Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
MINExpo INTERNATIONAL 2000 Largest Ever HeldBy Tim O’Neil
The search for precious metals opened up the American West. And Nevada was right in the heart of this development. In the mid-19th century, prospectors seeking gold roamed the hills of Nevada and di
Jan 1, 2000
-
Boddington Gold Mine Moves Closer To ProductionConstruction of the Boddington Mine 130 km (81 miles) southeast of Perth, is about 89 percent complete. When the $2.9-billion development is finished, it will be the largest gold mine in Australia, pr
Jan 1, 2009
-
Centrifuge dewatering and reconstitution of fine coal: A pilot-plant application of the GranuFlow ProcessBy R. P. Killmeyer, W. W. Wen, B. K. Parekh
A continuous pilot-scale test of the GranuFlow Process was conducted using a screen-bowl centrifuge for the dewatering and reconstitution of column -flotation concentrate at a coal preparation plant i
Jan 1, 2000
-
Port Authority Of Alleghany County North Shore Connector Project Tunnels And Station Shell Case History Contracts 003 And 006By Paul Zick
The Port Authority of Allegheny County North Shore Connector (NSC) Project involves TBM excavation of twin 690 m (2,240 lf) precast segment lined light rail tunnels through soil and rock under the All
-
Shaft Sinking on the MetroWest Water Supply Tunnel ProjectBy A. J. Stewart, M. Guay, J. W. Critchfield, A. P. Hoddeson
The MetroWest Water Supply Tunnel project includes three main work shafts, excavated primarily in rock. Shaft L is 9.8 m (32 ft) diameter and 124.1 m (407 ft)deep. Shaft E is 7.0 by 12.8 m (23 by 42 f
Jan 1, 1999
-
Technical innovations spur resurgence of copper solution miningBy J. B. Hiskey
Introduction The domestic copper industry has suffered for some time from declining ore grades; rising costs associated with conventional mining, milling, smelting and refining; tightening environm
Jan 11, 1986
-
Annual Review 1992 – Exploration 1992Worldwide minerals exploration slipped in 1992 from 1991 levels. Although industrial production figures showed the US economy emerging from recession in early 1992, it was not until February 1993 that
Jan 1, 1993
-
Geologists Add Value at Newmont’s Nevada Mines – Part TwoBy Wayne Trudel, Eric Saderhold, Lloyd McEvers, Lori Clarke, Charles Lynn Bolin, Leroy Schutz
Editor’s note: This is the second part of a two-part series on how mine geologists added about 141t (4.53 million oz) at Newmont Mining’s gold operations in Nevada during 2003. Part one (ME, July2004
Jan 1, 2004
-
Construction Control Instrumentation Used During Tunnel EnlargementBy Raymond P. Miller, David L. Monson, Robert A. Robinson
A geotechnical instrumentation program consisting of borehole extensometers and portable tape extensometer stations was effectively used to monitor concrete liner deformations and guide construction p
Jan 1, 1976
-
3D CFD Simulation Of Airflow Re-Distribution And Associated Pressure Drops Inside The Overcast In Underground Coal MinesOvercasts are indispensible ventilation control devices to permit one airway to pass over another without mixing in room and pillar coal mining. The airflow distribution inside the overcast depends on
Feb 27, 2013
-
Lyon–Turin Long and Deep Railway Tunnel ProjectBy P. Fauvel, V. Nasri
In January 2001, French and Italian governments signed an agreement for the construction of a new Lyon-Turin railway line. This project includes a tunnel of 53.1 km length and a maximum of 2500 m over
Jan 1, 2005
-
Underground Mega Mass Blasting With Electronic Initiation Near Urban Area (fc2c255c-164d-4629-975a-222d3dbec279)By J. -F. Lagueux
Goldex Mine is an underground mine located near the town of Val-d?Or. Multiple innovations were required to work the mine. Due to its low grade, it was important to develop a bulk mining method to ec
Jan 1, 2011
-
Preliminary Rib Support Requirements for Solid Coal Ribs Using A Coal Pillar Rib RatingResearchers from the National Institute for Occupational Safety and Health (NIOSH) are developing a coal pillar rib rating (CPRR) technique to measure the integrity of coal ribs. The CPRR characterize
Jan 7, 2020
-
Glenbrook Nickel – Can New Caledonian Ore Save the Only US Nickel Producer?By Kerry Spickelmier
The only nickel smelter and the only active nickel mine in the United States is Glenbrook Nickel Co., a joint venture (50% each) of Cominco Resources International Ltd. and Cominco Ltd. In 1989, with
Jan 1, 1993
-
Discussion - Performance evaluation of indicator kriging in a gold depositBy Y. C. Kim, I. S. Roditis, P. K. Medhi
P. Mousset-Jones I found the article most interesting and timely. I consider it imperative that mine case studies like this one are undertaken and published so that the practicing mining engineer and
Jan 3, 1988
-
Reserve’s Process Modifications Succeed at Silver BayBy Charles L. Allie
Since Reserve Mining Co. began commercial operations at Silver Bay, MN, some 25 years ago, major improvements in taconite processing technology have become available. In addition, significant new gove
Jan 12, 1980
-
Comparison Of Mine Ventilation Simulation SoftwareVentilation network modeling in mine planning dates back at least three decades, but it is not widely accepted and/or practiced until the last decade, thanks to the advent of modern computers with the
Jan 1, 2012
-
Significant Developments In Dry Rare-Earth Magnetic Separation - Preprint 09-004By M. Dobbins
The advent of the more efficient and effective rare-earth roll (RER) separator in the early 1980?s began a new era of dry magnetic separation. The RER units quickly became the separator of choice with
Jan 1, 2009
-
Dewatering, Interpretation Of Landform, And Installation Of Steel Arches For Reinforcement Of Tunnel SectionBy D. J. Gilbert
As a preventive action, the geotechnical department at the mine analyzed the original topography overlying a conveyor tunnel at the mine. Several dewatering drains were installed to intercept water co
Jan 1, 2011
-
Portland, Oregon’s Other CSO TunnelsBy Michelle Lostra, Red Blanchette, Jan Babendererde, Greg Colzani
The City of Portland’s Westside CSO Project is constructing a deep tunnel system to reduce combined sewer overflows (CSO) from entering the Willamette River. Several kilometers of microtunneled pipeli
Jan 1, 2005