Search Documents

  • AIME
    Officers and Directors (9bbd7f01-00bc-4bf0-9ea0-06133fe6415b)

    PRESIDENT AND DIRECTOR JOHN M. LOVEJOY NEW YORK, N. Y. PAST PRESIDENTS AND DIRECTORS HOWARD N. EAVENSON PITTSBURGH, PA. HENRY A. BUEHLER ROLLA, Mo. VICE-PRESIDENT, TREASURER AND DIRECTOR KARL EI

    Jan 1, 1936

  • CIM
    Selection of a Process Flowsheet to Treat Old Copper-Containing Tailings with the use of Process Mineralogy

    By S. V. Ulianov, A. Y. Senchenko, E. M. Kurchevskaya

    "A process sample of old copper-containing tailings (-2.0+0 mm) from an iron-ore plant was tested in TOMS institute in order to develop a process for copper concentrate production. The study of tailin

    Jan 1, 2016

  • NIOSH
    OFR-136-84 Ultralightweight Oxygen Container

    By Ben Aleck

    The objective of this program was to adapt Space Shuttle technology on high-performance spherical pressure vessels to cylindrical pressure vessels. Specifically, a cylindrical aluminum liner overwrapp

    Jan 1, 1983

  • NIOSH
    OFR-72-76 Water Jet Chock Mounted Miner Feasibility Study ? Executive Summary

    The contract for the Water Jet Chock Mounted Miner Feasibility Study was awarded to FMC Corporation's Advanced Products Division on 18 November, 1974. The program was divided into four phases as

    Jan 1, 1975

  • AIME
    Officers and Directors (2f012bf6-86d7-4c1e-aa21-7384fbb09f2d)

    PRESIDENT AND DIRECTOR JOHN R. SUMAN HOUSTON, TEXAS PAST PRESIDENTS AND DIRECTORS DONALD B. GILLIES CLEVELAND, OHIO H.- G. MOULTON NEW YORK, N.Y. TREASURER AND DIRECTOR KARL -EILERS SEA CLIFF

    Jan 1, 1941

  • AIME
    Officers and Directors (22c772fe-dba0-4428-a53d-b9f758275183)

    PRESIDENT AND DIRECTOR R. C. ALLEN . CLEVELAND, OHIO PAST PRESIDENTS AND DIRECTORS H. A. BUEHLER ROLLA, Mo. JOHN M. LOVEJOY NEW YORK, N. Y. VICE-PRESIDENT, TREASURER AND DIRECTOR KARL EILERS

    Jan 1, 1937

  • ABM
    Aplicação Do Processo De Produção Enxuta Na Operação Unitária De Filtragem No Processo De Pelotização Das Usinas Itabrasco E Hispanobrás

    By Ângelo José de Santana Tavares Cavalcanti

    Este trabalho apresenta o desempenho após a implantação do processo de produção enxuta na operação unitária de filtragem do processo de pelotização das usinas Itabasco e Hispanobrás, com o propósito d

    Aug 1, 2018

  • SME
    Design and Risk Management Strategy for the Sound Transit Beacon Hill Station and Tunnels

    By Joseph Gildner, Donald J. Phelps, Jürgen Laubbichler, Christopher Tattersall, David McAllister

    The Beacon Hill Station and Tunnels portion of the Sound Transit Central Link Project consists of one mile of twin rapid transit tunnels, an underground station, portals and ancillary works constructe

    Jan 1, 2005

  • ABM
    Otimização De Equipamento Rodoviário No Transporte De Carvão Vegetal Da Vallourec, Visando Otimização De Recursos E Com Gestão Do Processo Via Sap

    By André Luíz Moreira de Souza

    O objetivo do trabalho é demonstrar a otimização de recursos com a implantação de grades de agendamento e gestão logística via SAP do processo de abastecimento da Vallourec Tubos do Brasil, com carvão

    Jul 29, 2018

  • AIME
    Officers and Directors (ef74e94e-2f55-442d-bab5-49a9e96b79a4)

    PRESIDENT AND DIRECTOR JOHN M LOVEJOY NEW YORK, N. Y PAST PRESIDENTS AND DIRECTORS HOWARD N EAVENSON PITTSBURGH, PA HENRY A BUEHLER ROLLA, MO. VICE PRESIDENT, TREASURER AND DIRECTOR KARL EILERS

    Jan 1, 1937

  • AUSIMM
    Exploration and Mineral Discoveries in Peru

    By C E. Vidal

    Geological exploration and mining development increased their intensity and rate of success during the last five years in Peru. Particularly relevant are the mining projects of Yanacocha and Pierina f

    Jan 1, 1999

  • NIOSH
    IC 8800 Mine Power Systems Research (In Four Parts) 2. Grounding Research

    This Bureau of Mines publication contains five papers pertaining to the effective grounding of mine power systems, as follows: Ground-check monitor types and safety characteristics; ground wire monito

    Jan 1, 1979

  • AUSIMM
    Mining and the Resource Management Act 1991: Is the Playing Field Level?

    By A P. Brown

    Comparison of legal permits required for mining (as opposed to prospecting or exploration) inNew Zealand, under the Mining Act 1971 and the Resource Management Act/Crown Minerals Act 1991. Mining gene

    Jan 1, 1995

  • CIM
    Centrifuge Units for Gravity Separation - An Update

    By André R. Laplante

    "This presentation reviews three continuous centrifuge separators, the Falcon-C, Kelsey Jig and Multi-Gravity Separator, two units with possible synergies with centrifuges, the In-Line Pressure Jig an

    Jan 1, 2000

  • DFI
    Current State Of Practice Of Corrision Protective Systems For Tierods And Tiebacks Used In Marine Applications ? Introduction

    By Thomas A. Printz

    The wide use of carbon steel in construction and engineering projects makes this engineering material accountable for approximately 85% of the total annual steel production worldwide. Despite the lac

    Jan 1, 2013

  • NIOSH
    OFR-40(2)-82 Development Of Methods For Reclaiming Abandoned Tailings Ponds And Dams - Volume II - Appendixes

    By Robert D. Perry

    This report describes methods of reclaiming abandoned or inactive tailings ponds and dams. The investigated sites were selected tailings deposits adjacent to metal mines in the southwestern United Sta

    Jan 1, 1981

  • AUSIMM
    The Effects of Environment on Bacterial Leaching Rates

    Further evidence is presented as to the widespread occurrence of Thiobacillus ferrooxidans in nature in association with sulphide minerals. Leaching rates are discussed in terms of the effect of envir

    Jan 1, 1968

  • AUSIMM
    Understanding and Predicting Transport in Pit-Lakes

    Upon cessation of mining activity open-cast mine pits typically fill with water, forming a æpit-lakeÆ. The water in these lakes, in some instances, contains high concentrations of ædeleteriousÆ materi

    Jan 1, 2002

  • SME
    Niagara Tunnel Project

    By Doug Harding

    The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.

    Jan 1, 2007

  • DFI
    Brightman Street Bridge Replacement Project

    By Arturo Ressi di Cervia

    Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, conc

    Jan 1, 2003