Base Grouted Piles In Thanet Sands, LondonBy D. E. Sherwood
Twelve toe grouted, and eleven ungrouted piles, founded in very dense sands have been analysed to establish how toe grouting enhances pile performance. It is shown that pile stiffness is greatly incre
Jan 1, 1989
-
The Effects Of Changes In Effective Stress On A Base Grouted Pile In SandBy V. M. Troughton
Large diameter bored piles with grouted bases have been adopted for the foundations of the majority of the buildings at Canary Wharf in London's Docklands, including a deep basement car park. The
Jan 1, 1989
-
The Effect Of Vertical Pile Loading On Subsequent Lateral BehaviourBy A. Lyndon
Vertical and lateral load tests were carried out on two 13 m deep bored cast-in-place instrumented piles, socketed into weathered sandstone. The first pile, 1200 mm in diameter, was loaded vertically
Jan 1, 1989
-
On The Effects Of Sand Grading On Driven Pile PerformancePrecast prestressed concrete piles designed to be end-bearing in a sand stratum at Drax Power Station met with extremely variable resistance during driving. Some piles came to virtual refusal almost i
Jan 1, 1989
-
The Use Of A Reverse Circulation Diaphragm Walling Technique To Form A Plastic Cut-Off Wall Around Sizewell B Power StationBy H. F. Cowie
Britain's first pressurised water reactor (PWR) Nuclear Power Station is now under construction at Sizewell on the Suffolk coast. A linear cut-off wall was proposed to ensure that the drawdown of
Jan 1, 1989
-
Producing Sealing Walls And Sealing Slabs By Applying The Soilcrete ProcessBy E. W. Raabe
The paper discusses the increasing role of specialist grouting techniques to form water seals or cut-offs for deep basement construction. Raabe and Toth discuss the various grouting methods available
Jan 1, 1989
-
Construction Productivity Advancement Research Program (CPAR)By Jesse A. Pfeiffer
CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati
Jan 1, 1989
-
Thornton Road, Listerhills, BradfordBy B. C. Slocombe
A large derelict inner city site was regenerated for use as a distribution warehouse. Difficult topography and soils conditions required the adoption of a combination of specialist geotechnical proces
Jan 1, 1989
-
Recent Developments In Continuous Flight Auger PilingBy P. H. Derbyshire
The use of continuous flight auger piles has increased significantly in the U.K. to such an extent that it is now the most widely used method of constructing small diameter bored piles. This paper des
Jan 1, 1989
-
Rehabilitation Of Existing Foundation Piles Of Marine Structures In New York City Harbor, USABy P. B. Kelleher
Most of the piers and other pile-supported marine structures in the New York City Harbor area were constructed prior to the widespread use of currently available pile protective systems. As a result,
Jan 1, 1989
-
Methods Of Constructing Concrete Piles On Heavily Contaminated SitesBy N. C. Matheson
The West's Shell Pile has been used on sites with very soft ground conditions for over 60 years. Fibre reinforced precast concrete shells 900mm long are threadled onto an internal mandrel which c
Jan 1, 1989
-
Dynamic Stability Of An Axially Loaded PileBy S. S. Gajin
The paper deals with parametric vibrations of an axially loaded pile. The dynamic model is derived by means of Hamilton's principle and reduced to a partial differential equation with variable c
Jan 1, 1989
-
Economical Piling In Soft Soils And Expansive ClaysBy D. Mohan
Soft to medium dense silty and clayey soils are found in many parts of India and conventional friction piles have normally been used for foundations of high rise buildings and other structures on such
Jan 1, 1989
-
Rock Socket Piles In The Sherwood Sandstone Of Central BirminghamBy L. J. Whitworth
Five trial piles were constructed during the trial pile programme for the Birmingham International Convention Centre. In addition, trial piles have been tested on two other sites in central Birmingham
Jan 1, 1989
-
Performance Of A Large Diameter Drilled PierBy A. J. Partos
One Liberty Place, at 315 m is the tallest building in Philadelphia, PA USA. It is supported on drilled piers socketed in heterogeneous rock. 3832 kN/m2 end bearing and 383 to 766 kN/m2 shaft resistan
Jan 1, 1989
-
Combined Loading Tests On Large Diameter PilesBy A. Lyndon
Combined loading tests are described to three 1.2m diameter cast-in-place bored piles, 12m long, formed through cohesionless material into stiff sandy clay. The maximum loading conditions imposed at t
Jan 1, 1989
-
Update Of Aashto Standard Specifications For Highway Bridges: Division II--Construction - Preliminary Draft Final Report Vol. II - Specifications And Commentary - Driven Foundation Piles - 4.1 DescriptionThis work shall consist of furnishing and driving foundation piles of the type and dimensions designated on the plans or in the special provisions including cutting off or building up foundation piles
Jan 1, 1989
-
The Dutch Cone Penetration Test And Its Use In Determining The Pile Bearing CapacityBy C. Van der Veen
The use of the quasi static (Dutch) Cone Penetration Test (CPT) is described as a tool to predetermine the ultimate bearing capacity of the pile point. An analysis is given why a purely theoritical ap
Jan 1, 1989
-
Hand-Dug Underreamed Piles At Embankment Place, LondonBy W. J. Grose
The Embankment Place office development over the platforms of Charing Cross Railway Station in London has presented many interesting and unusual problems to the engineers involved with the project. Th
Jan 1, 1989
-
Load Testing Of Steel Sheet Piling Driven With A Vibratory HammerBy Drew Floyd
Five full-scale pile load tests were performed on pairs of PZ-22 sheet piles installed with a vibratory pile driving hammer. The sheet piling was installed in several locations in soil generally consi