    A Heuristic Sublevel Stope Optimizer With Multiple Raises

    By X. Bai

    A new heuristic sublevel mining stope optimizer is presented. The optimizer seeks the best locations and lengths of a series of vertical raises that, together with the blocks linked to each raise, def

    Jan 1, 2014

  • SAIMM
    Two Rivers Platinum Mine: The Orebody, The Mining Method - A Perfect Match (f51ca3a6-f12c-45c8-a3d7-d1d4f9dd2f91)

    By M. Mabuza

    Two Rivers Platinum Mine (TRP) is a 55:45 joint venture between African Rainbow Minerals and Impala Platinum, respectively. TRP is situated on the farm Dwarsrivier 372KT, in the southern sector of the

    Jan 1, 2007

  • ISEE
    Fire and Explosion of a Mobile Explosive Manufacturing Unit

    By Jose a. Sanchidrian, Ramon G. Eguren, Javier L. Amigo

    On December 2013 a MEMU exploded at a blasting site in Norway, after burning for more than two hours. This paper describes the analyses made to determine the actual yield of the explosion, the lessons

    Jan 1, 2016

  • SME-ICGCM
    Monitoring Roof Beam Lateral Displacement At The Waste Isolation Pilot Plant

    By L. J. Terrill

    Lateral displacement in the immediate roof beam at the Waste Isolation Pilot Plant (WIPP) is a significant factor in assessment of excavation performance for the design of ground control systems. Info

    Jan 1, 1996

  • AUSIMM
    Robotic Hang-up Assessment and Removal of Rock Blockages in Mining Operations Using Virtual Reality for Safety

    By G Baiden

    The removal of rock blockages in mining operations has long been a risky undertaking, especially in high overhead conditions. Moreover, the assessment of where to put charges and the placement of them

    May 9, 2016

  • AUSIMM
    Analysis and Modelling of the Fragmentation Process – Case Studies at El Teniente Mine

    By V Barrera, A Brzovic, M Gaete, L Burgos, E Arancibia

    Fragmentation is one of the most relevant parameters in the design and operation of a mine using the caving mining method. Fragmentation affects all subsequent operations, including extraction, commin

    May 9, 2016

  • SAIMM
    The West Driefontein Reclamation Carbon-In-Pulp Plant; Pilot Plant Testwork, Design, Commissioning And Optimization

    By G. D. Buson

    Driefontein Consolidated Limited has a proud history in the South African gold mining industry dating back to March 1945 with the formation of the West Driefontein Gold Mining Company. The reclamation

    Jan 1, 1999

  • CIM
    Prevention of Losses in Rail Shipment of Concentrate at Mattagami Lake Mines

    By K. V. Konigsmann

    "Mattagami Lake Mines Ltd operate a zinc-copper mine with an annual output of about 200,000 tons of zinc and 30,000 tons of copper concentrates. Zinc concentrates arc shipped to a company owned smelte

    Jan 1, 1975

  • NIOSH
    Effects Of Weak Bands On Pillar Stability In Stone Mines: Field Observations And Numerical Model Assessment

    By John L. Ellenberger, Gabriel S. Esterhuizen

    Observations of pillar conditions in limestone mines showed that the presence of weak bands in the limestone can result in pillar damage at stresses that are lower than one would otherwise expect. The

  • SAIMM
    Stope deformation measurements as a diagnostic measure of rock behaviour: a decade of research - Synopsis

    By D. F. Malan

    This paper presents an overview of work conducted over several years to investigate the continuous stope closure profiles recorded in tabular excavations and the use of this data as a hazard indicator

    Jan 1, 2007

  • DFI
    Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - Synopsis

    By N. S. Yet

    This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C

    Jan 1, 2000

  • DFI
    Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - Synopsis

    By Robert Jakiel

    The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange

    Jan 1, 2000

  • SME
    TPM (Total Productive Mining)

    By G. Budge

    In the extractive industry the term ‘continuous improvement’ (CI) usually means procurement of the latest state of the art equipment. This is generally perceived as the only way to add further value

    Jan 1, 2001

  • SME-ICGCM
    Time Dependent Roof Deterioration At A Central Ohio Coal Mine (b0f3bbeb-91e8-4a62-8116-5f9e444a047e)

    By Ted Klemetti

    Roof deterioration in weak moisture-sensitive rock leads to roof falls in coal mines. An observation site was set up in intake air at an underground coal mine in central Ohio to evaluate the time-dep

    Jan 1, 2009

  • NIOSH
    RI 6058 Safety Characteristics Of Normal Propyl Nitrate

    By Michael G. Zabetakis

    Limits of flammability of normal propyl nitrate (NPN) vapor were investigated at ambient and elevated temperatures. Minimum spontaneous ignition and decomposition temperatures were determined with lab

    Jan 1, 1962

  • SME
    Application Of Virtual Reality In The Mining Industry – Where We Are Now? - SME Annual Meeting 2023

    By N. Akbulut, A. Anani

    From the initial planning phases to the closing of a mine, mining is an industry where high attention, care, and sensitivity are needed in every step of the mine life. Since mining projects have a lon

    Feb 1, 2023

  • SAIMM
    Quantification of the impacts of coalmine water irrigation on the underlying aquifers - Synopsis

    It is predicted that vast volumes of affected mine water will be produced by mining activities in the Mpumalanga coalfields of South Africa. The potential environmental impact of this excess water is

    Jan 1, 2009

  • AIME
    Concreting Drifts at Ray Mines Division of Kennecott Copper Corporation

    By Robert Thomas

    DURING the past 20 years the advantages of reinforced concrete as a substitute for timbering in so-called permanent mine openings have been fully recognized, and its use has become almost general prac

    Jan 1, 1936

  • AUSIMM
    An Integrated Solid Waste Management Method for Western Macedonia, Greece

    An Integrated Solid Waste Management Method for Western Macedonia, Greece

    Sep 13, 2010

  • AUSIMM
    The Mining and Forestry Industries - Will They Ever See Eye to Eye?

    By A P. Tinnelly

    This paper explores the structural/physical and policy based issues that have lead to the apparent resource conflict between Forestry and Mining on the West Coast. Both industries are important to th