Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Effects Of Water Sprays Used With A Machine-Mounted Scrubber On Face Methane ConcentrationsThis study was conducted to determine the effects of a machine-mounted scrubber and water sprays on face methane levels. Testing was conducted in the NIOSH ventilation test gallery which was designed
Jan 1, 2001
-
Tunnel Options for the Mokelumne Aqueducts Resiliency Project - NAT2022By S. Klein, M. McLeod, K. Johnson
The East Bay Municipal Utility District (EBMUD) delivers water to the San Francisco Bay Area through an aqueduct system extending from the Sierra Nevada Mountains to the East Bay. This aqueduct system
Dec 1, 2022
-
Predicting Utilization Rate of Hard Rock Slurry TBMs by Discrete Event Simulation Model - NAT2022By Anuradha Khetwal, Tala Tahernia
The estimation of TBM utilization rate can be problematic due to the uncertainty involved in the tunneling system reaction to various geology along the tunnel. Moreover, the impact of operational and
Dec 1, 2022
-
Groundwater Pressure Consideration on Partially Drained Tunnel Lining Rehabilitation Design - NAT2022By Irwan Halim, Young Jin Park
A new tunnel lining was designed for rehabilitation of the existing unlined Weehawken Tunnel in New Jersey. Structural assessment using beam spring models was performed for the lining design as a drai
Dec 1, 2022
-
Grouting Cast-In-Place Concrete Tunnel Liners— What Have We Learned? - RETC2021By Adam Bedell, Paul Derby, Brad Crenshaw
Modified contact grouting was introduced almost 15 years ago as a methodology combining traditional contact grouting and consolidation grouting to address groundwater infiltration into hard rock tunne
Jun 13, 2021
-
Tunneling Through a Buried Valley with a Hard Rock EPB Compatible TBM - RETC2021By William Hodder, Ehsan Alavi, Nader Ghasempour, Daniel Cressman
The Don River & Central Waterfront Coxwell Sanitary Bypass Tunnel (CBT) Project in Toronto will extend approximately 10.5 km from Ashbridges Bay Treatment Plant west under Lake Shore Boulevard, north
Jun 13, 2021
-
What Is Dry and Does Your Tunnel Need to Be? - NAT2022By Adam Bedell, Brad Crenshaw
Tunnel project contract documents often present groundwater infiltration requirements for components of the underground portions of the project. All too often these documents require quantifiable targ
Dec 1, 2022
-
Rock Tunnels at High Water Pressure: Non-Continuous Pressurized TBMs Versus Slurry - RETC2021By Brad Grothen, Lok Home
The choice of TBM type is never easy, but it becomes especially challenging when faced with a hard rock tunnel with expected high water flows and pressure. Slurry Shield tunneling has a long history o
Jun 13, 2021
-
360-Degree 3D Digital Assessment of Subsurface Water Infrastructure - NAT2022By Cory Dippold, Michael Mett, Jérôme Steinkühler, Kristi Latimer
For decades, tunnels of all types have been a significant part of our infrastructure. In particular, water tunnels carry millions of gallons of fresh water every day to major metropolitan areas and su
Dec 1, 2022
-
An Introduction to Low-Density Cellular Concrete and Advanced Engineered Foam Technology - NAT2022By Milton Gomez, Nico Sutmoller
Low-density cellular concrete (LDCC) was first introduced to the market in the early 1900s and since then has made continuous technological advances. There are two primary types of LDCC: permeable and
Dec 1, 2022
-
Hard Rock Pressure Tunnel Final Lining Design Guide Summary - NAT2022By Wern-ping N. Chen
Pressure tunnel includes water-supply tunnels and tunnels for hydroelectrical power plants. Their design principles are different from those of water/wastewater/conveyance and transportation tunnels.
Dec 1, 2022
-
Management of the Water Inflows During Construction of the Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) - RETC2021By Francesco Chiappalone, Miriam Piemontese, Lance Waddel, Paolo Perazzelli, Emidio Tamburri, Roberto Schuerch
The Three Rivers Protection & Overflow Reduction Tunnel is part of the Long-Term Control Plan of the City of Fort Wayne, Indiana (USA). The 4.9 m internal diameter tunnel, of length approximately 7.5
Jun 13, 2021
-
Selection and Design Factors for a Variable-Density TBM at the I-64 Hampton Roads Bridge-Tunnel Expansion Project (HRBT) - RETC2022By Alejandro Sanz, Juan Luis Magro, David Mazeyrie
The Hampton Roads Bridge-Tunnel Expansion Project (HRBT), initiated by the Virginia Department of Transportation (VDOT), will add two new 1.5-mile TBM bored tunnels to the two existing immersed-tube t
Jun 13, 2021
-
North Auckland Line—Tunnel Refurbishment - RETC2021By Shu Fan Chau, Innes Duncan, Harry Asche, Bill Newns
The North Auckland Line (NAL) in Northland, New Zealand, is being upgraded to pass Hi-Cube containers. The line includes many tunnels and bridges which need to be refurbished to improve structural cle
Jun 13, 2021
-
Emerging Data Processing Technologies for TBM Projects— State of the Art and Outlook - RETC2021By Ulrich Maidl, Jamal Rostami, Ulf Gwildis
Tunnel Boring Machines (TBM) have more or less become the preferred method of tunneling in various ground conditions and Programmable Logic Controllers (PLC) or microprocessors are standard features o
Jun 13, 2021
-
Lateral Rock Load Estimation for Cut and Cover Structures - NAT2022By Charles Stone, Eric Wang
A method for estimating geotechnical rock loads for shallow cut and cover subway stations is presented. Localized geotechnical conditions lead to extreme variations in rock loading on the walls of sub
Dec 1, 2022
-
Design and Construction Challenges for the Ellicott City North Tunnel - NAT2022By Christopher Nelsen, Daniel Dobbels, R. Zachary Hollenbeck
Recent major floods have inundated Historic Ellicott City, Maryland, resulting in loss of life and property damage. Howard County, Maryland, has developed the Ellicott City Safe and Sound Plan to miti
Dec 1, 2022
-
Application of Large Diameter Single-Bore Tunnel for Subway Systems - NAT2022By Silas Li, Michael Harris-Gifford, Jason Choi, William H. Hansmire
Twin-bore tunnels with a single track in each tunnel are currently the most common subway tunnel configuration. However, a large diameter single-bore tunnel with two tracks separated by a center wall
Dec 1, 2022
-
Conventional Excavation of New Inlet/Outlet Tunnel for Newell Creek Dam, CA - NAT2022By Kexin Cai, Isidro Rivera, Shawna Von Stockhausen, Maria Chastka, Kevin Huynh
The Newell Creek Dam Inlet/Outlet Replacement Project is located approximately 11 miles north of Santa Cruz, California along Highway 9 in the San Lorenzo Valley. This project will replace the existin
Dec 1, 2022
-
Construction of the Plymouth Tunnel by SEM Based on a Permanent Shotcrete Liner for The Purple Line Project in Maryland: A Case Study - RETC2021By Nicholas Tabor, Norbert Fuegenschuh, Richard Taylor, Jean-Marc Wehrli
The Plymouth Tunnel forms part of the 16-mile long route of the Purple Line Light Rail Project promoted by the Maryland Transit Administration. The tunnel is approximately 1,220 feet in length with a
Jun 13, 2021