Search Documents

  • IIMP
    Implementacion de SIC para la gestion de operación y costos en la Concentradora Toquepala

    By Alberto Buendía Meza

    La Concentradora Toquepala, ubicada en el Departamento de Tacna produce concentrado de cobre y molibdeno, los cuales son enviados a la Fundición ubicada en el puerto de Ilo y comercializados al exter

    Sep 14, 2009

  • AUSIMM
    Blast Hole Diamond Drilling as Developed for Sub-Level Stoping at New Occidental Gold Mines, N.L., Cobar, N.S.W.

    By Creelman C. A

    With the technique and data obtained in using the blast hole diamond drill for "Removal of Horizontal Level Pillar by means of Blast Hole diamond drilling at New Occidental Gold Mines N.L.,"

    Jan 1, 1945

  • SME
    Increased value of refined high sulfur coal

    By P. R. Dugan

    Sulfur removal from high sulfur coal has several objectives including: a) reduction of the atmospheric load that contributes to the problem of acid precipitation; b) reduction of ash, which contribute

    Jan 1, 1988

  • IIMP
    Purgatorio mirave, falla activa en la cordillera occidental del sur del perú

    By Carlos Benavente

    La actividad sísmica del Perú se origina en el proceso de convergencia de la Placa de Nazca bajo la Sudamericana, donde la geometría de la placa oceánica presenta dos tipos de segmentos, una que subdu

    Sep 14, 2009

  • CIM
    Integrated Underground Mining and Processing Of Massive Sulphide Ores

    By Bern Klein, Malcolm Scoble, Justin Widdifield, Andrew Bamber

    "It has been suggested that the pre-concentration of ore underground can bring positive economic and environmental benefits to underground mining, particularly at extreme depth. The integration of min

    Jan 1, 2006

  • AUSIMM
    Geological Structure of the Hill 50 Gold Mine

    The Hill 50 Gold Mine is situated at Boogardie, 3 miles on a bearing of 295 degrees from; Mount Magnet township. Mount Magnet lies 300 miles north-north-east of Perth, Western Australia (Fig. 1).The o

    Jan 1, 1960

  • NIOSH
    RI 5973 Heats Of Formation Of Sodium Molybdates And Tungstates ? Introduction And Summary

    By Mary F. Koehler

    Continuing a program of thermochemical investigation of compounds of to ferroalloy elements, this paper contains ins values of the heats of formation of two sodium molybdates (Na2Mo04 and Na2Mo207) an

    Jan 1, 1962

  • DFI
    Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, La

    By Antal Partos

    ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring

    Jan 1, 1992

  • AUSIMM
    The Geology of the Golden Cross Orebody - Complex Veining and Evolving Mining Responses

    By W C. Cook, S J. Mathews, A H. Purvis

    The Golden Cross Gold Mine is located at the head of the Waite kauri Ri ver, 8 km northwest of Waihi near the southern end of the Coromandel Range. The mine produces gold and silver from epithermal ve

    Jan 1, 1993

  • NIOSH
    RI 6475 Perfluorocyclobutane The Thermodynamic Properties of the Real Gas

    By R. H. Harrison, D. R. Douslin

    The thermodynamic properties H - H° , (H - H° ) /T , S - Sideal , S - S° Fide al F - F° , (F F° ) /T , and activity coefficient Y for perfluorocyclobutane were calculated as functions of temperatures

    Jan 1, 1964

  • SME-ICGCM
    Performance Evaluation Of A Cable Bolted Yield-Abutment Gate Road System At The Crandall Canyon No. 1 Mine, Genwal Resources, Inc., Huntington, Utah

    By J. R. Koehler

    Although two-entry yield pillar-based gate roads supported by wooden cribs have been commonly used throughout longwalling in the Wasatch PlateadRoan Cliffs coalfield of central Utah, a three-entry yie

    Jan 1, 1996

  • DFI
    Challenges Associated with the Construction of a Cofferdam – A Case Study

    By Eric S. White, Thomas J. Sabourin, Khuram R. Mohib

    "This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init

    Jan 1, 2017

  • NIOSH
    IC 6727 Factors And Conditions That Aid In Alinement Of Pillar Extraction Lines In Coal Mining ? Importance Of Pillar Recovery

    By J. N. Geyer

    During the early stages of the mining industry of the United States an apparently inexhaustible supply of high-quality, easily accessible coal made the product cheap and the attendant mining methods w

    Jan 1, 1933

  • AUSIMM
    Tungsten at Hatches Creek, Central Australia Mining and Treatment

    Local conditions at Hatches Creek are described, together with the mineralogy, mining and treatment of tungsten ores, with particular reference to procedures adopted by Pimer Mines, N.L.The Hatches Cr

    Jan 1, 1955

  • SAIMM
    Innovations In Precious Metal Recovery

    By C. van Tonder

    Paper written on project work carried out in partial fulfilment of B Tech (Engineering Metallurgy) degree This investigation relates to a multi-purpose electrolytic system. Its primary purpose is t

    Jan 1, 2006

  • NIOSH
    OFR-50-84 Stress Analysis Of Wire Hoist Rope

    By George A. Costello

    A theoretical analysis is presented for the static and dynamic response of wire rope in deep-shaft mining operations. Expressions for the stresses in the individual wires of complex wire ropes are der

    Jan 1, 1983

  • NIOSH
    IC 8862 Land Utilization And Reclamation In The Mining Industry, 1930-80

    By Wilton Johnson

    The Bureau of Mines study indicates that land utilized by the mining industry for mineral extraction and processing from 1930 through 1980 amounted to 5.7 million acres, or 0.25 percent of the land ma

    Jan 1, 1981

  • SAIMM
    The Mineral And Petroleum Resources Development Act Of 2002: A Paradigm Shift In Mineral Policy In South Africa

    By F. T. Cawood

    Inauguration of the new political dispensation in South Africa in1994 initiated a dynamic shift in the ownership, management and development of the country?s affluent mineral heritage. The process of

    Jan 1, 2004

  • NIOSH
    OFR-20-84 Feasibility Study Of In-Mine Coal Preparation Facilities

    This work examined the feasibility of in-mine coal preparation in two phases. Phase I included a survey of previous investigations and a preliminary analysis of the economic and technical feasibility

    Jan 1, 1982

  • NIOSH
    IC 8835 Guide To Substation Grounding And Bonding For Mine Power Systems

    By Wils L. Cooley

    Although electric utility companies have been active in grounding and bonding within substations, the mining engineer or mine electrical engineer is not involved to the extent that he can be fully up-

    Jan 1, 1980