Search Documents

Sort by

  • AIME
    Open Pit Forum - Truck Body Cleaning

    By C. A. LINDBERG

    Several new methods have been developed on the Iron Range to remove the material adhering to truck bodies in freezing weather. A machine known as a Gradall, incorporating the features of digging both

    Jan 1, 1949

  • AIME
    Open Pit Forum – Cost Performance Operation

    By R. E. Sinke

    Demerara Bauxite Co. in British Guiana has come a long way in tackling the problem of stripping and removing overburden. When the company started mining in 1917, overburden was hand-loaded into carts

    Jan 4, 1955

  • AIME
    Open Pit Forum – The Lavender Pit

    By Warren T. Smith

    The Phelps Dodge Corp. Lavender pit is located in the Bisbee mining district near the town of Lowell, Ariz. A quartz monzonite porphyry exists as an intrusive stock and was the source of mineralizatio

    May 1, 1956

  • SME
    Open Pit Geometry Modeling And Economic Analysis Of Novel At-Face-Slurry Options

    The evolution of surface mine layout configuration is a function of the schedules and sequence of material excavation within the optimized layouts. The production schedules and sequence of materials m

    Jan 1, 2011

  • AUSIMM
    Open Pit Gold Potential Charters Towers Vein Systems

    This case study reviews the Charters Towers vein systems for potential open-pittable bulk tonnage resources in' stockworks, horsetails or multiple vein systems. The review summarises district eva

    Jan 1, 1986

  • SME
    Open Pit Limit Analysis - Some Observations On Its Use ? Introduction

    By John T. Crawford

    Various open pit limit-analysis techniques have been utilized for many years to design pit limit surfaces. In the last 15 years there have been many advances in developing sophisticated computer metho

    Jan 1, 1979

  • AIME
    Open Pit Loading Analysis For Better Cost Control

    By Paul-Emile Mercier

    LOADING efficiency depends on cycle capacity of the loader, conditions of the mine, and mine organization. Cost of operation is the final criterion. Two types of loaders are analyzed-the boom shovel

    Jan 4, 1957

  • CIM
    Open Pit Mind Dewatering- Knob Lake

    The purpose of this paper is to present the methods used in ground water control and the considerations that affected the development of these techniques. Production at Knob Lake is currently proceedi

    Jan 1, 1965

  • CIM
    Open Pit Mine Dewatering= Knob Lake

    The purpose of this paper is to present the methods used in ground water control and the considerations that affected the development of these techniques. Production at Knob Lake is currently proceedi

    Jan 1, 1965

  • SME
    Open Pit Mine Optimization with Maximum Satisfiability

    By M. Deutsch

    A common casualty of modern open pit mine optimization is the assurance that the resulting design is actually achievable. Optimized mine plans that consider value and a bare minimum of precedence cons

    Jan 1, 2019

  • CIM
    Open Pit Mine Planning: A Practical Optimization and Evaluation Approach Under Uncertain Markets

    By Sabry A. Sabour

    Metal price is among the key variables in the open pit optimization and the economic evaluation process. The common approach to handle metal prices in open pit mine planning is to optimize the ultimat

    Aug 1, 2013

  • AUSIMM
    Open Pit Mine Production Scheduling

    By Giannini L, Kelsey P

    A fundamental problem in mine planning is the determination of the production schedules over the life of the mine. The objective is to maximise profit in terms of the net present value without trans

    Jan 1, 1998

  • SME
    Open Pit Mine Production Scheduling with Stockpiling Using Constraint Programming

    By Biswajit Samanta, Rahul Kumar, Pranjal Pathak

    The Open Pit Mine Production Scheduling Problem (OPMPSP) is a complex optimization problem that seeks to determine the best sequence for extracting mineralized material from the ground in order to max

    Jun 25, 2023

  • SME
    Open Pit Mine Scheduling Based On Fundamental Tree Algorithm

    By Kadri Dagdelen, Thys B. Johnson, Salih Ramazan

    Long-term production scheduling design is a very important part of mining because it determines the economic outcome of a project There have been many attempts to solve the optimum pit scheduling prob

    Jan 1, 2002

  • AUSIMM
    Open Pit Mine Slope Engineering: A 2002 Perspective

    In most surface mining operations, overall project economics is driven to a significant extent by the slope angles that can be achieved within the rock masses present. This is particularly true of pre

    Jan 1, 2002

  • AIME
    Open Pit Mining - Aluminum Off-Highway Truck Bodies for the Mining Industry

    By R. A. Esmonde

    This paper describes the building and testing of a prototype welded aluminum truck body to a new design concept. The results of these tests are given along with an outline of further developments in t

    Jan 1, 1969

  • AIME
    Open Pit Mining - Application of Rippers in Mining

    By D. V. Fites

    Criteria for deciding when rock should be ripped and what ripping equipment and techniques should be used in given situations are discussed in this article. The relation between ripper performance and

    Jan 1, 1969

  • AIME
    Open Pit Mining - Determination of Equipment Availability

    By J. J. Sense

    This paper deals with the Asarco method for the determination of equipment availability. It is apparent that no single availability equation will provide all of the information necessary for the compl

    Jan 1, 1964

  • SME
    Open Pit Mining - Florida Land Pebble Phosphate Deposits

    By M. T. Smith

    In a 2,000 square mile area of Polk, Hillsborough, Hardee and Manatee Counties in Central Florida is located one of the richest known deposits of the life-giving mineral, phosphorus. Under layers of s

    Jan 1, 1962

  • AIME
    Open Pit Mining - How Far Can Chemical Crushing with Explosives in the Mine Go Towards Further Replacement of Mechanical Crushing in the Plant?

    By Charles H. Grant

    Some of the limiting factors relative to explosive crushing of rock and ways to overcome a few of these problems are presented. Relationships between borehole diameters, bench heights, and spacings, a

    Jan 1, 1970