Search Documents

Sort by

  • SME
    Improving performance of heavy mineral processing plants through Six Sigma

    By M. Akser, M. Tomas

    Six Sigma is a methodology that uses a structured and disciplined approach to improve process performance (higher throughput, better recovery, lower cost, shorter cycle time, etc.). Specially trained

    Jan 1, 2005

  • IMPC
    Improving performance of the Gol-E-Gohar iron ore concentration plant thickener

    By S. Banisi, E. Arghavani, Gh. Parsapour, S. Mousavi

    Maximization of water recovery in thickeners is an essential step in the mineral processing industries. The Gol-E-Gohar iorn ore processing plant uses a center pier thickener with a diameter of 38 m a

    Jan 1, 2014

  • IMPC
    Improving Performance of the Sarcheshmeh Copper Complex Cu-Mo Thickener

    By F. Molhem, S. Banisi, H. R. Montazari, E. Arghavani, Gh. R. Biniyaz, Gh. A. Parsapour

    "Water plays a key role in mineral processing plants and to process one ton of ore 2.5 ton water is needed. Thickeners are commonly used for dewatering and recovering water in most processing plants.

    Jan 1, 2018

  • SME
    Improving Performance Through "Gainsharing"

    By Walter E. Cook

    BOB FALCONER: Without further ado I'm going to introduce our first speaker, Walt Cook. Walt is president of Strata Resources and is here with his business partner Joe Nenni. Joe would you stand u

    Jan 1, 1998

  • SME
    Improving Phosphate Flotation With New Chemistry, Smart Flowsheet And Novel Equipment

    By P. Zhang

    The Crago “Double Float” process is widely used in upgrading phosphate ore. This process is inefficient, as it floats about 30-40% of the sands in the flotation feed twice and requires a deoiling step

    Jan 1, 2004

  • AUSIMM
    Improving Plant Operations Using Synergistic Solvent Extraction Technology and Organic Monitoring

    By K B. Barnard, M D. Urbani

    A synergistic solvent extraction (SX) system for nickel and cobalt recovery using Versatic 10 and decyl-4-pyridinecarboxylate was tested with BHP Billiton pilot plant leach solution. Another synergist

    Jan 1, 2005

  • SME
    Improving Plant Performance with "World-Class" Management Techniques

    By Bruce W. Cavender

    There is a tendency for managers of mining companies to regard the performance of a process plant as essen­tially fixed, with only incremental improvements to be realized by optimizing individual unit

    Jan 1, 1993

  • CIM
    Improving Pore Water Quality in Reactive Tailings with Phosphate Mining Wastes

    By M. Kalin

    Tailings deposits are frequently the source of ground water contamination due to the transport of contaminated tailings pore-water. If amendments to tailings covers could be made to facilitate a preci

    Jan 1, 2004

  • SME
    Improving Power Plant Performance And Reducing Emissions Through The Use Of Pneumatic Dry Cleaning For Low Rank Coal

    By R. J. Snoby, J. K. Alderman

    Although once fairly common as a method of coal preparation in the United States, dry cleaning has virtually disappeared. Low-rank coals used for power generation in the western U.S. are suited for dr

    Jan 1, 2001

  • SAIMM
    Improving processing by adaption to conditional geostatistical simulation of block compositions

    "Exploitation of an ore deposit can be optimized by adapting the beneficiation processes to the properties of individual ore blocks. This can involve switching in and out certain treatment steps, or s

    Jan 1, 2015

  • AUSIMM
    Improving Production Drilling and Blasting in the Kim South Orebody at Agnew Gold Mine

    By T A. Carter

    In 2010 Agnew Gold Mine (AGM) struggled to produce the required tonnages from its stopes. The longhole rises used to create void in stopes were unreliable and often failed to gain the designed rise he

    Mar 24, 2014

  • AIME
    Improving Production Efficiency in Mining- An Operations Research Approach

    By Tuncel M. Yegulalp

    This article summarizes the preliminary results of continuing research at the Henry Krumb School of Mines. Columbia University, which is directed towards improving the production efficiency of mining

    Jan 1, 1979

  • CIM
    Improving productivity and efficiency in the mining industry: tile challenge of the 80s

    By G. R. Tostengard

    "The paper identifies functional areas which frequently can yield significant productivity improvement. Emphasis is placed on the repair and maintenance, material supply and training functions. Succes

    Jan 1, 1983

  • SAIMM
    Improving productivity at an open-pit mine through enhanced short-term mine planning

    By T. J. Otto, G. C. Lindeque

    Productivity is improved by increasing the ratio of output to input. In an operating open-pit mine, improving the productivity of heavy mining equipment (HME) enables the unit cost of production to be

    Nov 1, 2021

  • ISEE
    Improving Productivity at Farco Mining of Texas Using Emulsion/ANFO Blends

    By Nick Lewis

    Farce Mining of Texas is a surface coal mine located in Laredo, Texas. Farce mines and sells approximately 600,000 tons /year of bituminous coal. A map showing the location of Laredo is provided in F

    Jan 1, 1994

  • AUSIMM
    Improving Productivity at Jim Walter Resources, Inc

    By Dixon CA

    In the early 1970s, Jim Walter Resources, Inc. (JWR) embarked on a coal mine expansion program that was unparalleled in the history of the United States. With a small nucleus of people then operating

    Jan 1, 1991

  • CIM
    Improving Productivity for Polish Hard Coal Mining

    By M. Turek

    Cost management in the conditions of increasing competition and unforeseen market turbulence constitutes one of the key areas of the enterprise?s activity. In the last two years the demand for hard co

    Aug 1, 2013

  • ISEE
    Improving Productivity in Pillar Blasting – HZL, Sindesar Khurd Mine

    By Deepankar Das, Gulshan Kumar Sadhwani, Jyoti Prakash Sahoo

    Sindesar Khurd Mine (SKM), the largest underground mine in the Hindustan Zinc Limited portfolio, is located approximately 60 kilometers (37 miles) north of Udaipur. In the 2018 financial year SKM achi

    Jan 1, 2019

  • SME
    Improving Productivity In Thin Seam Continuous Mining Systems Through Management And Technology Changes

    By S. G. Britton

    Thin seam mining presents unique challenges when management or economic conditions require significant productivity increases. These challenges are increased depending upon the presence of various ext

    Jan 1, 1991

  • SME
    Improving Productivity in Thin-Seam Continuous Mining at Tanoma

    By Scott G. Britton

    Thin-seam mining presents unique challenges when management or economic conditions require significant productivity increases. These challenges can be further amplified depending on such factors as la

    Jan 1, 1991