Talking Trash? – The RCRA Cleanup ReformsBy M. N. Semenoff
On July 8, 1999, EPA announced the RCRA Cleanup Reforms, a set of administrative reforms designed to achieve faster, more efficient cleanups. This paper will discuss the Reforms, the status of their
Jan 1, 2001
-
Tamerlane Hoist And Vertical Belt ProjectBy Shawn Collins
BACKGROUND The history of the Pine Point Mine is a rich one. This property once boasted one of the largest and most profitable lead-zinc mines in Canada's long and storied mining history. The Pi
-
Tantalum And Niobium From Wyoming PegmatitesBy M. L. Wouden
The Bureau of Mines investigated pegmatite and granite formations at Copper Mountain, Fremont County, Wyoming, for recovery of tantalum and niobium. Sampling of surface exposures identified about 1.27
Jan 1, 1991
-
Tantalum: A Case Study on Sustainable Resource ManagementBy R. Bleischwitz, R. Delzeit
"Tantalum, a heavy metal with characteristics such as superconductivity and high terminal resistance, nowadays is the most efficient material for production of capacitors, which are essential for prod
Jan 1, 2005
-
Tappan Zee Crossing of the Hudson River, New YorkBy Ian Hooper, Alan Winter, Stefan Sadokierski, Craig Covil
The existing Tappan Zee Bridge was built in the late 1950s and has been working over its design traffic load for some time now. A new project, which is being jointly sponsored by the New York State Th
Jan 1, 2005
-
Tar Sand Pretreatment With DiluentBy J. D. Miller, J. Hupka
Important aspects of kerosene penetration into tar sand have been investigated. The natural tar sand porosity was measured and used to analyze the performance of the hot water process. Subsequently, p
Jan 1, 1994
-
Tar Sand Pretreatment With Diluent (0780ee33-2c90-4610-90f2-8d401f46a622)By J. Hupka
Some aspects of kerosene penetration into tar sand have been investigated. The natural tar sand porosity was measured and used to analyze the performance of the hot water process. Subsequently, pretre
Jan 1, 1992
-
Targeting And Prioritizing Safety Interventions In West VirginiaBy R. L. Grayson
Using powerful database management software, nested-field analysis and microanalysis of narratives have been made of West Virginia accident data, resulting in a new approach for targeting and prioriti
Jan 1, 1997
-
Targeting and Prioritizing Safety Interventions in West Virginia – Preprint 97-51By J. M. Dean, R. L. Grayson, R. C. Althouse, M. J. Klishis, G. L. Winn
Using powerful database management software, nested-field analysis and microanalysis of narratives have been made of West Virginia accident data, resulting in a new approach for targeting and prioriti
Feb 24, 1997
-
Targeting Precious Metals Deposits Using A Predictor-Correlator TechniqueBy E. P. Gustafson
Demand by precious metals explorationists for cost effective means to target subsurface geologic structures worthy of evaluation by means of drilling has led to the use of the predictor-correlator tec
Jan 1, 1989
-
TARP - Comparative Study of the Mining and Concrete Lining Operations for Tunnels with Diameters over 9 m (30 ft)By Joseph Fernandez, Luminita Calin
INTRODUCTION The Tunnel and Reservoir Plan (TARP), commonly known as the Deep Tunnel Project, is the daring and unique concept developed by the Metropolitan Water Reclamation District of Greater C
Jan 1, 1997
-
Tarp North Branch Tunnel Leg – A Case HistoryBy Joseph P. Sobanski, Michael P. Bruen
The North Branch tunnel segment of the Tunnel and Reservoir Plan Mainstream System consists of 14,075 m (45,885 ft) of 9.2 m (30.2 ft) finished diameter and985 m (3,232 ft) of 2.5 m (8.25 ft) finished
Jan 1, 1999
-
TARP Tunnel Boring Machine Performance ChicagoBy William A. Macaitis, Frank E. Dalton, Leo R. DiVita
The Metropolitan Water Reclamation District of Greater Chicago's Tunnel and Reservoir Plan (TARP) is a multi-purpose urban public works project with a total cost of $3.7 billion. Currently 51 mil
Jan 1, 1993
-
TARP — The Des Plaines Tunnel System (North Leg) A Case HistoryBy Robert Rautenberg, Paul McDermott
This paper will discuss the construction of 15.9 km (9.88 mi) of tunnels on a project in Chicago, Illinois. The tunnels were driven utilizing two rock and four soft ground TBMs ranging in sizes from 7
Jan 1, 1997
-
TARP—Torrence Avenue TunnelBy Bob Rautenberg, Luminita Calin
The Tunnel and Reservoir Plan (TARP), commonly known as the Deep Tunnel Project, was developed by the Metropolitan Water Reclamation District of Greater Chicago as a two-phase solution to the problem
Jan 1, 2001
-
Tata Chemicals North America finds stability, success in Southwest WyomingBy William Gleason
"In a time that seems to be dominated with nothing but bad news coming from the mining industry, there is a success story that has been quietly happening in Southwestern Wyoming for more than 60 years
Jul 1, 2016
-
Tax incentives are key to survival of Canadian mineral explorationBy Kenneth A. Grace
Introduction The 1980s have not been kind to the mining industry, especially in the United States. As mineral commodities prices plunged, marginal producers were squeezed out and then major players w
Jan 1, 1989
-
TBM and Logistics for Constructing Twin Tunnels Between Artificial Islands in Hampton Roads - RETC2021By Sergio Estebanez, Martha Gross, Ruben Rubal, Yvonnick Rescamps, Alexandre Cochennec
The Hampton Roads Bridge-Tunnel (HRBT) Expansion project in coastal Virginia, USA will add two 1.5-mile (2.4 km) TBM bored tunnels alongside two existing immersed-tube tunnels between artificial islan
Jun 13, 2021
-
TBM And NATM Combined Solution For A Very Deep Tunnel?The ?Pajares? CaseBy Enrique Fernández
INTRODUCTION The high speed rail link between Madrid and Asturias, in the North of Spain, has encountered in the Cantabrian range the biggest challenge of the whole line, a very deep tunnel, 25 km l
-
TBM Breakthrough in Pressurized Conditions—Ship Canal Water Quality Project (SCWQP) - NAT2024By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Fabrizio Fara
As part of the Ship Canal Water Quality Project, 2.7-mile Combined Sewer Overflow tunnel is excavated with a 21.5-foot diameter EPB Tunnel Boring Machine. Due to the difficult geological and hydrogeol
Jun 23, 2024