Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Seismic Retrofit Of Bridges; Geotechnical Design Considerations And Case HistoryBy Aly M. Mohammad
State and federal agencies during rehabilitation of existing bridges may require the existing bridges to be evaluated under seismic conditions. If the bridge does not perform under the seismic event,
Jan 1, 2006
-
Seismic Stability Analysis of Seepage Control Measures for Levees in Central Valley, CaliforniaBy Zia Zafir
"Levees in the central valley of California are primarily for flood control purposes and thus are subjected to infrequent hydraulic loading. The primary concern for these levees is their instability d
Jan 1, 2016
-
Seismoacoustic Effects Of Driving Large Diameter Piles ? SummaryBy Barry C. Roth
Driving of large piles in water can impact marine wildlife. Bubble curtains can mitigate these adverse effects. The procedures for and preliminary results of monitoring airborne, waterborne and ground
Jan 1, 2001
-
Selecting the Right Shoring System – San Francisco ExperienceBy Heinrich Majewski, Rob Jameson
"Careful review of site conditions and constraints is essential to select the appropriate shoring system for each project. Key evaluation criteria include the geotechnical profile, groundwater and env
Jan 1, 2017
-
Selection & Design Of Augered Cast-In-Place (ACIP) PilesBy Dan A. Brown
Outline ? Basic Concept of ACIP Piles ? Factors Affecting ACIP Pile Performance ? Applications: - Favorable Conditions - Unfavorable Conditions ? Design for Axial Loading ? Lateral Loa
Jan 1, 2004
-
Selection And Design Of Continuous Flight Auger And Drilled Displacement PilesBy Dan Brown
This paper provides an overview of the advantages and limitations of continuous flight auger (CFA) and drilled displacement (DD) systems compared to other deep foundation systems, along with a summary
Jan 1, 2005
-
Selection And Quality Control Of Deep Foundations At Ontario Hydro's Darlington Nuclear Generating Station - SynopsisBy F Debidin
The progressive rise of an H-pile during driving of an adjacent pile is described in this case history in which piles 15 to 18 m long were driven to end-bearing for the foundations for a 230 m long bu
Jan 1, 2010
-
Self Drilling Soil Nail Systems To Retain Caving SoilsBy Ali Porbaha
The use of soil nailing technology as a cost effective alternative for excavation support and slope stabilization has substantially increased in the United States during the last decade. For example,
Jan 1, 2006
-
Self Hardening Slurry Wall Installation By Hydromill At The Herbert Hoover Dike ? An Innovative SolutionBy Mario Mauro
In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehabi
-
Self-Drilling MicropilesBy Matt Sotirin
The Santa Fe train station and passenger rail platform were constructed in the downtown district of Fort Madison, Iowa, over a century ago. This landmark building and rail platform were in need of maj
Oct 1, 2022
-
Self-Hardening Slurry Wall Installation by Hydromill at the Herbert Hoover Dike – An Innovative Solution (05e83755-4ec2-4ed4-a26c-d1e81c41960c)By Mario Mauro, Jeff Taylor, Carlos Morales
"In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehab
Jan 1, 2017
-
Selmon Expressway, Tampa: Case History of Drilled Shaft Design for Extreme VariabilityBy Ross T. McGillivray, David S. Graham, Dan A. Brown, Steven D. Dapp
"The Selmon Expressway includes an elevated structure extending across several miles of weathered karstic limestone geology, and represents a challenge for design because of the high variability of th
Jan 1, 2015
-
Session 10 Deep Mixing Method IBy Peter Cali
There is one organization in Sweden, The Swedish Deep Stabilization Research Centre, which has been working with these questions and there is also a project, Eurosoilstab, within European Union to tak
Feb 10, 2003
-
Session 11 Jet Grouting IIBy George Burke
Of the three projects, particularly the extensive Nimitz II (downtown) project, a single system, which was part of the operation, was used to control the spoil. Spoil control was continuous with the w
Feb 10, 2003
-
Session 12 "Deep Mixing Method II"By Helen Ahnberg
The scope of the present paper is limited to report the experimental evidence and not for describing the analytical assumptions. However, the idea behind the experimental program is that the deteriora
Feb 10, 2003
-
Session 13 "Jet Grouting III"By Peter Iovino
Unfortunately, I don't know the unit cost per cubic yard of treatment. I reflected on that yesterday and I don't think that we considered the use of micropiles. They could have been an optio
Feb 10, 2003
-
Session 14 "Deep Mixing Method III"By Stefan Dahlin
The laboratory tests indicated low permeability but as I said, as a rule, the permeability in the field has been found to be higher. A high permeability has also been found when doing back calculation
Feb 10, 2003
-
Session 15 "Jet Grouting IV"By Mitsuhiro Shibazki
I can't answer that question but I am looking at Andy, my co-author, and he says we didn't measure it. No movement. If I understand it correctly, how do we handle lateral forces in shear? T
Feb 10, 2003
-
Session 16 "Deep Mixing Method IV"By Mary Ellen Bruce
Let me first address the issue of the wet grab samples. The wet grab samples that were attempted to take on the Central Artery were hindered by the fact that the way the mixing was being done was only
Feb 10, 2003
-
Session 17 "Grout for Enhancement of Piles and Piers"By Dennis Wrixon
It was a little bit exceeded. The decision was the uniform settlement is measured at each one corner and the highest one corner is the important one. And in addition there is a differential settlement
Feb 10, 2003