Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • DFI
    Recovery Efforts At The World Trade Center "Bathtub"

    By George J. Tamaro

    In 1967 the Port Authority of New York and New Jersey undertook the construction of the World Trade Center (WTC) diaphragm walls, installation of the lateral support system and the excavation of the s

    Jan 1, 2002

  • DFI
    Axial Pile Analyses For The New East Span Of The San Francisco-Oakland Bay Bridge

    By Jacob Chacko

    The east span of the San Francisco-Oakland Bay Bridge (SFOBB), which is one of the most heavily traveled bridges in the world, will be replaced due to seismic safety concerns. The majority of the new

    Jan 1, 2002

  • DFI
    Analyses Of Dynamic Increasing Energy Load Test On Deep Foundations

    By Silvana B. Foá

    Results from full-scale loading tests showed the use of the dynamic increasing energy test (DIET) to verify the capacity of deep foundations. This method allows the measurement of dynamic resistance -

    Jan 1, 2002

  • DFI
    Simbat : High Strain Dynamic Test Of Piles

    By Dominique Vié

    Standards methods covers the procedures for testing deep foundation to determine the force and velocity response to an impact of a pile driving hammer or similar device. The results of analysis genera

    Jan 1, 2002

  • DFI
  • DFI
    Case Histories, Part 2 - Etudes De Cas, Partie 2 - Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management

    By Mario Aiezza

    This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto

    Jan 1, 2002

  • DFI
    Case Histories, Part 1 - Études De Cas, Partie 1 - Jet Grouting Underpinning Of A Building In The Us

    By Gustavo E. Armijo

    This job was done in Morristown, NJ, with mono fluid system jet grouting for the construction of a new bank building. After the demolition of the existing two story structures, an excavation in loose

    Jan 1, 2002

  • DFI
    Partnering And Technical Innovation Used To Stabilize Slurry Trench Walls Under Commuter Rail Station For Boston's Big Dig

    By Paul Pedini

    The challenge of Contract C19E1 of Boston's Central Artery Project called for the construction of two roadways under the commuter rail yard at North Station. Two options were offered for the meth

    Jan 1, 2002

  • DFI
    Information Technology And Monitoring - Technologies De L'Information Et Monitoring - Innovations In Diaphragm-Wall Construction Plant

    By Maurice Guillaud

    The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th

    Jan 1, 2002

  • DFI
    Foundation Behaviour Of A Large HS-Train Viaduct After 4 Years' Operation

    By Michel Bustamante

    The Arbre viaduct, 200 metres long, is the most important structure on the Belgian portion of the High Speed Train line between Paris and Brussels. The particular geotechnical conditions of the soil w

    Jan 1, 2002

  • DFI
    Augered Cast-In-Place Piles: Regional Project Profiles - Community Osteopathic Hospital Harrisburg, Pa

    GENERAL CONTRACTOR: ALEXANDER CONSTRUCTORS, INC. STRUCTURAL ENGINEER: CAGLEY & ASSOCIATES, INC. GEOTECHNICAL ENGINEER: F.T. KITLINSKI & ASSOCIATES, INC. PILE FOUNDATION CONTRACTOR: L.G. BA

    Jan 1, 2001

  • DFI
    Keynotes: Axial Capacity Of Drilled Foundations In Soft Rocks And Intermediate Geomaterials - Presentation Notes

    By Michael W. Neill, O&apos

    This presentation addresses some of the problems encountered in estimating the capacity of drilled shafts and augered, cast-in-place piles in soft rock. Methods to quantify side and base resistance ar

    Jan 1, 2001

  • DFI
    Approach Wall Foundations Olmsted Locks And Dam Project ? Summary

    By Jeffrey A. Schaefer

    The Olmsted Locks and Dam project is located on the Ohio River approximately 16.5 miles upstream of its confluence with the Mississippi River. It consists of twin 1200 ft. locks with floating and fixe

    Jan 1, 2001

  • DFI
  • DFI
    Presentation #2 - Non-Destructive Testing For Drilled Shafts - Contents

    By Frank Rausche

    Introduction and Background Testing -Pile Preparation -Data Processing -Data Interpretation/Case Studies Case Studies - Existing Piles Stories from around the world

    Jan 1, 2001

  • DFI
    Presentation #3 - Cross-Hole Sonic Logging And Single-Hole Sonic Logging - Outline

    By Les R. Chernauskas

    ? What is Integrity Testing? ? Cross-Hole Sonic Logging (CSL) ? Single-Hole Sonic Logging (SSL) ? Typical Specifications ? Case Histories ? Observations and Conclusions WHAT IS INTEGRITY T

    Jan 1, 2001

  • DFI
    In Situ Soil Mixing Concepts Explained; Myths Dispelled - What Is Soil Mixing?

    By Richard W. Hanford

    The geotechnical construction industry generally considers soil mixing to be defined as an in situ ground improvement or treatment method by which a dry or wet reagent is introduced into the ground an

    Jan 1, 2001

  • DFI
    Augered Cast-In-Place Piles Quality Control

    By Rudolph P. Frizzi

    The current trend of increasing augered cast-in-place (ACIP) pile diameter, length, and load carrying capacities demonstrates improvements in installation equipment, increased acceptance, and that qua

    Jan 1, 2001

  • DFI
    Minipiles And Compaction Grouting For Seismic Retrofit Of Transportation Structures In The New Madrid Fault Zone

    By Steven D. Scherer

    The highest earthquake risk in the United States east of the Rockies is along the New Madrid Fault System, which extends for 193 km (120 miles) through the Central Mississippi Valley from northeastern

    Jan 1, 2001

  • DFI
    Access And Riser Shafts-Detroit River Outfall #2 ? Introduction

    By Edmund J. Cardoza

    The Detroit Water and Sewerage Department (DWSD) provides water and wastewater services to the Greater Detroit Metropolitan Area. Sewerage is treated at the DWSD Wastewater Treatment Plant (WWTP) loca

    Jan 1, 2001