Search Documents

Sort by

  • ABM
    Optimisation Of Cold Rolling Mills

    By J. N. Stevens, M. Tulwin, P. J. Lawlor

    All metals producers are on an unending search for a competitive advantage. They need to produce in the most cost effective way. Sometimes a new mill might be considered but in this paper we present e

    Oct 1, 2019

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016

  • AUSIMM
    Optimisation of constant rate of loading slurry consolidometer testing of fine-grained coal tailings

    By D J. Williams, S Islam

    Fine-grained coal tailings slurry undergoes only limited settling and self-weight consolidation, and tends to remain slurry-like and unsuitable for conventional laboratory consolidation testing. In ad

    Jul 23, 2018

  • AUSIMM
    Optimisation of Copper Electrowinning at BHAS

    By Mark C. J

    Since the commissioning of the BHAS Copper Plant in 1984 the copper electrowinning operations have not fully met expectations. During 1988, a laboratory scale electrowinning unit was constructed to

    Jan 1, 1989

  • AUSIMM
    Optimisation of copper treatment at Mount Isa Mines Limited

    By Canning RL, Pritchard J

    The surface treatment works in the Mount Isa Mines Limited copper stream consist of a concentrator and smelter with annual capacities of 5.6 million tonnes of ore and production of 155 000 tonnes

    Jan 1, 1986

  • IIMP
    Optimisation of Crushing and Grinding Circuits Using Steady-State Simulation

    By C. A. Brown

    "Steady-state simulation has been used for over 20 years to optimise the operation of crushing and grinding circuits. Throughout that period continuing comminution research has been the basis for impr

    Sep 12, 2005

  • AUSIMM
    Optimisation of Cut-Off Grade at Mount Isa Mines Limited Æs Enterprise Mine

    By G MacSporran, I Sheppard

    The practical application of LaneÆs theory on optimum cut-off grade policy has to date proved difficult for selective stoping in large-scale underground mining. The key to determining an optimum cut-o

    Jan 1, 2003

  • AUSIMM
    Optimisation of Cut-off Grades During Design of Underground Mines

    The theory of declining optimimum cut-off grades is more than 25 years old, but for a number of reasons it is still not widely used in industry. A lack of faith in the veracity of estimated grades i

    Jan 1, 1991

  • AUSIMM
    Optimisation of Drill and Blast for Mill Throughput Improvement at Ban Houayxai Mine

    By D Symonds, S S. Kanchibotla, L Kennelly, G McNamara, J Gaunt, B Adiyansyah

    Ban Houayxai is a gold-silver mine operated by Phu Bia Mining Limited in Laos since 2012. The first two years of operation processed predominately soft oxidised ore but subsequent years were expected

    Aug 24, 2015

  • AUSIMM
    Optimisation of Electrowinning Operations at Girilambone Copper Mine

    By Braaksma M, Dudley K

    The Girilambone Copper Mine is located in central New South Wales and has been operational since May 1993. Girilambone is operated by the Girilambone Copper Company (GCC) which is a joint venture b

    Jan 1, 1996

  • AUSIMM
    Optimisation of Excavator Performance When Mining Complex Polymetallic Ores

    By U Dzharlkaganov, B Bekmurzayevand M

    The principle conception is presented of timely planning of winning operations in complex-structural blocks and faces in week-24-hourly regime. For adequate description of complex interconnections of

    Jan 1, 2003

  • AUSIMM
    Optimisation of Flotation Circuit Configuration at PT Newmont Nusa Tenggara

    By K McCaffery, R P. Halomoan

    Two column flotation cells have been installed as single-stage rougher cleaners at Batu Hijau. The objective was to provide additional residence time in the cleaner circuit to maintain maximum recover

    Jan 1, 2007

  • SAIMM
    Optimisation Of Flotation Circuit Configuration At PT Newmont Nusa Tenggara (cfd7ecd0-efe3-4487-b843-71559e2ce6be)

    Two column flotation cells have been installed as single-stage rougher cleaners at Batu Hijau. The objective was to provide additional residence time in the cleaner circuit to maintain maximum recover

    Jan 1, 2007

  • AUSIMM
    Optimisation of Flotation Circuits With Large Flotation Cells

    The recent trend of installing flotation cells with volumes as large as 200 m3 in concentrators is driven mainly by economic considerations such as lower capital, operating and maintenance costs. Desp

    Jan 1, 2005

  • CIM
    Optimisation of Flotation Pulp Selectivity Utilising Nodal Analysis

    By Kym Runge, Emmy Manlapig

    "The objective of an industrial flotation circuit is to separate valuable minerals from non-valuable minerals utilising differences in their flotation recovery rate. Regrinding and reagent addition ar

    Jan 1, 2004

  • AUSIMM
    Optimisation of Grinding Circuits at the Lead/Zinc Concentrator, Mount Isa Mines Limited

    By Drinkwater DJ, Watsford RMS, Johnson NW, Munro PD

    This paper describes the use of modelling and simulation techniques in the analysis and optimisation of grinding circuits at the Lead/Zinc Concentrator of Mount Isa Mines Limited.The objectives of the

    Jan 1, 1985

  • IMPC
    Optimisation of Grinding Process in a Magnetite Ore Beneficiation Plant

    By M. D. Vilarinho, W. Xuan, F. Vasconcelos Guimarães

    "This article summarises the efforts to reduce the energy consumption in grinding in a magnetite ore beneficiation plant. ArcelorMittal Kryvyi Rih ore beneficiation plant produces magnetite concentrat

    Jan 1, 2018

  • AUSIMM
    Optimisation of Hydraulic Filling for Underground Disposal of Tailings in Peru

    By D M R Stone

    Failings di,posal presents many challenges at metal mines in Peru where the extreme relief yields very little useable land area. These challenges are amplified by other hazards such as the high seis

    Jan 1, 1998

  • AUSIMM
    Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes Mines

    By F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan

    "Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th

    Oct 10, 2016

  • AUSIMM
    Optimisation of Length of Retreat Longwall Faces

    By Misra A

    After review of the status of research on optirnisation of retreat longwall faces it is argued that an acceptable optimisation model must be based upon realistic cost data that take into account not o

    Jan 1, 1995