Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - SynopsisBy Robert Jakiel
The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange
Jan 1, 2000
-
Vibwall Installation - Cardiff Bay Barrage ? SynopsisBy Graeme McWhirter
This paper discusses the Installation of a Vibwall for the Cardiff Bay Barrage Project Wales, UK, by Kvaerner Cementation Foundations. Only the second use of the technique in the UK the wall was succe
Jan 1, 2000
-
Tension Tests On Driven Pipe Piles In Sand - SynopsisBy Alan J. Lutenegger
A series of tension tests were performed on prototype scale steel pipe piles at two sites to evaluate the influence of scale and pile plugging on the unit skin friction developed in axial tension. The
Jan 1, 2000
-
Deep Soil Stabilization Using Lime Cement Columns - Synopsis:By Melvin I. Esrig
Lime Cement column stabilization of soft clay and sand in Salt Lake City, Utah and in San Francisco California is described and discussed. Stabilization permitted the construction, in a single stage,
Jan 1, 2000
-
Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - SynopsisBy N. S. Yet
This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C
Jan 1, 2000
-
Session IV - Notable International Projects - Special Foundation Technique For The Intersection Of Two Canals Near Magdeburg, Germany - Summary:By Wolfgang G. Brunner
The closing of the gap in the European waterway- net is one of the big and challenging traffic projects following the German reunification. The water canals in the North German plain connect the Rhine
Jan 1, 2000
-
Innovation In South East Asia - SynopsisBy Brian Littlechild
Whilst there is much innovative work being undertaken in South East Asia in the space allowed in this paper we have settled on describing in more detail the work that has been done with shaft grouting
Jan 1, 2000
-
Foundations For Light Buildings On Lime/Cement (L/C) Columns ? SummaryBy Per Eriksson
For light buildings on clay, foundations on L/C-columns is in many cases a competitive alternative to piles when the thickness of the clay is moderate (<20 m). The method is applicable for the above m
Jan 1, 2000
-
Axial Load Capacity Of Steel Pipe Piles In Sand: A Review Of The API Method - SynopsisBy Sanjeev Malhotra
The American Petroleum Institute (API) method of predicting pile capacities in sands is reviewed. Factors that influence pile capacity such as soil parameters, pile parameters, loading effects and ins
Jan 1, 2000
-
Full-Scale Field-Test Studies On Driveability And Induced Ground Vibrations Of Vibratory Driven Sheet PilesBy K. Viking
The vibratory characteristics of full-scale sheet piles, vibratory driven into the ground, have so far not been described systematically in detail. This paper concerns the preliminary results of a ser
Jan 1, 2000
-
Session III - Foundation Techniques In The Urban Environment - Structural Movement And Ground Settlement Control For A Deep Excavation Within An Historic Building - SynopsisBy Martin J. Kenwright
Within the famous Harrods department store, a new lift shaft has been constructed, servicing a depth of 22m below ground level as well as the existing 6 storeys of the store. The shaft will connect wi
Jan 1, 2000
-
Session II - Industry Trends And Up And Coming Innovations - Reflections On Our Industry - Foundation Vs GeotechnicalBy Arturo Ressi di Cervia
From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in
Jan 1, 2000
-
-
Cast Insitu Piling For The King's Wharf Project, Sydney, AustraliaBy Slav Tchepak
The King's Wharf development is located in Sydney's Darling Harbour area. The site was originally used for industrial maritime purposes, which over the years has been reduced to accommodatin
Jan 1, 2000
-
Case History: Estimating Ground Vibrations Caused By Pile DrivingBy Tracy Brettmann
A new method for estimating ground vibrations caused by pile driving was developed as a result of a vibration monitoring program performed for a large pile driving project. The method is accurate, rat
Jan 1, 1999
-
The Historical Evolution Of Piling And Deep Foundations And Prospects For The Future.By W. G. K. Fleming
The general history of piling is traced up to the present time with regard to the evolution of methods and materials. The processes have been strongly influenced by developments in basic equipment and
Jan 1, 1999
-
Large Diameter CIDH Construction In Cohesionless Soils By The Use Of Rotator/Ocsillator Techniques: A Case Study - 116th Avenue Bridge Over The Gila River Phoenix, Az.By M. Cornelius
Drilled shaft construction through caving soils has historically been an uncertain, risky and costly operation. Uncertain, because the zone of caving may or may not be known, risky because the loss of
Jan 1, 1999
-
Bearing Capacity Of Footings And Piles - A Delusion? - DFI Annual Meting, October 14-16,1999, Dearborn, Michigan - SummaryBy Bengt H. Fellenius
The bearing capacity equation?"the triple N formula"? is now about 50 years old. It was developed from theory of plastic resistance of metal to a cone being pressed into the surface of the metal, supe
Jan 1, 1999
-
Davison Freeway Reconstruction Utilizes Design/Build Retaining WallsBy Thomas C. Anderson
Thirty-four retaining walls are part of the $46 million upgrade of a 1942 depressed highway in Highland Park, Michigan near Detroit. This project will close a missing link between two newer roadways,
Jan 1, 1999
-
Caisson Design And Construction Challenges On The New Tiger Stadium Project - SummaryBy Fritz J. Klingler
From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc
Jan 1, 1999