Search Documents

Sort by

  • SME
    Performance Of The CMI-EBW Centrifuges At The Crown II Mine

    By James R. Yancik

    Economical and environmental pressures necessitates the recovery of the minus 0.6 mm x 0 coal generated by todays mining machines. This size fraction, dependent on the type of production unit, mainten

    Jan 1, 1981

  • AUSIMM
    Performance of the Coal Mine Openings and Pillars in Anisotropic Stress Field

    The stability of parallel underground coal mine galleries and pillars have been investigated using two- and three-dimensional (3D) numerical stress analysis. Anisotropic horizontal in situ stresses an

    Dec 6, 2010

  • SME
    Performance Of The Eveleth Taconite Company Plant - Introduction

    By D. M. Urich

    This paper is a follow-up on a previous paper presented at the A.I.M.E. Meeting in Chicago, Illinois, on February 17, 1965, by Mr. D. Kelly Campbell. Mr. Campbell's paper was presented prior to t

    Jan 1, 1967

  • SME
    Performance Of The Homestake Mining Company Biological Cyanide Degradation Wastewater Treatment Plant August 1984 - August 1986

    By J. L. Whitlock

    A mutant strain of Pseudomonas paucimobilis is utilized to effectively degrade and or remove 90-98% of cyanide, thiocyanate, toxic heavy metals and ammonia from a cyanidation mill process and mine dis

    Jan 1, 1987

  • AUSIMM
    Performance of the IsaMills in the George Fisher Flowsheet

    By M Gao

    Six new IsaMills were installed for the George Fisher flowsheet in the Lead/Zinc Concentrator of Mount Isa Mines to produce a product P80 as fine as seven microns. The objective was better liberation

    Jan 1, 2000

  • CIM
    Performance of the Lomex 34-foot variable speed mill

    By J. G. Mieczaniec

    "A key element for a successful mining operation is the grinding circuit. It must be reliable, maintainable and must perform to or above design capacities for 95% of the time. Once chosen and installe

    Jan 1, 1985

  • SME
    Performance Of The Lorraine Mine Site Cover To Limit Oxygen Migration

    By Bruno Bussière, Michel Aubertin, Anne-Marie Dagenais, Johanne Cyr

    A five steps remediation program was commissioned in 1998 for the acid generating Lorraine mine site, located in the Témiscamingue region, Quebec, Canada. It included, as the main expenditure, a cover

    Jan 1, 2005

  • SME
    Performance Of The McNally Wedag Horizontal Vibratory Centrifuge For Dewatering Of 0.5 X 0.15 MM (28 X 100 Mesh) Fine Coal: Also 10 X 0.5 MM (3/8" X 28 Mesh) Refuse

    By P. W. King

    The performance of the versatile McNally Wedag horizontal vibratory centrifuge for dewatering ultra fine 0.5 x 0.15 mm (28 x 100 mesh) material has proven to be success¬ful and the results presented h

    Jan 1, 1985

  • CIM
    Performance of the oxygen limiting cover at the LTA site, Malartic, Quebec

    By M. R. Julien, A. Maqsoud, J. Martschuk, B. Bussière

    Acid mine drainage (AMD) from mine wastes is one of the most challenging environmental problems currently facing the mining industry. When mining wastes have the potential to produce AMD, the effluent

    Jan 1, 2006

  • AUSIMM
    Performance of the Standard Semi-Variogram Estimator Using a Simulated Data Set

    Estimation of the semi-variogram is basic to the geostatistical processing of data. The most widely used arithmetic average estimator is here employed with various sampling patterns to calculate exper

    Jan 1, 1984

  • SME
    Performance of the Support System Following Multiple 3.0+ Mn Seismic Events at Vale’s Creighton Mine – A Case Study - RASIM2022

    By Stephanie Singarayer, Damodara Reddy Chinnasane, Mike Yao, Danielle Pelletier

    Mining at Vale’s Creighton Mine has been active for nearly 120 years in Sudbury, Ontario, Canada. Being the deepest mine in the Sudbury region, mining induced seismicity is a common occurrence at Crei

    Apr 26, 2022

  • CIM
    Performance of the Tankcell® E500 at the Kevitsa Mine

    By Ben Murphy, Tomi Maksimainen, Antti Rinne, Ishmael Muzinda, Toni Mattsson

    "A 500m3 flotation cell was commissioned during 2014 at the Kevitsa Mine in northern Finland working as the first rougher in the copper flotation circuit. Treating around 850tph with an average grade

    Jan 1, 2016

  • CIM
    Performance of the two EPBM in Istanbul Twin Metro Tunnel Excavations in Weak Rock

    By Ibrahim Ocak

    The prediction of machine utilization time and determining machine performance plays an important role in scheduling and planning tunnel excavation and data base created serve a major role in further

    Aug 1, 2013

  • DFI
    Performance Of Three Unique Shoring Sections For Block 75 Shoring

    By Chris Sammon

    The Block 75 portion of the City Creek redevelopment project in Salt Lake City required multiple shoring walls surrounding the 6 acre site constructed to depths ranging from sixty-five to ninety feet

    Jan 1, 2010

  • DFI
    Performance Of Toe-Grouted Large Bored Pile In Sand-Gravel Formation Of Chiang Mai City, Northern Thailand

    By Narong Thasnanipan

    Performance of diameter 1.5 m toe-grouted bored pile founded at depth 44 m in sand-gravel formation of Chiang Mai City is presented in this paper. Toe grouting was applied by using tube-a-manchette me

    Jan 1, 2002

  • SME
    Performance of Tunnel Segments Reinforced with Synthetic Macro Fibers - RETC2021

    By Todd Clarke, Ralf Winterberg

    For more than a decade the tunneling industry has explored the potential and benefits of macro synthetic fiber (MSF) reinforced concrete solutions for precast tunnel segments. Parallel to industry inv

    Jun 13, 2021

  • SME-ICGCM
    Performance of Various Standing and Cribless Tailgate Support Configurations in a Large Eastern Coal Mine

    By Gregory M. Molinda

    Difficult mining conditions in deep western U.S. Iongwalls have necessitated the use of novel tailgate support systems. Extreme ground movement in these yielding gate systems has caused operators to u

    Jan 1, 1997

  • AUSIMM
    Performance of Vertical Flow Systems for Passive Treatment of Acid Mine Drainage

    Vertical flow systems (SAPS, vertical flow wetlands) are increasingly used for passive treatment of mine drainage that is net acid. Data on 30 systems in eastern US show that well designed systems typ

    Jan 1, 2003

  • AUSIMM
    Performance Optimisation of the Imhoflot G-Cell for Fine Coal Cleaning

    By V Gupta, Z Huang, S K. Biswal

    G-Cell is a new design modification of the Imhoflot pneumatic flotation technology, which utilises a self-inducing aerator inside a downcomer, where bubble-particle attachment takes place. The present

    Jan 1, 2005

  • SME
    Performance Optimization in Clogging Soils through Process Controlling

    By Ulrich Maidl, Marc Comulada, Janosch Stascheit

    "INTRODUCTION Cohesive soils are notorious for causing clogging of the cutter head and the excavation chamber of tunnel boring machines (TBMs). While clogging leads to a drastic reduction in excavatio

    Jan 1, 2016