Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Drilling And Grouted Pipe Pile Foundation For Department Of Energy Spallation Neutron Source Target Building, Oak Ridge, Tennessee ? IntroductionBy Ronald E. Walkington
The U.S. Department of Energy (DOE) is building the world's newest accelerator-based, pulsed-neutron system, called Spallation Neutron Source (SNS). The facility, located in Oak Ridge, Tennessee,
Jan 1, 2001
-
Presentation #7 - Bi-Directional Static Load Testing - Load Testing High Capacity Piles What Have We Learned?By Jorj Osterberg
550 load tests of up to 150 MN have been completed on driven and bored piles using the Osterberg Load Cell. Because the test measures side shear and end bearing separately, much can be learned about t
Jan 1, 2001
-
-
Non-Destructive Testing Of Drilled Shafts - Title ? Table Of Contents - Introduction And OverviewBy Edmund J. Cardoza
WELCOME TO THE DEEP FOUNDATIONS INSTITUTE 26TH ANNUAL CONFERENCE AND WELCOME ESPECIALLY TO THIS SEMINAR ON NON-DESTRUCTIVE TESTING OF DRILLED SHAFTS, PRESENTED BY MEMBERS OF THE DFI DRILLED SHAFT COMM
Jan 1, 2001
-
Presentation #5 - The High-Strain Dynamic Load Test (Drop Weight Test) - ContentsBy Frank Rausche
Why testing What tests can be done Dynamic load testing Loading device Measurements Analysis Examples
Jan 1, 2001
-
Dynamic Load Testing Of Augered Cast-In-Place Piles (Rausche)By Frank Rausche
The more widespread use of Augered Cast-in-Place (ACIP) Piles has generated increased demand for improved quality control measures. These deep foundation elements are often relatively long and slender
Jan 1, 2001
-
-
Pile Load Testing At JFK International Airport - SynopsisBy J. Moskowitz
Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k
Jan 1, 2000
-
New York City - A Review Of Various Foundation Problems And Solutions - SynopsisBy Mel Febesh
Working in New York City has become the graveyard of many Foundation Contractors. Varying subsurface conditions require Foundation Contractors to be aware of the conditions at each particular site and
Jan 1, 2000
-
Installation Of Augered Cast-In-Place Piles - Equipment (1ca07ced-58e8-4100-8369-c2eebb984ebc)? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2000
-
Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:By Paul Morrison
The paper describes the design process, trial testing and contract pile installation of 772 precast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig
Jan 1, 2000
-
An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - IntroductionBy F. Pagliacci
Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste
Jan 1, 2000
-
Trends In Deep Foundations In Europe ? SynopsisBy R. Stenne
This paper presents the trends in deep foundations in Europe, both in terms of design and construction. Eurocode 7 which is a design code for geotechnical engineering will be introduced in the Eur
Jan 1, 2000
-
Installation Of Bored Pile Casings Through An Asbestos Tip By Rotary DisplacementBy Lewis Stansfield
A rotary displacement method was used to install permanent steel casings for bored piles through an asbestos tip. This method was chosen in preference to alternative driven systems because it was quie
Jan 1, 2000
-
Minimising The Environmental Impact Of Construction DewateringBy Peter Jackson
The dewatering of the large construction pits required for major infrastructure projects often has a significant impact on the environment. This is particularly so in urban areas and where groundwater
Jan 1, 2000
-
A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test ResultsBy Richard D. Short
The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field
Jan 1, 2000
-
A Cut And Cover In Stiff Clay In Eurre-France - SynopsisBy R. Stenne
This paper deals with a complementary soil investigation which being part of the contract helped understand the behavior of a softened clay and adjusted the design of a retaining structure accordingly
Jan 1, 2000
-
"Static Load Testing" How Important Is It? ? IntroductionBy Jack Hayes
The design and construction of deep foundations involve many uncertainties. For the designer there are uncertainties regarding soil and ground water variability, regarding sampling and lab testing, re
Jan 1, 2000
-
Skilled Operative Training For The Foundation Industry - SummaryBy Geoffrey Birch
A skilled and efficient workforce is a pre-requisite for the success of modern construction companies. The drive for improved performance, innovation and best value must be matched by the enhanced ski
Jan 1, 2000
-
Reflections On Our Industry - Foundation Vs GeotechnicalBy Arturo Ressi di Cervia
From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in
Jan 1, 2000