Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Limestone Transportation By 17-Km Cross-Border Long Belt Conveyor For Lafarge Surma Cement Limited

    By Kumar Vikram

    Rich reserve of prime quality limestone in east khasi hills of India and abundant quantity of low-cost fuel (Natural Gas) in Bangladesh made Lafarge Surma cement limited a joint venture company of Laf

    Jan 1, 2008

  • SME
    Air Sparged Hydrocyclone (Ash) Technology For Cyanide Recovery

    By B. Dabrowski, J. D. Miller, D. Halbe, J. Hupka

    An air-sparged hydrocyclone (ASH) mobile system was evaluated for continuous stripping and recovery of cyanide (the AVR process) from process water at a gold plant site. The ASH unit performed excepti

    Jan 1, 2004

  • SME
    Gold Exploration And Mining In Venezuela A Private Enterprise Approach

    By Alberto Sarmentero

    Venezuela, once a world's top gold producer until 1886 Witwatersrand discovery, did let fall its role then because of a serious lack of infrastructure and population, and lately (since World war

    Jan 1, 1989

  • SME
    Optimum Fragmentation In Underground Mining

    By Kai Nielsen

    In underground mining coarse muck and large boulders lead to ineffective utilization of costly mining equipment, and extra expenses and delays caused by secondary blasting. Cost analysis in some Norwe

    Jan 1, 1986

  • SME
    Experiment with Electric Discharge in Rock Splitting

    By R. J. Puchala, B. M. Hawrylewicz

    High voltage electrical discharge in water causes instantaneous release of accumulated energy into water. The experiment described in this paper regards the utilization of the electric discharge ph

    Jan 1, 1986

  • SME
    Testing And Evaluation Of An Engineering Noise Control On A Longwall Stageloader

    By D. Armour, E. R. Bauer, D. R. Zuchelli, T. M. Durr, E. R. Reeves

    A team of noise specialists from the National Institute for Occupational Safety and Health (NIOSH), Mine Safety and Health Administration (MSHA), and Joy Manufacturing attempted to evaluate an enginee

    Jan 1, 2005

  • SME
    Recovery Of Anthracite From Coal Preparation-Plant Tailings

    By S. Subbarayan, S. Chander, M. S. Klima

    A laboratory study was conducted to investigate the potential for recovering anthracite from coal preparation-plant tailings. The study included washability analyses, cyclone simulations and froth flo

    Jan 1, 1996

  • SME
    Mechanism Of Regrinding In Rotary Cutting Machines

    By Danqing Xu, A. W. Khair

    This paper presents an analysis of mechanism of secondary fragmentation and respirable dust generation due to regrinding. In continuous miners, the recovered coal and uncleaned coal from the previous

    Jan 1, 1991

  • SME
    South Bulga A New Generation High Capacity Mine

    By Edward Donovan, Bryan Knott, R. E. Melley, O&apos

    South Bulga Colliery, located near Singleton in the Hunter Valley region of Australia, began longwall production in late 1994. The mining conditions there are conducive to high productivity with good

    Jan 1, 1996

  • SME
    Novel Approaches for Bioremediation of Acidic, Metal-Rich Effluents Using Indigenous Bacteria

    By Marie-Antoinette Dziurla, Barrie Johnson, Åsa Kolmert

    Acidophilic bacteria are well known for their role in accelerating the oxidative dissolution of sulfide minds, such as pyrite. Other acidophiles, however, are able to catalyze dissimilatory reductive

    Jan 1, 2000

  • SME
    Rock Mechanics Research Decreases Longwall Bump Potential At A Southern Appalachian Coal Mine

    By T. M. Barton, M. Gauna, A. A. Campoli

    Coal mine bumps, the violent failures of overstressed coal, present a safety hazard to miners when longwall mining is conducted in deep, bump-prone coal mines. Two different longwall gate entry system

    Jan 1, 1993

  • SME
    Riverside Badlands Tunnel, Inland Feeder Project: The Challenges Between Concept and Completion

    By John Waggoner, Steve Klein, John Townsend, Jay Arabshahi

    The Riverside Badlands Tunnel is a 13 km (8 mile) long segment of the Inland Feeder Project. This 3.65 m (12 ft) finished diameter water tunnel presented many challenges that had to be overcome to tak

    Jan 1, 2003

  • SME
    Technology for New Coal Market

    By John M. Wootten

    The development of new coal markets is -t upon the ability to utilize coal in an environmentally acceptable and economically viable fashion. Foremost in the concerns about coal utilization is the impa

    Jan 1, 1986

  • SME
    Investigation into the Sulphide Dust Explosibility And The Influences Of Post Detonation Fumes

    By Yunsheng Yao, P. Golledge, A. D. S. Gillies

    In order to investigate the explosibility of sulphide mineral dusts, sulphide ore samples were collected from five underground metalliferous mines in Australia. The mineralogical and chemical composit

    Jan 1, 1997

  • SME
    Watershed approach to evaluating impacts of abandoned mines in the Bear Butte Creek basin of the Black Hills

    By A. D. Davis, C. J. Webb, T. V. Durkin

    This project took a watershed approach in the evaluation of water-quality impacts from past mining activities and current restoration projects in the Bear Butte Creek basin, a small and well-defined d

    Jan 1, 2000

  • SME
    Turning Crosscuts With Remote Control Continuous Miners -Improving Safety

    By Michael Gauna, William J. Gray, Joseph C. Zelanko

    Mechanized mining in the underground coal industry has continued to evolve since the introduction of the remote control mining machine. Remote control continuous mining machines without an onboard ope

    Jan 1, 2005

  • SME
    An Electrochemical Study Of Sphalerite Activation By Copper In Acid Solution

    By P. E. Richardson, N. P. Finkelstein, Z. Chen

    The large band gap and insulating properties of sphalerite have limited the application of standard electrochemical techniques for studying its reactions with flotation reagents. This problem has been

    Jan 1, 1995

  • SME
    Application of economic parameters and cutoffs during and after pit optimization

    By B. K. Baird, P. C. Satchwell

    The application of cutoffs during and after pit optimization is examined for a lower-grade multimetallic copper deposit. Pit optimization requires calculation of the net revenue associated with each m

    Jan 1, 2002

  • SME
    Deep Cut Mining Investigation - Case Study

    By Richard Stoltz, Gary Smith

    This paper presents the findings of a face ventilation investigation, conducted by the Ventilation Division, Pittsburgh Health Technology Center, at a underground coal mine operating in the Illinois N

    Jan 1, 1991

  • SME
    Commissioning and startup of the Blind River uranium refinery

    By J. M. Schisler

    In the last five years Eldorado Resources Ltd. (ERL) has undergone a major expansion and modernization of its uranium refining and conversion plants. A new refinery for processing yellow cake to UO3 w

    Jan 1, 1987