Search Documents

Sort by

  • NIOSH
    Part One - Assessment Of Electromagnetic Noise Data And Definition Of A New Measurement Program – Introduction

    The first phase of our work for PMSRC on this contract was devoted to a comprehensive and in-depth assessment of electromagnetic (EM) noise measurements and data taken by several contractors for use i

    Jan 1, 1974

  • NIOSH
    Part One - Executive Summary - I. Purpose And Approach

    This Volume documents the Phase 111 effort on the Seismic Detection and Location of Isolated Miners on Contract H0122026 undertaken during the fall of 1972 by a task team composed of ADL staff and sev

    Jan 1, 1974

  • NIOSH
    Part Seven - Mine Pager Phone To Public Telephone Interconnect System – Introduction

    This Part describes a mine pager phone to public telephone interconnect sys tem that permits mine paging telephones to be selectively interconnected with the public telephone system, as illustrated by

    Jan 1, 1974

  • NIOSH
    Part Seven - Theoretical Seismic Signal Source And Transmission Characteristics – I Summary

    By John T. Kuo

    The miner's seismic source strength can be approximately estimated on the basis of a single force acting in an infinite medium. Because of the uncertain- ty involved in estimating the amount of c

    Jan 1, 1974

  • NIOSH
    Part Six - Field Utilization Of Seismic Systems – I. Summary

    By Frank Pilotte

    Proper design characteristics for a seismic system to locate miners during a mine disaster are considered in terms of a total system concept. Field hardware, processing equipment, operating personnel,

    Jan 1, 1974

  • NIOSH
    Part Six - Trolley Wire Mine Communications - Introduction

    This part of the final report treats some problems related to coal mine carrier frequency communication systems using the trolley wire/track transmission line. This work was undertaken for a brief per

    Jan 1, 1974

  • NIOSH
    Part Ten - Signal-To-Noise Ratio Improvement Techniques – I. Summary

    By Roy Greenfield

    During the detection phase, several procedures can be used to improve the signal-to-noise ratio (SIN) . • Subarrays of up to 10 seismometers should be used. The apparent failure to obtain improveme

    Jan 1, 1974

  • NIOSH
    Part Three - Leaky Coaxial Cable For Guided Wireless Mine Communication Systems - Introduction

    Coaxial cable structures form the subject of substantial theoretical and experimental investigations either directly related, or which can be extrapolated, to the communications needs and environments

    Jan 1, 1974

  • NIOSH
    Part Three - Estimates Of Miner Location Accuracy: Error Analysis In Seismic Location Procedures For Trapped Miners - I. Summary

    By David C. Peters, Robert S. Crosson

    A method of error analysis has been applied to the location technique of non-linear least squares iterative inversion in order to evaluate the resolving power of several seismic array configurations w

    Jan 1, 1974

  • NIOSH
    Part Twelve - Briefing Charts – I. Introduction

    In this Part, we have included copies of the flip charts and overhead projector viewgraphs used in the two briefings we conducted as part of this seismic detection and location task. The first one was

    Jan 1, 1974

  • NIOSH
    Part Two - Detection Range And Arrival Time Estimates - I. Summary

    By Roy Greenfield

    Estimates are given for the distance from a seismometer at which a miner can probably be detected. The procedure in making these estimates was to first establish the natural noise levels at the output

    Jan 1, 1974

  • AIME
    PART V - An Estimate of Contact and Continuity of Dispersions in Opaque Samples

    By J. Gurland

    The wmk is concerned with the estimate of the degee of continuity of a particulate phase dispersed in a matrix. The first section is a verieu: of the parameters nzeasurable by quantitative rnetallogva

    Jan 1, 1967

  • AIME
    PART V - Changes of Dislocation Damping Observed During Yielding of Magnesium, Molybdenum, and LiF

    By R. B. Gordon, D. A. Koss

    Ultrasonic-atlenuation changes due to the formation of free dislocations have been observed during tensile tests of magnesium and LiF single crystals and samples of polycrystalline Results on the L

    Jan 1, 1967

  • AIME
    PART V - Communications - A Metallographic Technique for Lanthanum and Cerium

    By C. C. Koch, M. L. Picklesimer

    PHYSICAL metallurgists interested in the alloying behavior and phase transformations in rare-earth metals and alloys require a strain-free polished and etched surface for both metallographic and X-ray

    Jan 1, 1968

  • AIME
    PART V - Communications - A New Intermediate Compound in the Titanium-Boron System, Ti3B4

    By R. G. Fenish

    THE B-Ni system was chosen for this study because of the great interest being shown in boron-fiber-strengthened composite materials. Boron fibers were obtained from Texaco Experiment, Inc. They ave

    Jan 1, 1967

  • AIME
    PART V - Communications - Chemical Etchants for Dislocations in Alpha Brass

    By R. N. Orava

    TO the author's knowledge, only one satisfactory high-resolution technique for etch-pitting dislocations in Cu-Zn alloys has been published.' In that account, pits in 70/30 brass single crys

    Jan 1, 1968

  • AIME
    PART V - Communications - Crystallographic Techniques for the Interpretation of Transmission Electron Micrographs of Hexagonal Metals

    By J. Stringer, I. W. Edington, C. R. Rarey

    THE geometrical interpretation of transmission electron micrographs of hcp metals is more complicated than the equivalent interpretation of cubic metal for two reasons: firstly, prominent zone axes ar

    Jan 1, 1967

  • AIME
    PART V - Communications - Effect of Current Density on Field-Freezing Experiments

    By J. D. Verhoeven

    In a recent study1 this author has investigated the effect of an electric field upon the solute redistribution accompanying solidification of Sn-Bi alloys. It was concluded that the primary effect of

    Jan 1, 1968

  • AIME
    PART V - Communications - Electrolytic Preparation of Metal Phosphides

    By Don H. Baker

    THE need for new or improved refractory materials has caused metal phosphides to be given renewed scrutiny. Some metal phosphides show high-temperature inertness, are exceptionally hard, and exhibit a

    Jan 1, 1968

  • AIME
    PART V - Communications - Kinetics of the Formation of NiB

    By N. R. Adsit

    THE B-Ni system was chosen for this study because of the great interest being shown in boron-fiber-strengthened composite materials. Boron fibers were obtained from Texaco Experiment, Inc. They ave

    Jan 1, 1967