Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • DFI
    Skirt Suction Foundation - Application To Strait Crossings -

    By Takashi Saito

    Since early 1970?s skirt suction foundations (skirted foundation / bucket foundation) have been used as support for large fixed substructures or anchors for floating structures in offshore hydrocarbon

    Jan 1, 2013

  • DFI
    Underwater Concrete - Mix Design And Construction Practices

    By Sam X. Yao

    The underwater concrete technology has historically evolved largely through a trial-and-error process of constructing marine works. Many outstanding examples exist of high quality concrete placed unde

    Jan 1, 2013

  • DFI
    Design Of The Drilled Shaft Foundations For The Cooper River Bridge

    By Liang Shen

    The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South

    Jan 1, 2013

  • DFI
    Current State Of Practice Of Corrision Protective Systems For Tierods And Tiebacks Used In Marine Applications ? Introduction

    By Thomas A. Printz

    The wide use of carbon steel in construction and engineering projects makes this engineering material accountable for approximately 85% of the total annual steel production worldwide. Despite the lac

    Jan 1, 2013

  • DFI
    Owing to an Increasing Demand to Manage Risk and Maximize Cost-Effectiveness, Preference for Reliability-Based Design (RBD) Over Traditional Deterministic Design Procedures has increased for Deep Foundation Elements

    By Armin W. Stuedlein, Seth C. Reddy

    In this study, factors affecting the reliability of augered cast-in-place (ACIP) piles under axial compression at the serviceability limit state are addressed using a simple probabilistic hyperbolic m

    Jan 1, 2013

  • DFI
    Berth Deepening A Three Decade Old Wharf Structure For The Next Generation Of Container Ships

    By Bill Paparis

    The thirty year old wharf structures at the Port Authority of New York & New Jersey?s Port Elizabeth Marine Terminal are being modernized for the next generation of Post-Panamax container ships, which

    Jan 1, 2013

  • DFI
    Large Diameter Shafts - Youghiogheny Reservoir Bridge (bd308ba5-80e5-464e-8005-1856048b892f)

    By Paul J. Lewis

    Estimation of the axial side shear resistance of drilled shaft rock sockets is directly related to the unconfined compressive strength of the bedrock. Commonly, the mean unconfined compressive strengt

    Jan 1, 2013

  • DFI
    Deep Compaction Using Vibratory Pile Hammers

    By Dennis Nottingham

    The need for deep compaction of submerged granular soils has led to improvements in this area. In 1971, L.B. Foster Company personnel patented a method of deep compaction using a vibratory pile hammer

    Jan 1, 2013

  • DFI
    Statnamic Load Testing Of High Capacity Marine Foundations (62a0500e-14c7-4ace-9608-4578694a5392)

    By Mike Muchard

    STATNAMIC load testing augmented with embedded instrumentation has been successfully used to obtain structural and geotechnical design information on large diameter spun cast concrete cylinder piles o

    Jan 1, 2013

  • DFI
    New Orleans Levee Improvement Project: An OPA Contender

    By Filippo Leoni, Wesley Schmutzler

    "The LPV-111 East Back Levee Improvement Project lies along the Gulf Intracoastal Waterway (GIWW) in Orleans Parish of New Orleans, La., and is an essential component of the New Orleans Hurricane Prot

    Jan 1, 2013

  • DFI
    Geophysical Methods For Site Characterization For Marine Foundations

    By Richard E. Sylwester

    Evaluating surface and subsurface conditions for marine foundations (bridges, causeways, terminals, etc.) is often done with a limited amount of data. Subsurface information for these projects is pri

    Jan 1, 2013

  • DFI
    Underwater Sound Attenuation In Construction Projects: Applying Science To Pile Driving Permits

    By Alan Christopherson

    Nearshore construction projects often require installation of steel piles and specific methodologies of installing piles may adversely affect nearby species of concern. Water is an uncompressible med

    Jan 1, 2013

  • DFI
    Caisson Foundations For Mississippi River Bridges In The New Orleans Area

    By William B. Conway

    This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du

    Jan 1, 2013

  • DFI
    Design Of The Marine Foundations For The Skyway Project Of The San Francisco Oakland Bay Bridge

    By Gerry Houlahan

    The east span of the 3.5 km long SF-Oakland Bay Bridge is supported by different types of foundations along its span. Starting from the west, its first 460 m section comprising twin concrete box-girde

    Jan 1, 2013

  • DFI
    New Tacoma Narrows Bridge Caissons

    By R. Bruce Patterson

    The New Tacoma Narrows Bridge is a classic suspension bridge founded on concrete caissons. Caisson construction was complicated by the proximity of the existing bridge piers, only sixty feet away. H

    Jan 1, 2013

  • DFI
    The Underwater Cut-Off At The Walter F. George Dam

    By Gianfranco Di Cicco

    Seepage problems were recorded for more then 40 years at the Walter F. George lock and dam. In 2001 the Mobile district of The U.S. Army Corps of Engineers turned to the installation of a 200 feet dee

    Jan 1, 2013

  • DFI
    Design And Construction Of The Rion Antirion Bridge Foundations

    By Alain Pecker

    The choice of a design concept for a bridge foundation is guided by various factors; several of these factors are indeed of technical origin, like the environmental conditions in a broad sense, but ot

    Jan 1, 2013

  • DFI
    Offshore Wind Turbine Foundations - In Denmark And Belgium - Introduction

    By Jørn H. Thomsen

    This paper presents the experience gained and the lessons learned over the last decade within the numerous offshore foundation projects undertaken in the offshore waters of Denmark and Belgium by COWI

    Jan 1, 2013

  • DFI
    Marine Foundation Retrofit For The Richmond - San Rafael Bridge

    By Patrick E. Durnal

    A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM Harris) designed the $779 mill seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the San Fr

    Jan 1, 2013

  • DFI
    2013 OPA Winner: Wolf Creek Dam Rehabilitation

    By Fabio Santillan, Michael F. Zoccola

    "Wolf Creek Dam and Lake Cum berland in Russell County Kentucky is operated by the United States Army Corps of Engineers (USAGE) Nashville District It is a combination 3,940 ft long (1,200 m) non-zone

    Jan 1, 2013