    Open Pit Optimization Considering An Underground Alternative - Introduction

    By Juan P. Camus

    One of the most important decisions in mine development is the selection of the mining method. Open pit or underground methods are selected depending on the shape of the deposit, and its position with

    Jan 1, 1992

  • SME
    Open Pit Optimization Using Artificial Neural Networks on Conditionally Simulated Blocks

    By Peter K. Achireko, Samuel Frimpong

    Design and optimization of open pit limits are of paramount importance because they provide information for evaluating the economic potential of a mineral deposit and for developing short and long ran

    Jan 1, 1996

  • AIME
    Open Pit Or Underground, Operators Need Engineered Blending Of Uranium Ores

    By Edwin T. Wood

    THE term blending as used herein refers to the mixing of ores assaying more than 0.20 pct U3O8 with low grade material assaying less than 0.20 pct U3O8. Such blending when properly understood and cont

    Jan 7, 1958

  • SAIMM
    Open Pit Planning

    "Chairman: Professor E. P. PFLEIDER Rapporteur: Mr P. R. JANISCHPapers:Optimum design of an open pit by D. A. PhillipsAn open pit design system for stratiform ore bodies by L. A. J. Pronk van Hoogevee

    Jan 1, 2014

  • SME
    Open Pit Planning And Selective Mining Practices At The New Celebration Gold Mine

    By Barrie W. Sullivan

    The New Celebration Gold Mine near Kalgoorlie in Western Australia was commissioned in late 1986 and the CIL treatment plant currently processes 1.7 million tonnes of gold ore annually. The 1988 g

    Jan 1, 1989

  • AIME
    Open Pit Porphyry Copper Mine-Block Inventory Update For Production Planning

    PURPOSE OF UPDATED ESTIMATE FOR MINERAL INVENTORY BLOCKS During the production stage of an open pit porphyry copper mine it was observed that the expected production grade, as determined from the

    Jan 1, 1980

  • SME
    Open Pit Practice At Endako Mine ? Introduction

    By A. M. Laird

    Endako Mines' molybdenum operation is located near the geographic center of the province of British Columbia, Canada. The property is six miles south of the Northern Transprovincial Highway and t

    Jan 1, 1968

  • SME
    Open Pit Production Planning Through Pit-Generation And Pit-Sequencing

    By H. Sevim

    The logic and capabilities of a long-term production planning method for open pit mining are presented. This is a new method that can be used to obtain simultaneous solutions to the four interrelated

    Jan 1, 1994

  • SME
    Open Pit Production Planning Through Pit-Generation And Pit-Sequencing (9f1bec4e-18ef-4677-bf91-9c98a79e9b13)

    In this paper, the logic and the capabilities of a long term production planning method for open pit mining are presented. The method is the first attempt in obtaining simultaneous solutions to the fo

    Jan 1, 1993

  • CIM
    Open Pit Production Planning using Controlled Pushbacks and Aggregates

    Open pit production planning is a procedure consisting of multiple stages. Although all the planning stages rely on the geostatistical block models, long- to short-term plans each require their approp

    Aug 1, 2013

  • AUSIMM
    Open Pit Production Scheduling Optimisation - Why the Mining Industry Needs a New Phase Design Approach

    The long-term production schedule of open pit mines that maximises the net present value (NPV) of a given project relies on the proper design of phases (pushbacks) within the ultimate pit limits. Ther

    Dec 6, 2010

  • SME
    Open Pit Production Sequencing: Pseudo-Economic Discretization Versus Technological Discretization

    By R. A. Halatchev

    Historically two basic approaches of production sequencing have been formed in the theory of open pit mine design. The first approach implements a technological discretization of the pit space within

    Jan 1, 2003

  • SME
    Open Pit Sequencing And Scheduling

    By Graham A. Mathieson

    The precise definition of an ultimate or economic pit has, over the years, received much attention in the literature on the subject of mine planning. Unfortunately, relatively little has been publishe

    Jan 1, 1982

  • SME
    Open Pit Slope Design And Stability Challenges At The Rio Tinto Borax Boron Mine

    By J. R. Mattern

    The engineering geology of the Rio Tinto Borax Boron Mine creates challenges in providing practical slope design recommendations to mine planning engineers. Low strength sedimentary units interbedded

    Jan 1, 2004

  • SME
    Open Pit Slope Design In Soil-Like Materials ? Introduction

    By J. F. Lupo

    There are numerous mines throughout the world that have open pit highwalls developed partially or wholly in soil or soil-like materials. Soil-like materials are considered to include soils (either tra

    Jan 1, 2011

  • AIME
    Open Pit Slope Stability Investigation of the Hasancelebi Iron Ore Deposit, Turkey

    By Caner Zanbak, Erdogan Yüzer, Mahir Vardar, Kemal A. Erguvanli

    The Hasancelebi iron deposit in Eastern Turkey is a very low grade (average 20% oxide) magnetite body consisting of 720 million longtons of proven reserve at a 10% cut-off limit. The ore-bearing scapo

    Jan 1, 1983

  • AUSIMM
    Open Pit Strategic Mine Planning with Automatic Phase Generation

    By M Recabarren, A Echeverria, J Ronda, J I. Guzman, R Dodds, G Juarez, E Vila-Echague

    A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic and operative extraction and processing schedule, and yield the highest value for the business. For ope

    Nov 24, 2014

  • SME
    Open Pit TBM Driven Drainage Tunnel?Ok Tedi Mine

    By Tony Peach

    Project Description The Ok Tedi Mine is located approximately 18 km east of the Papua and New Guinea-Indonesia border, on the southernmost extremity of the Star Mountains Range, it is situated almost

  • AUSIMM
    Open Pit to Underground ù Transition and Interaction

    By P J. Terbrugge

    Many ore deposits have considerable vertical extent which is not always known at the time of commencement of mining. In many of these cases, initial mining is by opencast methods, and as ore reserves

    Jan 1, 2000

  • AUSIMM
    Open Pit Transition Depth Determination through Global Analysis of Open Pit and Underground Mine Production Scheduling

    By K Dagdelen, I Traore

    This paper presents an iterative net present value (NPV) maximisation method to determine the optimum surface to underground transition depth for an orebody to be mined by multiple open pits and an un

    Nov 24, 2014