Effect Of Slope On P-Y Curves; Under Passive LoadingBy K. [Muthukkumaran
An extensive program of laboratory model tests was undertaken to study the effect of slope on p-y curves under passive loading in dry sand. The paper concerns the method developed in a series of labor
Jan 1, 2006
-
Construction of 10’ Diameter Shafts for the Olmsted Approach Walls ProjectBy Thomas G. Tavernaro, Jeffrey A. Schaefer
"The $106 million Olmsted Approach Walls Project, completed in the spring of 2004 by Massman Construction Co., Kansas City, MO, is one phase of a new $1.4 billion Corps of Engineers locks and dam faci
Jan 1, 2006
-
Sandwich Wall Beneath Amsterdam Centraal Station - An Innovative Approach For Jet Grouting Under Difficult ConditionsBy J. C. W. M. de Wit
An excavation, within which a tunnel is sunk as a part of the Centraal Station underground station (platform section) of the Noord/Zuidlijn ('North/South Line'), is to be created beneath the
Jan 1, 2006
-
Augered Cast-In-Place Piles - Friday, May 5, 2006 - Title ? Table Of Contents - A Historical Perspective On Current Cast-In-Place Piling PracticeBy Willie M. NeSmith
Cast-in-place piling are a staple of the deep foundation industry, and are used (in various forms) worldwide. In assessing the application of cast-in-place piles, it is of value to reflect on the dev
Jan 1, 2006
-
Conference Papers - Conference Papers: Session 1 - Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora ProjectBy H. Boghosian
This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w
Jan 1, 2006
-
Large Diameter Steel Pipe Piles Running Under Self Weight In Soft Clay ' Predicted Vs. Observed Behavior ' Richmond San Rafael Bridge Seismic RetrofitBy A. R. Dover
The Richmond San Rafael Bridge (Figure 1) is a 4.3 mile long major toll bridge span across northern San Francisco Bay. Tutor-Saliba/Koch/Tidewater (TSKT) conducted a comprehensive seismic retrofit, wh
Jan 1, 2006
-
Optimized Neural Network Model For The Prediction Of Driven Pile's ResistanceBy Hyun. I. Park
Although numerous investigations have been performed over the years to predict the behavior and bearing capacity of piles, the mechanisms of these behavior and bearing capacity of piles have yet to be
Jan 1, 2006
-
Engineering The Mansion's HeritageBy Ken MacLeod
A development at 83 Queens Road in Melbourne, Australia required construction of a three level basement. The normal geotechnical constraints of excavating adjacent to an existing relatively new buildi
Jan 1, 2006
-
The Innovative CSM - Cutter Soil Mixing System for Constructing Retaining Walls and Cut-off WallsBy Erwin Stötzer, Renato Fiorotto, Wolfgang G. Brunner, Manfred Schöpf
"Deep mixing methods can be used economically for the construction of cut-off or excavation support walls where other systems such as traditional soldier beams and lagging walls would yie ld unsatisfa
Jan 1, 2005
-
Thirty Years of Experience with the Wave Equation Solution Based on the Method of CharacteristicsBy Peter Middendorp, Gerald E. H. Verbeek
"This paper will describe a brief history of the method of characteristics as an accurate solution of the wave equation, and the author's experiences with the method of characteristics over a period o
Jan 1, 2005
-
Design And Construction Of The Sutong Bridge FoundationsBy Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo
Jan 1, 2005
-
Field Test of Electroosmosis with the Injection of Saline Solution of Taipei Silty ClayBy Chang-Yu Ou, Shao-Chi Chien, Hsuan-Hsiang Chang
"A field test was performed to investigate the applicability of electroosmosis with the injection of saline solution of Taipei silty clay. The calcium chloride solution and sodium silicate solution we
Jan 1, 2005
-
Design And Construction Of The Rion Antirion Brdoge FoundationsBy Alain Pecker
The choice of a design concept for a bridge foundation is guided by various factors; several of these factors are indeed of technical origin, like the environmental conditions in a broad sense, but ot
Jan 1, 2005
-
Augered Cast-In-Place And Continuous Flight Auger Pile Foundation Systems For US Highway Projects - Why ACIPICFA Pile Foundations?By Silas C. Nichols
FHWA Interest is due to: ? An increase in successful projects in the U.S. private sector and in other countries ? Cost effective and more efficient in many circumstances ? Agency Prioritie
Jan 1, 2005
-
PMF Remediation of Oxford DamBy Scott Dodds
"The Oxford Hydroelectric Station was a unique project that incorporated a variety of dam strengthening methods to stabilize the facility in order to meet the standards required by Federal Energy Regu
Jan 1, 2005
-
Analysis and Case Study for Minimizing Differential Settlements in Piled Raft FoundationsBy Yu Chuang, Zai Jinmin, Liu Songyu
"The piled raft foundation is a geotechnical composite construction method, consisting of three elements, piles, raft and soils, which is applied for the foundation in an increasing number. Differenti
Jan 1, 2005
-
Full-Scale O-Cell Load Test for a Rotator Drilled Rock Socket at the Main Span of the New Benicia-Martinez BridgeBy Ronnie X. Gu, Xing Zheng, Gem-Yeu Ma
Due to implementation of the rotator construction method from which a smooth shaft was anticipated, a full-scale pile load test (Osterberg Method) was performed at Pier 14 Pile 9 of the main span of t
Jan 1, 2005
-
Installation Of Augered Cast-In-Place PilesBy Michael Moran
Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:
Jan 1, 2005
-
Installation Of Marine Pile Foundations At The Skyway Project For The San Francisco Oakland Bay BridgeBy Robb L. Swenson
Construction of foundations for the Skyway Segment of the San Francisco Oakland Bay Bridge required innovative techniques due to the mass of the structures being inserted and the unique subsurface of
Jan 1, 2005
-
Construction Technique Used To Build The Drilled Shafts For The Victory BridgeBy T. Jason Hardell
The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin
Jan 1, 2005