Search Documents

Sort by

  • DFI
    Installation and Efficiency of Common Helical Pile Couplings

    By Jason Herron, Joseph Brown

    The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,

    Jan 1, 2019

  • TMS
    Installation And Operating Performance Of The New Dry Concentrate Injection System On The Modified Teniente Converter (CT) Unit At KCMS Nkana Smelter In Zambia

    By Milton Syamujulu

    In 2004, KCM Nkana Smelter commissioned a 1200 tonne per day flash dryer and associated dry concentrate transport and injection system on the existing Teniente Modified converter (CT) unit. The aim

    Jan 1, 2006

  • ABM
    Installation And Operational Result Of Lindarctm Real Time Laser Off-gas Analysis System At Acciaierie Bertoli Safau - Abs (Italy) Electric Arc Furnace

    By Daniele Tolazzi

    In today’s highly competitive market situation, it is of outmost importance for EAF steel makers to optimise their processes in order to reduce operating costs and to improve safety and reliability of

    Aug 16, 2017

  • DFI
    Installation And Performance Characteristics Of High Capacity Helical Piles In Cohesionless Soils

    By Mohammed Sakr

    The use of helical piles as a deep foundation option has considerably increased in the recent years to support a variety of loads, from small loads for several applications such as residential housing

    Jan 1, 2011

  • DFI
    Installation And Performance Characteristics Of High Capacity Helical Piles In Cohesive Soils

    By Mohammed Sakr

    This paper presents the results of a full-scale axial compression and tension (uplift) testing program executed on large-capacity helical piles installed in very stiff to very hard clay till soils (i.

    Jan 1, 2012

  • DFI
    Installation And Performance Of Interlocking Drilled Shaft And Tieback Shoring System - Summary

    By Alec C. Bloem

    A 55' deep excavation encompassing almost a city block in London, Ontario required a lateral earth retention system to provide both temporary excavation support and a permanent groundwater cut-of

    Jan 1, 1991

  • AIME
    Installation And Performance Of Sand Pumps

    By C. G. Southmayd

    ANYONE who has been confronted with the problem of predicting the performance of a sand-pump installation is vitally aware of the dearth of precise information that has been published on this importan

    Jan 1, 1946

  • SME
    Installation and Preliminary Results of a Novel Fiber Optic Distributed Strain Monitoring System in an Active Underground Room and Pillar Metal Mine

    By Taghi Sherizadeh, Paul Brooks, Dogukan Guner, Samuel Nowak

    Large excavations are well known to result in rock mass deformations which can present challenging situations for mine personnel. Most of the currently available ground movement monitoring devices fai

  • DFI
    Installation And Testing Of 260 Hollow Core Bar Micropiles

    By Jesús E. Gómez

    A total of 260 micropiles were installed as part of a retrofit effort for two existing bridges. The micropiles consisted of hollow core bars installed under limited headroom conditions. Of the total n

    Jan 1, 2007

  • DFI
    Installation And Testing Of Instrumented Tieback Anchors - Introduction

    By Joan Stoupa

    The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili­

    Jan 1, 1990

  • DFI
    Installation Checklist For Driving Mega Piles

    By Douglas L. Scaggs

    Over the past several years, pile foundations have grown to meet the demands of larger and heavier structures. As the foundations have grown, so has the need for larger and more robust piles to carry

    Jan 1, 2013

  • DFI
    Installation Effects of Drilled Screw Pile In Soft Clay

    By Jianhua Wang, Jianming Yao, Zhen Meng, Jinjian Chen

    "Drilled screw pile is a newly developed displacement pile foundation which has been applied in soft clay for many years. Compared with traditional circular displacement pile, It is characterized by h

    Jan 1, 2015

  • SME
    Installation Of 0.84 M (33 In) Cyclones On The Primary Grinding Circuit At Cyprus Sierrita Corporation

    By L. N. Hill

    The classifiers on the primary grinding circuit at Cyprus Sierrita have been upgraded from 0.66 m (26 in) diameter hydrocyclones to 0.84 m (33 in) diameter hydrocyclones. This has resulted in a 4.3 %

    Jan 1, 1994

  • DFI
    Installation of 10 Feet Diameter CIDHs in Soft Clay Using Rotator/Oscillator on Trestle

    By Babak Mamaqani, Pirooz Barar

    The Moanalua trestle spanned over Moanalua Stream, Honolulu, HI and was designed to accommodate construction of five 10 feet diameter cast in drilled hole (CIDH) piers as a part of Honolulu Authority

    Jan 1, 2019

  • AUSIMM
    Installation of 17 Cubic Metre Flotation Cells at North Mine, Broken Hill

    By Harris HR

    This paper documents the selection, installation and performance of six, seventeen cubic metre, Dorr-Oliver flotation cells for primary zinc flotation at the North Mine in Broken Hill. The cells wer

    Jan 1, 1988

  • ABM
    Installation Of A 350 T Bof Converter At Arcelormittal Poland

    By Günther Staudinger

    Danieli Linz Technology has been honored at 4.1.2013 with the first contract for the exchange of a 350 t BOF converter for ArcelorMittal Poland Dabrowa Gornicza on a turnkey basis. This paper describe

    Jul 29, 2018

  • NIOSH
    Installation Of A Digital, Wireless, Strong-Motion Network For Monitoring Seismic Activity In A Western Colorado Coal Mining Region

    By Peter Swanson, Collin Stewart, Wendell Koontz

    A seismic monitoring network has recently been installed in the North Fork Valley coal mining region of western Colorado as part of a NIOSH mine safety technology transfer project with two longwall co

  • ABM
    Installation Of A New 80 T Mrp-l Converter At Aperam Timoteo

    By Günther Staudinge

    Aperam is a global player in producing of stainless, electrical and special steel qualities. The steelmaking plant in Timoteo Brasil is equipped with one AODconverter for stainless steel and one MRPL-

    Aug 17, 2017

  • SME
    Installation of a new surface fan at the Homestake gold mine

    By G. R. Struble, J. R. Marks, A. B. Brown

    The center of mining at the Homestake gold mine in Lead, SD, is moving deeper every year. As a result, it has become necessary to upgrade the ventilation system. This paper describes the first phase o

    Jan 1, 1987

  • SME
    Installation Of A New Surface Fan At The Homestake Gold Mine ? Introduction

    By Greg Struble

    The Homestake Gold Mine is one of the deepest and most extensively developed hardrock mines in North America. The mine is divided into five divisions which produce a total of 1.7 million metric tons o

    Jan 1, 1987