Search Documents

Sort by

  • IMPC
    Optimisation Aspects of Compressive Crushing

    Compressive crushing is applied in crushing plants used in mineral, mining, and aggregate in-dustry for fragmentation of rock materials. From a global perspective, the total volume of crushed rock is

    Jan 1, 2014

  • AUSIMM
    Optimisation Challenges in Underground Mine Planning and Design

    Underground mine planning is characterised by a series of designs, starting with prefeasibility and culminating in operational. Information on the mineralisation and geotechnical conditions is availab

    Dec 6, 2010

  • CIM
    Optimisation des systèmes pelles–camions en utilisant la théorie des files d’attente

    By D. Komljenovic, J. Paraszczak

    "This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels

    Jan 1, 2004

  • AUSIMM
    Optimisation Improvements for Narrow Vein Open Pit Deposits Using Mineable Shape Optimiser

    By C Mann, S Swapp

    "The mining industry is often challenged with the task of evaluating narrow vein open pit deposits. A realistic mineable solution from optimisation needs to accurately represent mining dilution and th

    Nov 15, 2016

  • AUSIMM
    Optimisation Improvements in Whittle using Stope Optimisation Software

    Mining One (M1) is often challenged with the task of evaluating deposits considering open cut and/or underground (UG) mining methods. In many near surface deposits a combination of both methods result

    Dec 6, 2010

  • AUSIMM
    Optimisation in Long Hole Stope Production Drilling

    By R LEATHAM

    Long hole drilling underground has come a long way since 'down the hole' surface drills were first taken underground. The underground miners have progressively developed the use of long ho

    Jan 1, 1992

  • AUSIMM
    Optimisation in Underground Mine Design

    Optimisation and sensitivity analysis of final pit limits is now an accepted procedure for open pit planning studies. Tools to assist the design engineer in an underground metalliferous mine to make

    Jan 1, 1995

  • AUSIMM
    Optimisation of a Semi-autogenous Grinding Mill through Trajectory and Power Modelling

    By P Toor

    Mill filling is an important operational parameter in a SAG mill circuit and by its control and optimisation it can produce significant improvements in production capacity and energy efficiency. Howev

    Sep 7, 2015

  • AUSIMM
    Optimisation of a Stochastic Rock Fracture Model Using Markov Chain Monte Carlo Simulation

    By D Wyborn, P A. Dowd

    The characterisation of rock fracture networks is an important component of rock engineering applications involving stability assessment or fluid flow analysis. However, the derivation of a reliable r

    Sep 26, 2011

  • AUSIMM
    Optimisation of an Image Analytical System for Bulk Materials Using the Theory of Sampling

    By K H. Esbensen

    Optimisation of a real-time at-line monitoring system for control of industrial granule coating quality is presented. The system is based on a fluorescence imaging system, because fluorescence origina

    Jan 1, 2005

  • SAIMM
    Optimisation Of Anglo Platinum?s ACP Acid Plant Catalytic Converter

    By M. K. Sichone

    Anglo Platinum?s Waterval smelting complex based in South Africa operates the Anglo Converting Process (ACP) that produces SO2 offgas. This SO2 offgas is treated in a double-contact, double-absorption

    Jan 1, 2009

  • AUSIMM
    Optimisation of Asanko’s Obotan SABC circuit to achieve ‘Project 5 Million’

    By R Bradford, W Gift-Agbey, T Vorster, P Morgan, E Grobler

    The Asanko Gold Mine in Ghana started processing ore from the Nkran pit in January 2016 at a production nameplate of 3 Mt/a. The flowsheet is a conventional SAG, ball mill and pebble crusher (SABC) w

    Aug 29, 2018

  • AUSIMM
    Optimisation of Ball Charge Kinetics in Ball Mills

    Research programs have established the correlation between the basic mill operating parameters such as: size of crushing products, number of mill rotation, ore flow and quantity of ore in the mill,

    Jan 1, 1993

  • AUSIMM
    Optimisation of Blasting in a Large Open Pit Mine

    By Miles M. J, Sandy D. A

    It has long been known that drilling and blasting operations have a direct influence over productivity and costs of subsequent operations. If mine management is to effectively optimise blasting oper

    Jan 1, 1990

  • CIM
    Optimisation of Cake Moisture at the Leached Sludge Filter Press

    By P. Belley

    Prior to 2006, the filtration unit for leached sludge treatment (filter press) permitted the filtration, washing and drying of cake to 17% (w/w) moisture. That year saw moisture content abruptly incre

    Jan 1, 2007

  • AUSIMM
    Optimisation of cemented rock fill strength for open stope support

    By J Player, R de Vries, E Villaescusa, H Saw, R Hassell

    The use of cemented rock fill (CRF) for support of open stope walls has increased in the Australian underground mines operations over the last five years due in part to its low capital cost. In open s

    Oct 16, 2017

  • AUSIMM
    Optimisation of Circuits for Gold Pressure Oxidation

    By F Saloojee, F K. Crundwell

    Refractory ores need to be pretreated prior to cyanide leaching for acceptable gold recovery. Pressure oxidation is one method of rendering the ores more suitable for cyanidation. The focus of this wo

    Sep 26, 2013

  • SAIMM
    Optimisation of Circuits for Pressure Leaching of Sulfide Ores and Concentrates

    By Fadeela Saloojee, Frank K. Crundwell

    "Pressure leaching is an option for copper recovery from chalcopyrite. Leaching takes place at high temperatures and pressures in the presence of an oxidising agent. This work shows how the performanc

    Jan 1, 2015

  • AUSIMM
    Optimisation of Coal Production from Mine Face to Customer

    The technology of coal preparation, while based on similar processes to those in common useage in the 1950s, has improved significantly over the past 15 years primarily due to advances in process cont

    Jan 1, 1992

  • CIM
    Optimisation of Coke Breeze Addition in Iron Ore Pellets

    By G. Paquet, E. Godin

    "Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as

    Jan 1, 1986