The Effects Of A Direct Electrical Current On The a Value Of Metallic Piles In Clay - SynopsisBy Stephen T. Bloomer
The application of a direct current electrical potential between a metallic pile and a fine grained soil results in an almost instantaneous change in the magnitude of the forces acting on the pile.
Jan 1, 1996
-
Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - SynopsisBy S. R. Nandargikar
Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.
Jan 1, 1996
-
Negative Drag Reduction On Spliced Piles - An Insitu Study - SynopsisBy Gopal Ranjan
An insitu prtotype study on precast driven spliced piles in soft marine clay deposit has been carried out to study negative drag. The drag is generated by loading the ambient clay. For reduction in ne
Jan 1, 1996
-
Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - SynopsisBy A. B. Desai
The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across
Jan 1, 1996
-
Optimisation Of Pile Type To Support Major Structures Above A Deep Sand Profile - SynopsisBy P. Davies
The Hillside Smelter presently under construction at Richards Bay, Republic of South Africa, will be, on completion, the fifth largest aluminium smelter in the world. The site selected for this plant
Jan 1, 1996
-
Experimental And Theoritical Studies On Pile Capacity - SynopsisBy K. Rambha Devi
The paper is an attempt to co-relate the findings of pile capacity using a number of formula suggested by various authors with the actual field load test results. Five locations consisting of wholly s
Jan 1, 1996
-
Dynamic Monitoring Program Results Indicator Pile Tests -I-880 - IntroductionBy D. Michael Holloway
The realignment of Interstate 880 replaces the double-decked (Cypress) viaduct collapsed in Oakland, California during the 1989 Loma Prieta Earthquake. The California Department of Transportation (CAL
Jan 1, 1996
-
Drilling And Dewatering In An Urban Environmentprivate - Project Description And LocationBy Joel Moskowitz
In 1990, the United States General Services Administration (GSA) issued a contract for design and construction of a new federal court building in New York City. Mueser Rutledge Consulting Engineers (M
Jan 1, 1996
-
Anamolies Ammednments And Revision Of Is Code On Underreamed Piles - SynopsisBy A. V. Shroff
The Indian Standards code of practice for design and construction of underreamed piles contains provision for installing such piles in expasive soils. In recent years, a large amount of research work
Jan 1, 1996
-
Relevance Of Ryznar Index In Under Water Concrete - SynopsisBy V. T. Ganpule
The effect of Sulphate and Chloride is well understood by the engineers. Most of the codes stipulate permissible limits for sulphate and chloride content in groundwater. Relatively few reference are a
Jan 1, 1996
-
A Critical Appraisal Of Is-Code Provisions For Pile Design ? SynopsisBy N. Som
The pile capacity in cohesive and granular soils depends on a number of parameters. The values of these parameters as recommended by Indian Standard Code of Practice vary over wide ranges. A designer
Jan 1, 1996
-
Some Problems Encountered During Pile Installation - SynopsisBy [D. N. ] Naresh
During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som
Jan 1, 1996
-
Tentative Guidelines For Design Of Stone Columns- G. H. Approach - SynopsisBy A. R. Katti
The stone columns are widely used in the improving the bearing capacity of weak soils mostly for supporting flexible foundation systems. The load carrying capacity of a stone column is complex in natu
Jan 1, 1996
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - CollapseBy Darrell L. Beddard
The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western
Jan 1, 1996
-
Design Of Well Cap, Pier And Well Steiming At The Junction Using Strut-And-Tie Model - SynopsisPier, well cap and steining junction is a complicated 3-d re-ion. The prevalent design procedure for the pier, well cap and steining in isolated manner is not rational. In absence of an integrated app
Jan 1, 1996
-
Current Pile Foundation Practice In Taiwan ? SynopsisBy Za-Chieh Moh
This paper presents a summary of the current pile foundation practice in Taiwan. Constructions of driven piles, drilled shafts, and barrette foundations are reviewed. This paper also briefly summarize
Jan 1, 1996
-
Soil Damping In Saturated Sandy Soils For Determining Capacity Of Piles By Wave Equation AnalysisBy Mark R. Svinkin
This paper deals with application of the wave equation analysis to determine capacities of piles driven in saturated sandy soils. It shows that pile capacity in sandy soils changes with time after the
Jan 1, 1995
-
Dynamic Testing Results Indicator Pile Test Program --I-880 - IntroductionBy D. Michael Holloway
The California Department of Transportation (CALTRANS) evaluated several pile foundation schemes for supporting the structures along the realignment of Interstate 880. The project replaces the double-
Jan 1, 1995
-
Sheetpile Installation Vibration StudyBy Kenneth A. Pidgeon
This paper presents a case history on mitigating vibration problems associated with the installation of steel sheetpiles. The project in-cludes installation of steel sheetpiles for a utility trench wi
Jan 1, 1995
-
High-Strain Dynamic Testing Of Drilled Shafts And Cast-In-Place PilesBy Garland E. Likins
High-strain dynamic testing of drilled shafts and cast-in-place piles has become routine procedure in many parts of the world today. Field testing is performed by measuring strain and acceleration rec
Jan 1, 1995