    How Correct are Geostatistical Models in Predicting Soil Transitions? - NAT2022

    By Hongjie Yu, Mike Mooney

    Transitions between geological/geotechnical soil units have a critical impact on the operation and performance of a tunnel boring machine (TBM). Geostatistics-based probabilistic modeling is used to q

    Dec 1, 2022

  • SME
    Design and Construction of Load Transfer System to Replace Existing 39th Street Bridge Piers with New Integral on the Track B/C Approach Structure for the East Side Access Project - RETC2021

    By Julio C. Martinez, Jeffrey L. Rice, Hayden Weschler

    This paper details the extensive underpinning required to hold up the 39th street Bridge while demolishing its massive support piers and building a 30ft deep Cut/ Cover RR tunnel beneath it. The under

    Jun 13, 2021

  • SME
    The Variable Density TBM—Current Level of Development - RETC2021

    By Werner Burger

    After its first introduction in 2013, Variable Density TBMs have increased their application significantly in mechanized closed mode tunneling. Throughout a variety of successfully completed and ongoi

    Jun 13, 2021

  • SME
    Can We Mine Yet? Criteria for Grouting Completion in Tunnel Headings - NAT2022

    By Adam Bedell, Jack Raymer, Brad Crenshaw

    Tunnel contracts often include provisions for pre-excavation probing and grouting for areas ahead of the tunnel heading. If grouting triggers are met, tunneling stops, and grouting is performed. There

    Dec 1, 2022

  • SME
    Utilizing “Big Tex” for the Dallas Mill Creek Drainage Relief Tunnel - RETC2021

    By Paul J. Smith, Eudomar A. Silva, Quang D. Tran, J. Milton Brooks

    The Dallas Mill Creek Drainage Relief Tunnel is an 8.04 km (5 mile) tunnel that will provide 100-year flood protection for impacted neighborhoods in the east Dallas area. “Big Tex” is a main beam grip

    Jun 13, 2021

  • SME
    Implementing BIM Underground on Progressive Design-Build Atlanta Plane Train West Extension Project - NAT2022

    By Jeff Fontana, Daniel Ebin, Eric Westergren, William Currier

    The PMott MacDonaldlane Train Tunnel West Extension (PTTWE) Project at HartsfieldJackson Atlanta International Airport includes the extension of the existing automated people mover system and terminal

    Dec 1, 2022

  • SME
    Real Challenges of Digging a Shaft in Free Phase Oil and Hydrocarbons - RETC2021

    By Ehsan Alavi, Sanjeer Yogendran, Savreet Singh

    The Don River & Central Waterfront Coxwell Sanitary Bypass Tunnel Project in Toronto extends approximately 10.5 km from Ashbridges Bay Treatment Plant west under Lake Shore Boulevard, north under Bayv

    Jun 13, 2021

  • SME
    Construction of Ottawa’s Combined Sewage Storage Tunnel (CSST) - RETC2021

    By Alejandro Sanz Garrote, Juergen Laubbichler, Fernando Triana Gracian, Paz Navarro Gancedo-Rodriguez, Andreas Feiersinger

    The Combined Sewage Storage Tunnel (CSST) is part of the Ottawa River Action Plan and will greatly reduce the frequency of sewage overflows into the Ottawa River during storms. The project consists of

    Jun 13, 2021

  • SME
    Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021

    By Aaron Archer, James Parkes

    This paper presents design considerations for the major underground elements of the pending BCRUA Phase 2 Raw Water Delivery System Project. These elements include two Lake Taps; an 8,800 LF, minimum

    Jun 13, 2021

  • SME
    Vintage TBM Cuts Months Off Schedule in San Antonio - NAT2022

    By Cody Edwards, Ross Webb

    5 miles of soft ground tunnel excavation for the SAWS W‑6 project finished months early despite difficult conditions. Success was achieved using TBMs and other equipment built long before most of the

    Dec 1, 2022

  • SME
    Underwater Tunnel Repair with Stainless Steel Segmental Liner - NAT2022

    By Matthew Goff, Russell Lutch

    The Great Lakes Water Authority (GLWA) operates the largest regional water authority in the State of Michigan. Two of the tunnels supplying raw water to the system from the Detroit River are the Sprin

    Dec 1, 2022

  • SME
    Parametric Study of Portal Area Condition for Mountain Tunnel Damaged by Earthquake - NAT2022

    By Hajime Kitamura, Nobuharu Isago, Yuta Yamanishi, Kosuke Kawata, Hiroshi Yagi, Akira Matsuoka

    Mountain tunnels are generally considered to be stable during earthquakes, however, it is known that the portal areas are prone to seismic damages. Characteristics in portals such as the location of t

    Dec 1, 2022

  • SME
    Lateral Deflections and Vertical Control in Tunnel Control Networks - NAT2022

    By Joern Katzer

    It is vitally important to any tunnel project to have an accurate and reliable survey control network inside the tunnel for layouts, as-built surveys, and to provide guidance to the tunnel boring mach

    Dec 1, 2022

  • SME
    Transitioning from Mixed-Face Conditions to Hard Rock During TBM Launch on the Reedy River Basin Sewer Tunnel Project— Greenville, SC - RETC2021

    By Horry Parker Jr, Jason Gillespie, Justin Kolster, Stephen O’Connell

    Construction of the 5,932-ft Reedy River Basin Sewer Tunnel in Greenville, SC was marked by a critical transition from drill-and-blast mining in mixed-face conditions to TBM excavation with limited ro

    Jun 13, 2021

  • SME
    Risk Modelling Techniques for Complex Tunnelling Projects from Deterministic to Probabilistic Methods: Have We Done Enough? - NAT2022

    By P. Sander, M. Spiegl, J. Reilly, A. Van Droogenbroeck

    Although the outdated idea of calculating risk as the deterministic product of its likelihood and impact is not entirely a thing of the past, a multitude of organizations have adopted the usage of pro

    Dec 1, 2022

  • SME
    Dustless Hard Rock Tunneling Methods - RETC2021

    By Cody Giroux, Homer Scurlock, Michel Wasag

    Silica and Crystalline Quartz exposure continues to be a serious health threat to nearly 2 million workers in the United States, including more than 100,000 working in high risk jobs such as abrasive

    Jun 13, 2021

  • SME
    A Case Study Establishing Optimization Techniques and the Procedure for Successful Numerical Simulation of Ground-Structure Interaction - NAT2022

    By Ali Keneti, Xavier Ryan, Gerardo Sanchez, Shannon Goff

    In this study, FLAC3D modeling was conducted for ground-structure stability assessment for a pilot tunnel passing under a large shaft excavated in the vicinity of existing structures at Karangahape St

    Dec 1, 2022

  • SME
    Two-Component Backfill Grouting at the Three Rivers Protection and Overflow Reduction Tunnel: Above and Below Ground Challenges and Solutions - RETC2021

    By Francesco Chiappalone, Tanner Murt, Lance Waddell, Cristina Oñate Salazar

    The 3RPORT project is a 5-mile-long, 16-foot-internal-diameter tunnel excavated in hard rock by Slurry TBM in Fort Wayne, Indiana. Two-component grouting can be separated into two core areas of operat

    Jun 13, 2021

  • SME
    Review of Measured Activity Times and Their Impacts on Machine Utilization in Operation of Selected TBMs - RETC2021

    By P. Nelson, R. O’Connell, J. Rostami

    Tunnel boring machine (TBM) system utilization is a critical factor for predicting machine performance. The process of estimating machine performance, including rate of penetration (ROP) and machine u

    Jun 13, 2021

  • SME
    Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) City of Fort Wayne Tunnel Alignment and Adit Redesign in Construction: A Schedule Driven Journey - NAT2022

    By Todd S. Webster, Matthew J. Pierce, Brad D. Krumel

    With the Working Shafts and Starter Tunnel under way, it became apparent this 4.7-mile, 19-foot diameter wet weather tunnel was going to live up to its name. The shaft’s pre-excavation grouting was co

    Dec 1, 2022