Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • DFI
    Challenges And Recommendations For Quality Assurance Of Deep Foundations

    By Frank Rausche

    Although Quality Control (QC) during construction is preferable for deep foundations, there are many instances when it is necessary to resort to Quality Assurance (QA) methods if, for various reasons,

    Jan 1, 2008

  • DFI
    Probabilistic Development Of Load And Resistance Factor Design For Driven Pipe Piles In Sands: Lessons Learned

    By K. C. Foye

    Use of load and resistance factor design (LRFD) of foundations is growing, from offshore applications to bridge applications and beyond. The development of load and resistance factors for design has

    Jan 1, 2008

  • DFI
    The Practical Application Of Pile Reuse At Bow Bells House, City Of London

    By Justin Phillips

    The redevelopment of Bow Bells House in London has thrown up a number of challenges that will increasingly be faced by developers of congested sites. In the context of pile reuse this paper examin

    Jan 1, 2008

  • DFI
    Vancouver Island Conference Centre Cutter Soil Mixer Technology Transforms Site

    By Brian Wilson, John Scholte, Megan Atkinson

    "In November 2004, the residents of the City of Nanaimo, B.C., Canada voted to approve a new conference centre as the centrepiece of a proposed revitalization project for the city’s historic downtown

    Jan 1, 2008

  • DFI
    The Resonant Driver: Ultra High Frequency Pile And Casing Installation

    By Matthew Janes

    The installation of piles and casings is becoming increasingly difficult as restrictions on vibration become common in major urban areas. The use of high frequency, resonant excitation of a pile or c

    Jan 1, 2008

  • DFI
    New Wembley National Soccer Stadium, London Piled Foundations: Design, Construction and Logistics

    By Max Gwynn, Tony Suckling

    "The new Wembley Stadium is the most spectacular soccer stadium in the world, built to the highest specifications, using the latest technology and offering visitors an unrivalled match-day experience.

    Jan 1, 2008

  • DFI
    Estimating Axial Displacements Of Driven Piles In California Soils

    By Cem Akgüner

    The displacements of axially loaded single piles are analyzed with an approach based on elasticity. Young?s modulus and Poisson?s ratio of the soil encompassing a pile are the unknowns required as in

    Jan 1, 2008

  • DFI
    Limiting Damage To Historic Structures In New York City, 1981 To Present

    By Andrew J. Ciancia

    The construction of the Pennsylvania Station in Manhattan, the Beaux-Arts masterpiece, was completed in 1910. In financial ruin, the Pennsylvania Railroad Company sold the station in the 1960?s and t

    Jan 1, 2008

  • DFI
    Introducing VCE's: Support Of Excavation Without Tie-Backs

    By Rick Deschamps

    A reoccurring problem with support of excavations in urban areas involves the placement of external support components like anchors or nails in right-a-ways, subway and utility setbacks, in areas occu

    Jan 1, 2008

  • DFI
    Unusual Geology At Brooklyn's Edge And Its Influence On Design And Installation Of Piles

    By Hiren J. Shah

    Across much of New York City, the geology of glacially deposited soils follows a common sequence. Outwash sands generally overlie varved silts and clays, which lie above a basal till deposit underlai

    Jan 1, 2008

  • DFI
    Construction Of Large Drilled Shafts (The 2nd Annual Mike O'Neill Lecture)

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    Jan 1, 2008

  • DFI
    Design of the Lift-in Dam at Olmsted on the Ohio River

    By Dale E. Berner

    A new navigation dam at Olmsted on the Ohio River will be built "in-the-wet" using a lift-in construction method by the Washington Group/Alberici Joint Venture for the U.S. Army Corps of Engineers, Lo

    May 11, 2007

  • DFI
    Geophysical Methods for Site Characterization for Marine Foundations (2dc87bb8-7bfd-4523-92cd-c3dfe612556c)

    By Richard E. Sylwester

    Evaluating surface and subsurface conditions for marine foundations (bridges, causeways, terminals, etc.) is often done with a limited amount of data. Subsurface information for these projects is prim

    May 11, 2007

  • DFI
    Quality Control of Production Pile Installations for US-90 Replacement Bridge Over St. Louis Bay

    By Kevin Kuhl

    With the destruction of the US-90 Bridge spanning St. Louis Bay by Hurricane Katrina, the State of Mississippi awarded its first major design-build contract in order to have a completed four-lane brid

    May 11, 2007

  • DFI
    Caisson Foundations For Mississippi River Bridges In The New Orleans Area (2e66a216-6dc8-4479-804e-25f5836f407e)

    By William B. Conway

    This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du

    May 11, 2007

  • DFI
    Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin

    By Edward Jacobsen

    The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in

    May 11, 2007

  • DFI
    Drilled Shaft Foundations for the Float-in Dam on the Monongahela River at Braddock, PA (6c19e969-5f09-43f8-9e6e-1837d4537e5e)

    By Robert B. Bittner

    The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative "In-the-Wef' technology. A key feature of this technology in

    May 11, 2007

  • DFI
    Construction Of The Main Tower Pier Caissons For The Greenville Bridge In Mississippi

    By F. Keith Jacobson

    To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus

    May 11, 2007

  • DFI
    Construction of Large Drilled Shafts the 2nd Annual Mike O'neill Lecture

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    May 11, 2007

  • DFI
    The Cosmopolitan Resort & Casino, Las Vegas, NV Specialty Foundation Work Under Extreme Conditions

    By Lawrence Piccagli

    This past spring of 2006, BENCOR installed the concrete reinforced diaphragm walls for the COSMOPOLITAN RESORT & CASINO in Las Vegas, Nevada. The project highlights include the excavation of approx. 3

    Jan 1, 2007