Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Advances in Remote Sensing Techniques for Monitoring Rock Falls and Slope Failures (17th CONFERENCE ON GROUND CONTROL IN MINING)By J. M. Girard
Ground control problems at surface mining operations can occur for a variety of reasons. Stress, gravity loading, rock strength, geology, pore pressure, weather effects, underground workings, and many
Jan 1, 1998
-
Tension-Torque Relationship For Mechanical Anchored Roof BoltsBy H. N. Maleki
Tension-torque relationships were investigated *n a coal mine for bath standard 5/8 in. (16 mm) bolts and a vibrating wire instrumented bolt, using conventional and controlled installation techniques.
Jan 1, 1984
-
In Situ Strength Testing of Rocks with the Borehole PenetrometerBy Kot F. von Unrug
One of the major difficulties in the proper characterization of rocks surrounding excavations is the lack of data. The existing method for strength determination requires core drilling for sample coll
Jan 1, 1998
-
Evaluation Of Low-Coal ATRS SystemsBy M. Terry Hoch
This paper presents information on low-coal ATRS systems that are now in use. A study was conducted consisting of an in-mine evaluation of ATRS- equipped roof bolters capable of bolting in seams below
Jan 1, 1988
-
Application of Stress, Geologic, and Support Design System (Sgssm) to Ground Control for Mine Slope EntriesBy John Stankus
Accurate evaluation of stress and geological conditions is critical to ground control design in underground openings. For a mine slope entry, the problem becomes more complicated because a slope trans
Jan 1, 2011
-
Ice Pillars, Packwalls, and BratticesBy David L. Kuck
This paper describes a system for providing structural, support in underground mines, employing water ice for pillars. packwalls and brattices. It consists of a refrigeration brine chiller, brine circ
Jan 1, 1987
-
Roof Control With Polyurethane For Recovery Of Kitt Energy?s 1000-Foot LongwallBy J. G. Stewart
Polyurethane injection for the consolidation and control of broken strata is a common practice in the deep mines in Europe. The technology has gained wide acceptance in the coal mines of America since
Jan 1, 1984
-
Pillarless Longwall Mining For Multiple SeamsBy Victor V. Nazimko
Longwall mining technology without interpanel pillars is feasible from a geomechanical point of view. A set of pillarless longwall layouts are proposed including tailentry pillar recovery, headentry p
Jan 1, 1994
-
An Assessment Of Rockbolting In Geologically Disturbed Mine RoadwaysBy Erdal Akyol
The rockbolting method of support is employed widely in several countries in different of mines. Hard rock mines use this method extensively. Soft rock mines, such as coal mines, have employed standin
Jan 1, 1992
-
Control Technology For Roof Drill OperatorsBy Bob Thomas
The roof drill operator productivity can be enhanced by the introduction of control technology The operators control station can be improved by considering human factors such as handle forces and cont
Jan 1, 1999
-
The Directional Drill Monitor For Long Hole Gas Drainage In Coal Mines (d6b87c76-5ad8-4cc5-b4ae-23b79c52c32b)By G. Skybey
The Directional Drill Monitor (DDM) is an advanced instrument for real time in hole surveying. It was developed by Du Pont (Australia) to suit Australian gassy coal mining conditions. The instrumen
Jan 1, 1992
-
Visualization Of Geostructure By Mechanical Data Logging Of Rockbolt Drilling And Its AccuracyBy K. Itakura
Information about geostructure for effective rock bolting must be obtained before setting the bolt into rock in a coal mine roadway. Especially, rock type variation and distribution of discontinuities
Jan 1, 2001
-
Roof Bolt Response To Shear Stress: Laboratory Analysis (01deebbf-0c9c-422b-b7e0-1ccfd8e161d8)By Ed Mchugh
Recent studies by researchers from the National Institute for Occupational Safety and Health indicate that shear loading contributes significantly to failure of bolts used for rock reinforcement in co
Jan 1, 1999
-
Successful Application Of Hydraulic Fracturing To Control Windblast Hazard At Moonee Colliery, NSW, AustraliaBy Ken Mills
This paper describes the first successful use of hydraulic fracturing to induce caving events "on demand" in Australia. Moonee Colliery operate a longwall immediately below a thick conglomerate strata
Jan 1, 2000
-
In Situ Stress For Underground Excavation Design In A Naturally Fractured Rock MassBy Andrew J. Hyett
The ISRM commission on testing methods has recently presented Suggested Methods for rock stress determination (Kim & Franklin, 1987). This proposes that even if the magnitude of in situ stress is not
Jan 1, 1989
-
Tailgate Support Practice In U.S. Longwall Mines - A SurveyBy S. S. Peng
To acquire knowledge on the general trend of primary and supplemental supports used in tailgates of US longwall mines a survey of 76 mines with 86 longwall panels was carried out in the summer of 1993
Jan 1, 1994
-
Analysis of the Effect of Rate of Extraction on Strain Development in Interaction Subsidence Data Using a Neural NetworkBy Peter Cain
In 1993 an opportunity presented to monitor the effects of undermining an abandoned roadway by a longwall panel in the Sydney. N.S. coal field. Interaction subsidence data was collected by survey leve
Jan 1, 1998
-
Microseismic Monitoring of Mountain Bumps and Bounces: A Case StudyBy J. L. Condon
The Bureau of Mines, through in-house and contract research, monitored mountain bump-prone areas of the Olga #2 Mine, near Welch, WV, using microseismic techniques for 15 months during 1985 and 1986.
Jan 1, 1987
-
Non-Destructive Testing Method for Determining the Characteristic Length and Initial Axial Bolt Load and Its ApplicationBy Houquan Zhang, Yu Wu, Yanlong Chen, Zhenfu Luo, Aihong Lu
"A non-destructive detection scheme for bolt installation quality was designed by adopting the method of non-destructive detection on bolt installation quality. Based on the field measurements, a rand
Jan 1, 2016
-
Case Study of Conditions Observed During the Removal of a Highly Fractured Roof Beam in Bedded HaliteBy Liane J. Terrill
A 9O) ft (275 meter) section of a highly fractured beam of halite was mined from the roof of a supported thirteen year old drift at the Waste Isolation Pilot Plant (WIPP). The operation was conducted
Jan 1, 1997