Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimising Plant Feed Quality and Process Performance Using Geoscan Elemental Analysis (ca3c00f6-f1ec-4b33-9dcb-bab9729026ee)"Geoscan is used for multi-elemental analysis of conveyed bulk materials in the minerals industry with proven performance and demonstrated paybacks of weeks or months in iron ore, manganese, copper, z
Jan 1, 2016
-
Optimising Project Value and RobustnessBy W Stange, N Hanson
An important aspect of the project evaluation process is the achievement of a clear and quantitative understanding of the primary drivers influencing project value and risk. A business scenario-based
Jan 1, 2007
-
Optimising Project Value And Robustness (77d01627-3b0d-44f3-b691-f65dafcd411c)By G. Whittle
An important aspect of the project evaluation process is the achievement of a clear and quantitative understanding of the primary drivers influencing project value and risk. A business scenario-based
Jan 1, 2007
-
Optimising Raising Development Using the Drop Raise Method at DOZ Mine PT Freeport IndonesiaBy M E. Rakidjan
The DOZ underground mine at PT Freeport Indonesia is a copper and gold mine in Indonesia with current ore production of 42 000 tpd. Because of the mine expansion into the West DOZ more ventilation rai
Jan 1, 2005
-
Optimising Stope Sequences for Long Term Mine PlanningBy André van Wageningen
Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos
May 1, 2004
-
Optimising The Ammonia-cyanide Leaching Process For Copper-gold OresBy David Muir, Slobodanka Vukcevic
Gold is commonly associated with copper minerals, particularly in the more geologically recent rocks of Northern Australia, Chile and the Pacific Rim. Traditionally, oxidised copper-gold ores are sel
Jan 1, 1995
-
Optimising the Compressive Behavior of Screw Piles in Sand for Marine Renewable Energy ApplicationsBy Andrew J. Brennan, Jonathan A. Knappett, Lewis Hamilton, Michael J. Brown
"Abstract This paper investigates the compressive behaviour of screw piles in sands and the key design parameters which control this. These types of foundation elements have typically been used as scr
Jan 1, 2014
-
Optimising the Drilling Budget with Geophysical LoggingBy Fullagar P. K
In resource definition and mine development, major capital expenditures are committed on the basis of sparse information and even in production surprises such as bad ground are not uncommon. Drill h
Jan 1, 1997
-
Optimising The Effective Use Of Energy In The Ferroalloy Industry Through Innovative TechnologyBy A. M. Hearn, J. G. Roos
Energy consumption, being a large proportion of the input of the ferroalloy production process, can be measured in terms of the efficiency with which the energy is utilized and the effectiveness with
Jan 1, 2004
-
Optimising the Loading System of Gol-e-Gohar Iron Ore Mine of Iran by Genetic AlgorithmBy M Akbarpour, M Osanloo
In mining industries, materials handling costs represent a significant component of the operational cost. A variety of methods have been applied in surface mine equipment selection in order to select
Jan 1, 2007
-
Optimising the Long Term Profit base for Consolidated Rutile LimitedConsolidated Rutile Limited (CRL) was one of the best performing mining stocks of the turbulent 1980s, having a very high payout of franked dividends. In contrast to some other mining groups, it was
Jan 1, 1991
-
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer ProgrammingBy Y Li, S Ramazan, E Topal
A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t
Nov 24, 2014
-
Optimising the Management of CIP/CIL CircuitsBy K. Barbetti
"The carbon-in-pulp (CIP) process has been the dominant gold recovery process since the early 1980s. CIP has proven to be very adaptable for a wide range of ores and circuit configurations. The key pe
Jan 1, 2017
-
Optimising the operation of paste thickening at the Yara Siilinjärvi PlantBy E Ruhanen, S Kauvosaari, M Kosonen, C Meintjes
The Yara Siilinjärvi plant is located in the central part of Finland. Siilinjärvi is Western Europe's only apatite mine and annually it produces 1 Mt of apatite concentrate, which create
Aug 29, 2018
-
Optimising the Operation of Paste Thickening at the Yara Siilinjärvi Plant (8a3674cf-2785-43be-b17f-05be124f63bf)"Yara Siilinjärvi in Finland is the Western Europe's only apatite mine. Annually it produces one million tons of apatite concentrate, which creates 10 million tons of tailings. At the beginning of 201
Jan 1, 2019
-
Optimising the Production Chain from Resource to ProductBy P Cameron
Many products and technologies have been developed from outcomes of research projects carried out by the Julius Kruttschnitt Mineral Research Centre (JKMRC). When these products and technologies are a
Jan 1, 2002
-
Optimising the ramp design in an open pit mine APCOM 2021By I. Kaabachi, F. Meunier, N. Morales
In open pit mining, ore and waste are hauled outside of the excavation area by trucks that move along a system of ramps. The design of these ramps must be carefully addressed because they have to comp
Sep 1, 2021
-
Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fillBy D Pateman, F de Fredrick
The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)
Mar 15, 2021
-
Optimising the Telfer Pyrite Regrind Circuit – Effect of Dissolved Oxygen DemandBy D R. Seaman, B Adamson, P Sharman, M McMahon
"The Telfer processing plant commissioned its pyrite regrind and flotation circuit in August 2012. The circuit was designed to regrind pyrite concentrate to a p80 of <30µm then float a gold
Oct 10, 2016
-
Optimising the Usage of Magnetite at a Modern Coal Preparation PlantBy Hoban M, Smith CJ
Norwich Park Mine commenced production of export coking coal in November 1979. Attention to consumables control was limited during the early running of the plant. Once higher than anticipated magne
Jan 1, 1978