Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Secant Pile Walls - A Consistent Approach to Risk ManagementBy Vivian M. Troughton, Clifford J. Wren, Tony P. Suckling
"Secant pile walls are used for the construction of deep basement walls and earth retaining structures. Risk associated with secant pile walls is commonly perceived as being the safety of site personn
Jan 1, 2005
-
Secant Pile Walls - Design, Construction And Case HistoryBy Ketan H. Trivedi
This paper describes the method of analyses used for the design of temporary and permanent Secant Pile Walls, describes various aspects of construction including, guide walls, sequence of pile install
Jan 1, 2006
-
Securing of In-Situ Cement Mixing Quality for the Expansive Soil with the ‘Montmorillonite’ InclusionBy Masaru Sakakibara, Ngo Tuan Anh, Mitsuo Nozu
"In the southern region of Vietnam and the southern United States, numbers of Deep Mixing (DM) columns have been installed to increase the stability of slopes and mitigate ground settlement. However,
Jan 1, 2015
-
Securing Rail Infrastructure in RomaniaBy Andreas Brandner
"At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors
Jan 1, 2017
-
Seepage Barrier at Bolivar DamBy Mohamed Elgouhary, Carol L. Tasillo, Daniel Koziol
"The Bolivar Dam, located near the Village of Bolivar, Ohio is one of a system of dams designed to provide flood control and water conservation in the Muskingum Watershed. The Bolivar Dam is a “dry da
Jan 1, 2016
-
Seepage Barrier Mix Design Development, Installation, and EvaluationBy George W. Little, John Councilman
"The selection, evaluation, and modification of contractor mix designs for self-hardening seepage barriers, completed by the slurry trench excavation method, can be one of the most critical and challe
Jan 1, 2016
-
Seepage Cut-Off Wall Installation Using Cutter Soil Mixing for Herbert Hoover Dike RehabilitationBy Michael Arnold
"BAUER Foundation Corp. was one of three contractors awarded with the installation of a cut-off wall at the Herbert Hoover Dike Rehabilitation project. The cut-off wall was constructed up to 84 feet d
Jan 1, 2015
-
Segmented Prestressed Concrete Piles For Coastal Environments ? SynopsisBy S. Ahmed
Critical factors of selection, fabrication, installation, and splicing of prestressed concrete piles are discussed based on experiences with coastal subsurface conditions of the United States of Ameri
Jan 1, 2010
-
Seismic Analysis Of Drilled Shafts As Earth Retaining Structure Based On Site CharacterizationBy Bernardo J. Jiménez Vega, Edy L. T. Montalvan
During the last phase of the Circunvalacion Norte project in San Jose, Costa Rica, preliminary designs for an underpass structure of over 16 km (10 miles) considered drilled shafts as an earth retaini
Oct 1, 2022
-
Seismic and Lateral Load Design and Testing GuidelinesBy Don Deardorff, Ke Yang, Yingcai Han, Ken Sorensen, Robert Kruger, Mark Petersen, Diane Fiorelli, Larry Goldfarb, Kathryn Petek, Kwabena Ofori-Awuah
Design of deep foundations for lateral loads requires an understanding of soil-foundation-structure response during loading. Lateral loads on a deep foundation (piles) could be due to earthquakes, win
Jan 1, 2012
-
Seismic Behavior Of Full-Scale Piles In Improved Soft ClayBy Bradley J. Fleming
Although soil improvement and its application to deep foundations is gaining popularity in the engineering community, this technique is not widely used in high seismic regions due to lack of fundament
-
Seismic Behavior of Full-Scale Piles in Improved Soft Clay (8135d170-323f-4789-8067-7d5f00fd5bb8)By Jin-Wei Huang, Bradley J. Fleming, Sri Sritharan
"Although soil improvement and its application to deep foundations is gaining popularity in the engineering community, this technique is not widely used in high seismic regions due to lack of fundamen
Jan 1, 2017
-
Seismic Considerations for Bridge FoundationsBy Lok M. Sharma
"Construction of a new bridge in a seismically sensitive area requires careful assessment of earthquake impact on the serviceability of the facility. Not only is the superstructure vulnerable, the fou
Jan 1, 2017
-
Seismic Design for the I-30 Crossing Project in Little Rock, ArkansasBy David S. Graham, Benjamin Turner, Paul J. Axtell
Seismic challenges were at the forefront of design for two parallel replacement bridge structures over the Arkansas River as part of the I-30 Crossing Project in Little Rock, Arkansas. Although not an
Sep 8, 2021
-
Seismic Design Of Micropile Foundation SystemsBy Leo Panian
Over the last decade, drilled and post-grouted micropile foundations have come to be increasingly relied upon for resisting seismic loads in building foundations on the West Coast. Micropiles have bee
Jan 1, 2010
-
Seismic Hazards Evaluation and Lateral Pile Design in Diatomaceous EarthBy Arash Khosravifar, Matt Steffan
An expansion of the City of Klamath Falls Wastewater Treatment plant required geotechnical seismic hazard evaluations and deep foundation design. The site is located on the shore of Lake Ewauna and is
Jan 1, 2018
-
Seismic Rehabilitation Of Seattle's Pier 69By David Pierce
The Port of Seattle, one of the largest on the west coast of North America, made a strong statement regarding their support for reusing existing structures when a decision was made to rehabilitate Pie
Jan 1, 1992
-
Seismic Remediation of Perris DamBy Michael W. Driller, Wen Yan (Grace) Chen, Steven J. Friesen
"Remediation for Perris Dam has been proposed in response to deficiencies identified in a seismic stability study prepared by the California Department of Water Resources (DWR) in 2005. Lenses of pote
Jan 1, 2015
-
Seismic Response Of Raft Foundations Supported On Aggregate PiersBy Alper Turan
The use of aggregate pier foundation systems has become widespread as the engineering practice moves towards cost-effective ground improvement solutions that provide accelerated construction schedules
-
Seismic Response of Raft Foundations Supported on Aggregate Piers (f3188351-761b-458f-b00c-1bcc1cb9cf93)By Alper Turan, Hesham El Naggar
"The use of aggregate pier foundation systems has become widespread as the engineering practice moves towards cost-effective ground improvement solutions that provide accelerated construction schedule
Jan 1, 2017