    TBM Tunnel Logistics Management on the Longest Outfall Tunnel in the Middle East - NAT2022

    By H Vigil, G. Peach

    Long tunnels with only one access shaft pose many program problems for logistics, combine these with the requirement to drive directly out under the seabed for 10.2 km, and the program issues become e

    Dec 1, 2022

  • SME
    Geotechnical Investigation and Design for the Sister Grove Outfall Tunnels - RETC2021

    By Michael Schultz, Gregory Sanders

    In 2017, the North Texas Municipal Water District (NTMWD) initiated the design of the Sister Grove Regional Water Resource Recovery Facility (SGRWRRF) to provide additional treatment capacity for futu

    Jun 13, 2021

  • SME
    Robotic Mining and Micro Tunneling Using Hypersonic Projectile Impact Technology: Field Trial Results, Technical Evaluation and Economic Valuation - RETC2021

    By Mark C. Russell, Charles T. Russell, Brooke Colburn, Parker Bailey, Desiree Bernhard, Kaito Durkee, Tristen Cutshall, Rob P. H. Urselmann

    Hypersonic tunnel boring (HTB) uses directed, high velocity projectile impacts to remove rock. HTB is highly independent of rock strength and targets hard, abrasive rock and variable rock environments

    Jun 13, 2021

  • SME
    Considerations for Conveyor Belts in Tunneling Applications - NAT2022

    By Ginger L. Hustrulid

    Conveyor belts are a critical component in tunneling projects. This paper reviews current design considerations for conveyor belts. Rubber compounding differences to meet local fire resistance regulat

    Dec 1, 2022

  • SME
    Ground Improvement Works and Construction of Six SEM Adits as Part of the Northeast Boundary Tunnel Project in Washington, D.C. - NAT2022

    By Basilio Giurgola, Federico Bonaiuti, Norbert Fuegenschuh

    The North East Boundary Tunnel (NEBT) project in Washington, D.C. requires design and construction of several SEM adits which have to be built between lateral shafts and the NEBT-TBM Tunnel. The paper

    Dec 1, 2022

  • SME
    Single Tube Versus Twin Tubes for Subway Systems - NAT2022

    By Mahmoud Sepehrmanesh, Verya Nasri

    The purpose of this paper is to outline the advantages and disadvantages of single tube and twin tubes for subway systems. Different aspects such as diameter of the tunnel (tunnel spaceproofing), conf

    Dec 1, 2022

  • SME
    A Tunneled Solution for the Cemetery Brook Drain in Manchester, New Hampshire - NAT2022

    By Frederick McNeill, John Harper, Mahmood Khwaja, Shawn Lavoie, Timothy Cloughert, David Polcari

    City of Manchester, NH, is implementing a 20-year plan to control and significantly reduce overflow of its sewer system. The long-term control plan had called for large scale box culvert installation

    Dec 1, 2022

  • SME
    Tailskin Brushes Replacement Under Difficult Ground Conditions—3RPORT Project - RETC2021

    By Francesco Chiappalone, Daniele Nebbia, Lance Waddell, Greg Colzani

    As part of the 3RPORT Project, a 5-mile tunnel is being excavated underneath the three rivers of Fort Wayne using a 19-foot diameter Slurry Tunnel Boring Machine. The groundwater pressure at the tunne

    Jun 13, 2021

  • SME
    Challenges in Rebooting Geotechnical Investigations - RETC2021

    By Mala R. Ciancia

    Planned tunnel projects with advanced geotechnical investigations are more frequently being suspended because of changes in funding, politics, or local priorities. Some of these projects are ultimatel

    Jun 13, 2021

  • SME
    Calibration Techniques for Discrete Element Method Analysis in Soft Ground TBM Applications - RETC2021

    By Glenn Mongillo

    Discrete Element Method (DEM) software has been successfully used to simulate various machine/soil interactions and provide insight for industries such as mining and bulk material processing. This pap

    Jun 13, 2021

  • SME
    Contracting Practices for Underground Freight Transportation Projects: A Look at Cargo Sous Terrain - RETC2021

    By Jürg Künzle

    The use of the underground space has been a recurring issue in human history, whereas the reasons for building subsurface structures have changed over time. In the decades to come, the world will be m

    Jun 13, 2021

  • SME
    Quantification of Tangible and Intangible Benefits of Digitalization in Tunnel Construction - RETC2021

    By Angus Maxwell, Jacob Grasmick

    As the tunneling industry continues to adopt Tunnel 4.0, digital twins of the tunnel construction site are becoming standard requirements for tunneling projects. However, the benefits of these remain

    Jun 13, 2021

  • SME
    Cutterhead Inspection and Maintenance on the Coxwell Bypass Tunnel Project in Toronto, ON - NAT2022

    By William Hodder, Ehsan Alavi, Muhib Hussain

    Disc Cutter Wear is influenced by several geological and technical factors and excessive wear can have a major impact on the excavation efficiency of Tunnel Boring Machines (TBM). Disc cutter replacem

    Dec 1, 2022

  • SME
    Amtrak East River Tunnels Structural Repairs and Reconstructions - NAT2022

    By Daniel McNamee, Wern-ping N. Chen

    The Amtrak East River Tunnels include four tunnels, Line 1 to Line 4, which extend from New York Penn Station in Manhattan, under the East River to Sunnyside Yard in Long Island City. Since fall 2015,

    Dec 1, 2022

  • SME
    Tunnel Rehabilitation Through Historic Landslides in Laguna Beach - NAT2022

    By Trenton Cohen, Joseph McDivitt, Shimi Tzobery, Joseph Sinacori, Scott Zylstra

    The 2-mile Beach Interceptor Sewer Tunnel was constructed in 1954 to then-current mining and construction standards. Due to its lifespan and deteriorating condition it is now being stabilized and reha

    Dec 1, 2022

  • SME
    Design and Construction Challenges at the Potomac River Tunnel in Washington DC - RETC 2021

    By Moussa Wone, Martino Scialpi, Colin LaVassar, Carlton Ray

    The Potomac River Tunnel (PRT) is the next major phase of the DC Clean Rivers Program. The design-build PRT project includes a 5.5-mile-long, 18-foot-internaldiameter tunnel, seven shafts, and two und

    Jun 13, 2021

  • SME
    Tunneling Under Highway 401: Construction of Large Diameter Pre-Support Pipe Canopy - RETC2021

    By Tyler Lahti, Peter Borgacci, Mary Jane Ferraro, Prakash Nadesparan

    Toronto Tunnel Partners (TTP), under contract to Metrolinx/IO, is constructing new twin rail tunnels under the Highway 401 & 409 interchange to accommodate additional tracks to support the GO Expansio

    Jun 13, 2021

  • SME
    Evaluating the Impact of DSC’s on TBM Performance in Devonian Dolomite - NAT2022

    By Greg Colzani, Emily Thompson

    The 3RPORT Project, includes a 5-mile tunnel excavated by a 19-foot diameter slurry Tunnel Boring Machine below the city of Fort Wayne, IN. The Geotechnical Baseline Report (GBR) indicated vuggy to ma

    Dec 1, 2022

  • SME
    High-Speed 3D Tunnel Inspection in Subway Tunnels— Case Study San Francisco BART - RETC2021

    By Thomas Pea, Heiner Kontrus, Jérôme Steinkühler

    In tunnel condition assessment, the trend is towards comprehensive 3D measurement combined with high quality image texture to document and quantify damages to the tunnel surface and to create a cohesi

    Jun 13, 2021

  • SME
    The Effect of TBM Diameter on Ring Installation Time - RETC2021

    By Jamal Rostami, Tala Tahernia

    TBM utilization rate is a component of machine performance prediction and critical for developing a reliable estimate of the construction completion time and cost of the tunnel. Estimation of the util

    Jun 13, 2021