings,

    Jan 1, 2010

  • DFI
    Pile Design According to Eurocode 7, Highlights and Developments

    By Adriaan van Seters

    "Abstract The content of Eurocode 7 – Part 1 and Part 2 – with respect to piled foundations is outlined. The important role of pile testing is presented and the derivation of the characteristic value

    Jan 1, 2014

  • DFI
    Pile Design And Construction Challenges In Partially Thawed Alaskan Soils

    By John D. Thornley

    Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alas

  • DFI
    Pile Design and Construction Challenges in Partially Thawed Alaskan Soils (f9ca4371-20bf-4196-a495-4aa1bd15a8c0)

    By John D. Thornley

    Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alask

    Jan 1, 2017

  • DFI
    Pile Design For Offshore Structures Subjected To Subsidence

    By Juan J. Campo

    The Freeport-McMoRan Main Pass Mine development in the Gulf of Mexico is a complex designed to extract up to 67 million long tons of sulphur over a 40 year period. The initial development includes 15

    Jan 1, 1992

  • DFI
    Pile Design Philosophies For Coralline And Weak Carbonate Rocks

    By Rahul Wankhade, Sunil S. Baswankar, Aditya S. Kharatkar

    Despite advances in pile design methodologies and piling techniques at site, difficulties and uncertainties still exists for design of piles particularly in coralline deposits and weak carbonate rocks

    Sep 1, 2022

  • DFI
    Pile Design Using Cpt Results: The “Lpc Method”

    By Frederic A. Verheyde

    The CPT pile design method of the ‘Laboratoire des Ponts et Chaussées’ (LPC) uses the cone resistance (qc) for the design of axially loaded piles. It was originally proposed in 1982 and was revised in

    Nov 1, 2022

  • DFI
    Pile Design, Testing, And Installation For A Gated Dam ? Synopsis

    By B. H. Moore

    The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori

    Jan 1, 2010

  • DFI
    Pile Diameter Effects On Initial Modulus Of Subgrade Reaction For Laterally Loaded Piles

    By Hubert Law, Amin Rahmani

    This paper evaluates the effects of pile diameter on the initial modulus of subgrade reaction and proposes modifications to the subgrade reaction moduli that are commonly used in the current state of

  • DFI
    Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging Project

    By José Carlos do Amaral, Marcelo Groszownik, Jorge Beim

    "Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the

    Jan 1, 2015

  • DFI
    Pile Driving Dilemma: Reducing Noise, Vibrations

    By Michael D. Justason

    "In January 2009, long-time competitors, Anchor Shoring & Caissons Ltd. of Toronto and Bermingham Foundation Solutions of Hamilton, joined forces to tackle one of the Greater Toronto area’s largest de

    Jan 1, 2012

  • DFI
    Pile Driving Equipment ? The Right Tool For The Job - "How To Avoid First Day 'Down Time' Blues"

    By R. Paul De Bruyn

    A. Crane Check List -- Make -- Model -- Year of Manufacture -- Where is load chart? Is it for this crane? -- Boom style and length -- Boom tip drawing (sketch) for fixed lead connection.

    Jan 1, 1990

  • DFI
    Pile Driving Hammers In Centrifuge Modelling - Synopsis

    By Daniel Levacher

    Pile load tests in site require extensive means of action and time. To get outstanding tests, the environmental test conditions must be perfectly known and acceptable. They concern the support install

    Jan 1, 1996

  • DFI
    Pile Foundation - A Critical Study Of Some Design Aspects. - Synopsis

    By S. L. Karunakaran

    Selection of an appropriate foundation system requires great skill and ingenuity on the part of the designer. Certain guidelines for choosing between a pile and raft foundation are presented. A number

    Jan 1, 1996