Search Documents

  • SAIMM
    Optimal Coal Processing Route For The 3 X 0,5 Mm Size Fraction? - Introduction

    By Jeremy Bosman, Johan de Korte

    Traditionally the feed to coal preparation plants was de-slimed at 0,5 mm. The +0,5 mm size fraction was processed via dense-medium cyclones and the -0,5 mm size fraction was beneficiated with froth f

    Jan 1, 2006

  • SME
    A Patent Licensing Regime for the Development and Protection of the Area’s Resources

    By Yao Zhou

    Under the United Nations Convention on the Law of the Sea (UNCLOS), the international seabed area (Area) and its resources are the common heritage of humanity (CHH). Patent rights can be incompatible

    Sep 1, 2014

  • SAIMM
    Characterization Of Coal Mine Panels In Bord And Pillar Workings In Respect Of Their Proneness To Spontaneous Heating - A Prediction Model

    By T. R. Roy

    A prediction model, developed by Central Mining Research Institute (India) for evaluation of fire risk rating of underground coal mine panels in bord and pillar working in respect of their proneness t

    Jan 1, 2003

  • IIMP
    Implementación y puesta en marcha de los primeros camiones autónomos en el Perú

    By Luis Herrera, Luis Huamán

    La minería peruana se distingue por sus estándares de clase mundial: la innovación es parte de su ADN. En ese contexto, Ferreyros y Caterpillar toman el encargo de participar en el proyecto cuprífero

    Sep 30, 2022

  • NIOSH
    World Gold - A Minerals Availability Appraisal - Executive Summary - The World Gold Industry - An Introduction

    More gold is being produced now than ever before in recorded history. All over the world huge quantities of ore are being mined and processed, thanks to historically high prices for gold and the use o

    Jan 1, 1994

  • SME
    Inorganic Polymers Improve Bitumen Recovery From Low Grade Canadian Oil Sands

    By A. Mahmoudkhani

    There has been a continuous interest in chemical aids for processing Canadian oil sands by hot water extraction process since the first commercial industry operation in 1967. Several inorganic and org

    Jan 1, 2012

  • ISEE
    Computer-Aided Design & High-Precision Systems in Drilling & Blasting

    By William Wilkinson, Vladisla Kecojevic

    Current three-dimensional (3D) computer design technology leveraged into drill and blast planning and operations is changing the way engineers and operations approach drill and blast design. Additiona

    Jan 1, 2004

  • ISEE
    Evaluation of Ground Vibration Induced by Blasting During the Excavation of a Transportation Tunnel in Istanbul Metropolis

    By Ali Kahriman, Abdulkadir Karadogan, Deniz Adiquzel, Umit Ozer, Suat Bicer, Mehmet Aksoy

    This paper presents the analysis and measurements of blast-induced ground vibrations during the construction of Istanbul Kagithane – Piyalepasa – Dolapdere – Dolmabahçe highway tunnels. These tunnels

    Jan 1, 2008

  • DFI
    Geotechnical Investigation For Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California

    By Lawrence P. Goldfarb

    This paper presents the results of the geotechnical investigation for the repair of the Fashion Island Boulevard Bridge, Bridge No. 350160, in San Mateo, California. The concrete, precast girder bridg

    Jan 1, 1993

  • SAIMM
    Annual Financial Statements - Report Of The Independent Auditors

    To the members of The South African Institute of Mining and Metallurgy We have audited the annual financial statements set out on pages 239 to 245. These financial statements are the responsibility

    Jan 1, 1997

  • DFI
    Interpretation Of Full Scale Horizontal Pile Loading Tests In Sand Analysis Of P-Y Curves

    By Ali Bouafia

    Five full-scale horizontal loading tests of piles carried out by the LCPC in France are interpreted in order to analyse P-Y load-transfer curves. The experimental piles are either bored or jacked into

    Jan 1, 2002

  • CIM
    Reducing maintenance costs through predictive fault detection

    By Y. Faitakis

    In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis.

    Jan 1, 2004

  • NIOSH
    RI 6681 Measurement Of Backscattered Electrons In An Electron Probe Microanalyzer

    By Philip G. Burkhalter

    Total yield and backscattered electron coefficients were measured in this Bureau of Mines study in an microanalyzer as a function of atomic number and of primary crier: ;y in the 15- to 35-kilovolt ra

    Jan 1, 1965

  • NIOSH
    OFR-10-80 Evaluation Of Mine Parameters For Copper-Nickel Deposits For Northern Minnesota

    By C. M. St. John

    A series of analyses of possible mining excavations associated with the development of copper nickel deposits of the MINNAMAX site in Northeastern Minnesota is presented. Specific areas such as roof a

    Jan 1, 1979

  • SAIMM
    Method statement for Excavation of Powerhouse Cavern Considering Mudstone Layers in Masjed Soleiman Dam

    By M. Shahabi, M. Kashfi

    This paper briefly describes the excavation procedure of a powerhouse, comprising of its incremental excavation, reinforcement measures, and the installed monitoring system. During the first phase of

    Jan 1, 2003

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009

  • SAIMM
    Factors Influencing Base Metal Recovery From Waste Reverberatory Furnace Slags In A50 KVA Laboratory DC Plasma Arc Furnace

    By W. Banda

    Paper written on project work carried out in partial fulfilment of Phd. (Process Engineering) degree* The recovery of cobalt and copper from waste slag was studied in a plasma DC-arc furnace in red

    Jan 1, 2004

  • SME
    In-Mine Study Of High-Expansion Firefighting Foam - Preprint 09-095

    By L. L. Chasko

    A mine fire is one of the most challenging safety issues facing a mine operator and can occur at any location underground. The National Institute for Occupational Safety and Health (NIOSH) and the Tw

    Jan 1, 2009

  • ISEE
    Effects of Accurate MS Delays on Productivity, Energy Consumption at the Primary Crusher, Oversize, and Ground Vibrations and Airblast

    By James W. Reil, Douglas A. Anderson, Steven L. Burchell

    A total of 26 full-scale production blasts at three sites were extensively monitored with sophisticated instrumentation systems to determine the benefits of more accurate detonators. The new and more

    Jan 1, 1986

  • AUSIMM
    Reductive Leaching of Manganese Containing Material with Pyrite in a Mild Sulphuric Acid Medium

    By Parida K. M, Paramguru R. K

    Laboratory-scale studies aimed at developing a process for solubilising manganese values from a low grade pyrolusite containing material using low grade pyrite, both available in India, are described.

    Jan 1, 1995