Search Documents

Sort by

  • SAIMM
    Optimization of Circuits for Pressure Leaching of Sulphide Ores and Concentrates

    "Pressure leaching is an option for copper recovery from chalcopyrite. Leaching takes place at high temperatures and pressures in the presence of an oxidizing agent. This work shows how the performanc

    Jan 1, 2016

  • CIM
    Optimization of clean coal specifications

    By L. X. Li

    Coking coal producers often encounter variations in clean coal quality when mining multiseam deposits containing coals with different washability and coking properties. This paper describes how, for a

    Jan 1, 2014

  • SAIMM
    Optimization of coal mine parameters to provide safe operation

    By A. M. Bryukhanov, A. G. Mnukhin

    The report states accident rates for gassy/dusty coal mines represented as an ergatic system "man – machine - environment" with further analysis by the method of conditional probabilities. A coal

    Jan 1, 2003

  • SME
    Optimization Of Coal Mine Ventilation Systems

    By G Luxbacher

    Computer simulation of mine ventilation systems is rapidly becoming an essential tool in mine planning and design. This paper examines the utilization of ventilation simulation techniques to evaluate

    Jan 1, 1977

  • AIME
    Optimization of Coal Mine Ventilation Systems (5bc092bb-d711-44b9-81d1-60e0e755b2ac)

    By R. V. Ramani, G. W. Luxbacher

    Computer simulation of mine ventilation system is rapidly becoming an essential tool in mine planning and design. This Paper examines the utilization of ventilation simulation techniques to evaluate t

    Jan 1, 1980

  • TMS
    Optimization of Coke Rate and Sinter Quality by Genetic Algorithm for Two-Layer Sintering of Iron Ore

    By Niloy K. Nath

    Two layer sintering by charging green sinter mix with normal coke rate in the upper layer and reduced coke rate in the lower layer, can substantially reduce the coke rate and also improve the sinter q

    Jan 1, 2003

  • SME
    Optimization Of Coking Coal Mining System In India - A Case Study

    By M. Jawed

    Coking coal reserves in India are distributed geographically in Giridih, Raniganj, East Bokaro & Jharia Coalfields (J.C.F.). 97% of prime coking coal in JCF coming through underground mines is credite

    Jan 1, 1989

  • IMPC
    Optimization of comminution circuit and mine-plant integration at Cerro Corona

    By Ronald Díaz

    "Cerro Corona is a porphyry ore with different geometallurgical units and alterations produced by an extensive family of geological failures that have determined a special type of mineralization. With

    Jan 1, 2014

  • SME
    Optimization Of Conditioning Parameters In Phosphate Flotation Using Statistical Design

    By Michael Fahey, Ravi M. Damodaran, Brij M. Moudgil

    The flotation behavior of Florida phosphates was studied using statistical design of experiments to evaluate conditioning parameters and their effect on flotation performance. The solids loading, cond

    Jan 1, 1995

  • SAIMM
    Optimization of Conditions for the Preparation of Activated Carbon from Olive Stones for Application in Gold Recovery

    By M. Louarrat, G. Enaime, A. Yaacoubi, A. Baçaoui, J. Blin

    "The purpose of this study is to prepare a new activated carbon from olive stones for use in gold recovery by carbon-in-leach (CIL) and carbon-inpulp (CIP). The preparation method chosen was physical

    Mar 1, 2019

  • TMS
    Optimization of Continuous Slag/Matte Separation in Mitsubishi Process by Using Numerical Heat and Fluid Flow Analysis

    By Akira Kaneda, Nozomu Hasegawa

    "In the Mitsubishi Continuous Copper Smelting and Converting Process, slag/matte mixture overflowed from the smelting furnace is separated continuously in an electric furnace (slag cleaning furnace, C

    Jan 1, 2000

  • SME
    Optimization of Costs for Trackless Mining Ventilation and Cooling Systems

    By C. A. Rawlins, P. Rostami

    "Ventilation systems are not only an integral part of any underground mine design but are a significant contributor to the mine’s capital and operating costs. The ventilation and cooling design system

    Jan 1, 2015

  • CIM
    Optimization of Cu SX by Control of the Acidity

    By B. Grinbaum

    The solvent extraction of Cu from acidic leach solutions is carried out using oxime extractants. The mechanism can be described as liquid ion exchange, where a labile H+ in the oxime replaces Cu++ ion

    Jan 1, 2007

  • SAIMM
    Optimization of Cut-Off Grades Considering Grade Uncertainty in Narrow, Tabular Gold Deposits

    By C. Birch

    "Mineral reserve statements as well as optimizing mine planning require a block model with grades for each mining block. A cut-off grade is determined by considering the mining costs as well as the ex

    Jan 1, 2017

  • SME
    Optimization of Cut-off Grades for Molybdenum and Tungsten Open-pit Mines

    By Qiong Wu, Qinghua Gu, Yichuan Lv, Jin Yuan, Caiwu Lu

    "The cut-off grade is one of the important parameters of mining production. Different material cut-off grade is directed to different destinations. Based on reasonable and optimal cut-off grade, long

    Jan 1, 2017

  • DFI
    Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation - Using Pressuremeter Testing In Slotted Sleeve Casing (8ff70823-b892-4925-865f-fae636443d0f)

    By Emad Farouz, Roger Failmezger

    "The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos

    Jan 1, 2007

  • DFI
    Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation USING PRESSUREMETER TESTING IN SLOTTED SLEEVE CASING

    By Emad Farouz, Roger Failmezger

    "The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos

    Jan 1, 2007

  • DFI
    Optimization Of Design Of Drilled Shaft Foundations By Lateral Load Testing

    By Donald R. Clark

    Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re

  • DFI
    Optimization of Design of Drilled Shaft Foundations by Lateral Load Testing (94ee84ca-5eda-40d1-bba2-d7742a925002)

    By Donald R. Clark

    "Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re

    Jan 1, 2017

  • ISEE
    Optimization of Development Drilling and Blasting in an Underground Mine

    By B Mohanty, G Ludwig

    A thorough assessment of development drilling and blasting practice was carried out at two underground mines at INCO operations in Thompson, Manitoba. The study showed that significant improvement in

    Jan 1, 1998