Search Documents

Sort by

  • NIOSH
    OFR-74-76 Preliminary Engineering And Economic Evaluation Of Underspoil Haulage In Area Strip Coal Mines - Part I ? Executive Summary

    Coal, America's most abundant fossil fuel, is expected to play a key role in our pursuit of energy independence. A substantial increase in coal exploitation will be required if we are to fulfill

    Jan 1, 1975

  • NIOSH
    OFR-74-77 Parametric Study Of Coal Cutting With The Cavijet - Cavitating Water Jet Method

    By Andrew F. Conn

    This report summarizes the results from the first year of an anticipated multiphase program to develop improved coal mining equipment which utilize the CAVIJET? cavitating water jet method. This labor

    Jan 1, 1976

  • NIOSH
    OFR-74-78 Waveform Generator-Package And Receiver (Mancarried And Helicopter Receiver Portion) (d0ba41ae-0b3f-47f3-9920-d3b1a270d5e4)

    By Charles Anema

    The Mancarried and Helicopter Receivers were developed under the contract for trapped miner location. This program was a five phase program with 15 mancarried and 5 helicopter production receivers del

    Jan 1, 1976

  • NIOSH
    OFR-74-79 Fabrication And Evaluation Of Optimized Operator Compartments

    By D. Christofferson

    This final report documents the cooperative efforts of the Engineered Systems Division and the Mining Equipment Division of FMC Corporation during performance of Bureau of Mines Contract H0252091. Imp

    Jan 1, 1978

  • NIOSH
    OFR-74-83 Downhole Rock Borehole Shear Tester

    By R. L. Handy

    The goal of this research was to adapt the highly successful rock borehole shear test for use in deep, small-diameter boreholes. Operating somewhat on the principle of a rock bolt, the borehole shear

    Jan 1, 1982

  • NIOSH
    OFR-75-77 Practical Pillar Design Problem Encountered Under Deep Cover And With Different Block Geometric Pillar

    By Glenn A. Hazen

    This report presents a stress investigation of four coal pillars located under two depths of cover. Each coal pillar was instrumented with ten load cells designed to measure coal pressure during initi

    Jan 1, 1975

  • NIOSH
    OFR-75-78 Final Report - Hydraulic Transport Research Facility - Volume I

    [This Report represents the culmination of work perfomed under Contract No. .,JG1551A8 for the U.S. Bureau of Mine.The &apos;.:o-< embeded a site evaluation, engineering E:-y- ,, esign, and preparati

    Jan 1, 1976

  • NIOSH
    OFR-75-79 A Statistical Evaluation Of The Effects Of Environmental And Operational Parameters On The Production Of Coal Mine Dust

    By G. D. Andria

    Contract J0275007 was to consist of a thorough two-phase statistical analysis of respirable coal mine dust data from USBM Contracts H0232061, H0232060, H0230029, H0230031, H0210050, and H0242013. Cons

    Jan 1, 1978

  • NIOSH
    OFR-75-84 Movable Crusher Systems - Concepts And Applications

    By R. N. Johnson

    This report is a summary of the work performed for the Bureau of Mines to evaluate the feasibility and desirability of a movable in-pit crusher combined with conveyors to substantially reduce or elimi

    Jan 1, 1982

  • NIOSH
    OFR-75-86 Development Of A Reduced-Noise Auger Miner Cutting Head

    By Mark R. Pettitt

    Noise surveys conducted in underground coal mines have consistently indicated that auger mining machines subject the operator and helpers to excessive noise exposure. The machine cutting heads have be

    Jan 1, 1983

  • NIOSH
    OFR-76(1)-75 Mine Electrical Systems Evaluation - Cable Splicing

    By Robert Stefanko

    Test procedures for evaluating underground coal mine trailing cable splices are formulated. The tests are utilized to evaluate several trailing cable splices. The laboratory results are compared with

    Jan 1, 1974

  • NIOSH
    OFR-76(1)-79 Development Of Highwall Mining Equipment (Phase I) Volume I

    By Mandius C. Lundal

    This report describes the work done to develop a coal mining machine to increase productivity and recovery from thin seams beyond the highwall, in addition to decreasing the miner&apos;s susceptibilit

    Jan 1, 1977

  • NIOSH
    OFR-76(2)-75 Mine Electrical Systems Evaluation - Explosion-Proofing Of Mine Containers - Introduction

    By Robert Stefanko

    In the context of the following report, an hazardous location can be described as any industrial area in which flammable or explosive gases, vapors, and dusts can be encountered. When electrical appar

    Jan 1, 1974

  • NIOSH
    OFR-76(2)-79 Development Of Highwall Mining Equipment (Phase I) Volume II

    By Mandius C. Lundal

    This report describes the work done to develop a coal mining machine to increase productivity and recovery from thin seams beyond the highwall, in addition to decreasing the miner&apos;s susceptibilit

    Jan 1, 1977

  • NIOSH
    OFR-76(3)-75 Mine Electrical Systems Evaluation - Transient Analysis - Introduction

    By Robert Stefanko

    Transients are results of sudden changes which take place in power systems and can be created by the opening and closing of switches and circuit breakers or the occurrence of a fault anywhere in the c

    Jan 1, 1974

  • NIOSH
    OFR-76(4)-75 Mine Electrical Systems Evaluation - Mine Power System Performance - Introduction

    By Robert Stefanko

    The growing demand for energy during the post World War I and World War II periods has prompted underground coal production to increase rapidly. This has been met primarily by mine mechanization, resu

    Jan 1, 1974

  • NIOSH
    OFR-76(5)-75 Mine Electrical Systems Evaluation - Model Coal Mine Electrical System Specifications - Introduction

    By Lloyd A. Morley

    Previous research conducted for the USBM by Penn State personnel (Grant GO-101729) found that a need existed to physically model a typical a-c/d-c coal mine section electrical system. Its purpose woul

    Jan 1, 1974

  • NIOSH
    OFR-76-75 Mine Electrical Systems Evaluation - Executive Summary

    By Robert Stefanko

    This report abstracts project work performed for the USBM Grant No. GO-133077 during the period 19 June 1973 to 15 October 1974. Five reports have been separately produced and are as follows: 1.

    Jan 1, 1974

  • NIOSH
    OFR-76-76 Development Of Protective Canopy Concepts For Underground Rail Haulage - 1. Introduction

    By Hanns J. Billmayer

    This report, which covers the period from April 1975 to November 1975, describes the work performed in compliance with the requirements of Contract No. H0357091. The purpose of this contract was the d

    Jan 1, 1976

  • NIOSH
    OFR-76-77 Investigation Of The Various Factors Affecting The Response Of Passive Configuration Track Etch Dosimeters To Working Level Hour Exposure In Radon And Radon Daughter Atmospheres

    By D. B. Lovett

    The work described in this report was directed toward identifying and devising methods to minimize the previously observed variability between working level hour exposures and the alpha particle track

    Jan 1, 1976