Search Documents

  • AUSIMM
    Mining a 100 Million Tonne Orebody Without Subsidence

    The major copper orebody at Mount Isa is being extracted at a rate of four million tonnes per year. The method used requires an equivalent rate of back filling with (mainly) cemented fill. There were

    Jan 1, 1980

  • DFI
    What Causes Piles To Penetrate - Introduction

    By George G. Goble

    In the middle of the nineteenth century, the dynamic formula appeared as a description of pile penetration during impact driving. The simplicity of use of the formula combined with the power of the en

    Jan 1, 1995

  • SAIMM
    Maximizing Haematite Recovery Within a Fine and Wide Particle-Size Distribution Using Wet High-Intensity Magnetic Separation

    By M. Dworzanowski

    The physical beneficiation of iron ore that has a wide particle-size distribution is problematic, regardless of the process applied, whether dense medium separation, gravity concentration, magnetic se

    Jan 1, 2014

  • NIOSH
    RI 3183 Smelting in the Lead Blast Furnace

    By G. L. Oldright, Virgil Miller

    "This paper is the tenth 4 of a series on smelting in the lead blast furnace, and the fifth 5 on modifications brought about by the introduction of richer charges.ACKNOWLEDGMENTSAll of the data on han

    Aug 1, 1932

  • CIM
    Integrated Operations for Maximizing Results

    By D. Schleiss

    Reduced access to knowledgeable workers is creating challenges for operations. We are doing more 4D Operations - dirty, dull, dangerous, and distant. Personnel costs in these environments are high, an

    Jan 1, 2014

  • NIOSH
    IC 7615 Roof Bolting And Dust Control ? Introduction

    By James Westfield

    Drilling for roof bolting has created a new dust problem for the coal-mining industry. Drilling is inherently dusty, and control of dust produced by drilling vertical or nearly vertical holes is much

    Jan 1, 1951

  • CIM
    Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper Concentrator

    By M. Massinaei, S. Abasi, M. Oliazadeh

    Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o

    Jan 1, 2019

  • AIME
    Coal - Coal Strip Mining-Is It Reaching a Peak?

    By Hubert E. Risser

    Although, for about a half-century the percentage of coal production provided through strip mining has steadily increased, recent trends indicate that a peak in percentage (not tonnage) is being appro

    Jan 1, 1970

  • IOM3
    River diversions at Aredor mine, Guinea, West Africa

    The Aredor mine employs conventional dragline methods to exploit alluvial diamond deposits. Production began in 1984 with the policy of mining in the terrraces during the wet season and in the river f

    Sep 1, 1991

  • SME
    Latin Mining - Goldcorp?s New Peñasquito Mill

    By Barry Olson

    The Peñasquito deposit in Mexico is one of the largest grassroots precious metal discoveries to be developed in recent years. Goldcorp Inc. acquired the gold-silver-lead-zinc property with the acqui

    Jan 1, 2009

  • SME
    Controlling Conveyor Dust Before it Becomes a Problem

    By Neil F. Archer

    Due to the increased chance of violations and shutdowns by the U.S Occupational Safety and Health Administration(OSHA) and the U.S. Environmental Protection Agency (EPA), a company can save itself pro

    Jan 1, 2003

  • ISEE
    Modeling of Dynamic Break in Underground Ring Blasting

    By Troy Williams, Chris Preston, Ian Lipchak

    "Underground blasting operations are challenging from the standpoint of the distribution of explosivesenergy representative of ring blasting. Energy from both shock and pressure regimes of commerciale

    Jan 1, 2016

  • AUSIMM
    High accuracy .D airborne electromagnetic inversion method for banded iron formation and other geological settings

    By D FitzGerald, S Jakica, R Paterson, J Silic

    A new 2.5D airborne electromagnetic (AEM) algorithm has been developed by Intrepid Geophysics and Jovan Silic & Associates. The advantage of 2.5D (2D geology, 3D source) AEM inversion in 3D geolog

    Jul 24, 2017

  • AUSIMM
    Skew Roof Deformation Mechanism in Longwall Gateroads ù Concepts and Consequences

    A research project was commissioned by the Australian Coal Association Research Program (ACARP) to improve the understanding of tailgate strata mechanics and to provide a more rigorous engineering bas

    Jan 1, 2005

  • AUSIMM
    Environmental Management Plans to Reduce Mine Closure Costs

    By I F. Bell, K P. Hammerschmid

    Well planned and executed environmental management plans can reduce life-of-mine operating costs and the need to deal with major environmental issues at the time of mine closure. With proper planning

    Jan 1, 1995

  • CIM
    Mucking efficiency in open pit blasting

    By J. J. Montoro

    The influence of blasting on the excavators’ efficiency, defined as mucking rate (amount of rock mucked per unit time) and mean bucket load (amount of rock loaded in each bucket operation), is investi

    Jan 1, 2007

  • SME
    Potential Development of the Underground Science City in Rock Caverns at Kent Ridge in Singapore

    By K. W. Lee, C. Pound, J. Carmody, L. Petersen, C. Nelson, J. G. Cai

    The feasibility of developing the Underground Science City below the Kent Ridge Park has been investigated. The primary aim of the study has been to explore the possibility of creating underground spa

    Jan 1, 2001

  • SME
    Electrostatic Fogging Suppresses Respirable Rock Crucher Dust

    Electrostatically charged water droplets efficiently suppress breathable dust produced during open air rock crushing operations, according to recently completed independent tests conducted for the Env

    Jan 6, 1981

  • AUSIMM
    Fault Swarms in the Greta Coal Seam, New South Wales

    By Burns K. L

    Keyboard patterns of hundreds of minor faults with vertical displacements of 3 mm to 2 m occur within the Greta coal seam and cause serious mining problems in collieries. Many of the faults are concen

    Jan 1, 1978

  • AUSIMM
    Bulk Density of Stratified Iron Ores and Its Relationship to Grade and Porosity

    By Wylie A. W, Mathew PJ

    Bulk density and grade were determined on a variety of ore samples from the Mount Tom Price iron ore mine and the interrelationship between these properties and porosity deduced.Variable porosity is r

    Jan 1, 1978