Investigation Of In-Pit Ore-Waste Selection Procedures Using Conditionally Simulated OrebodiesBy Y. C. Kim
For the past few years, the Cyprus Bagdad Copper Company began experiencing a significant "ore-dilution" problem from its low grade open- pit copper mine located at Bagdad, Arizona. To pinpoint the ca
Jan 1, 1982
-
Direct acid elution of anionic exchange resins for uranium recoveryBy T. Y. Yan
An effective elution technique has been developed for recovering uranium from ion exchange resins loaded in the carbonate leaching process. The procedure employs direct elution with acid. In compariso
Jan 1, 1987
-
Characteristic Curves For Multiple-Fan Ventilation SystemsBy Y. J. Wang
A subsystem-based approach to the characteristic curves for a multiple fan ventilation system is presented. The ventilation variables and their relationships associated with a fan branch are considere
Jan 1, 1993
-
A Computer Solution To The Queuing Problem At A Mine-Mill Interface ? IntroductionBy Y. L. Su
This paper describes a case study where solutions were sought to the truck queuing that occurred at a central processing plant. Ore from three production shafts at Falconbridge Limited's Sudbu
Jan 1, 1986
-
3.3 Open-Pit Limits Analysis - 1. Technical OverviewBy Y. C. Kim
One aspect of long-range mine planning in an open-pit mine is first to define the ultimate pit limit, i.e., the projected size and shape of the pit at the end of its life. This chapter is concerned wi
Jan 1, 1979
-
Application Of Fuzzy Set Theory In The Evaluation Of Roof Categories In Longwall Mining (TECHNICAL PAPERS)By Y. M. Jiang
Longwall faces can move at high advancing rates, but many geological variations can cause unexpected instabilities and production losses. The rapid movement makes it necessary to evaluate different ge
Jan 1, 1997
-
Optimum Open Pit Production Sequencing-The Current State Of The ArtBy Y. C. Kim
For the past quarter of century, much more effort and research have been expended in developing the "optimum" ultimate pit limit design algorithms and much less to solving the "optimum" open pit produ
Jan 1, 1994
-
Predicting In-Situ Rock Fracture Parameters Using Soft KrigingBy Y. C. Kim
Three rock fracture parameters define three points along empirical cumulative size (of rock fragments) distribution curves at Inspiration copper mine. These parameters are: rock quality designation (R
Jan 1, 1989
-
Implementation of blast hole kriging on a personal computerBy Y. C. Kim
This paper describes the implementational aspects of a blast hole kriging system that has been developedfor the purpose of daily ore/waste control in an open pit mine. The primary goal of blast hole k
Jan 1, 1991
-
Modeling Mine Ventilation Networks Using Five Basic Network Elements (5843f700-ff56-4c8e-8ba9-f482c16a27b9)By Y. J. Wang
In the, mathematical analysis of electrical networks, the electrical devices are often modeled using idealized network elements such as current sources, voltage sources and resistors. An analogous app
Jan 1, 1997
-
The Overlap Problem In On-Line Coarse Particle Size Measurement -Segmentation And TransformationBy Y. K. Yen
The most serious problem for on-line coarse particle size measurement from a conveyor belt by image analysis is the overlap phenomenon that occurs between adjacent particles. A methodology is develope
Jan 1, 1994
-
A Methodology To Determine In Situ Rock Mass FailureBy K. Y. Haramy
A scale-invariant theory of the strength and deformability of rock masses in static equilibrium and at incipient failure is proposed. The theory provides a rationale for designing structures in rock.
Jan 1, 1995
-
Main-Roof Failure Modes And Their Effects On Longwall ShieldsBy Y. M. Jiang
From underground instrumentation data and from direct observation of longwall panels, it was demonstrated that growth of the main-roof overhang causes an extremely high roof weighting on the face supp
Jan 1, 1996
-
Characteristic Curves For The Series-Parallel Ventilation Network With Multiple FansBy Y. J. Wang
The concept of subsystem characteristic curves for multiple-fan ventilation networks is presented through the construction of characteristic curves for two-fan, series-parallel networks. By considerin
Jan 1, 1994
-
Incorporating Blast Hole Data In The Development Of A Computer Block Model In An Active MineBy Y. S. Roditis
A new method for interpolating a block model is proposed, where both the diamond drill holes (DHs) and blast holes (BHs) data are used. Combining these data types poses a geostatistical "class size" p
Jan 1, 1992
-
A New Approach For Production Scheduling In Open-Pit MinesBy Y. G. Zhang
Interactive Dynamic Optimization Method (IDOM) will be presented in this paper. IDOM combines inventory theory, dynamic programming, computer simulation and interactive technique to formulate a produc
Jan 1, 1986
-
Analysis Of Controlled District Recirculation SystemsBy Y. J. Wang
The use of controlled recirculation began in the early 1930s. Although this method has been applied in many mines since then, a generalized comprehensive network analysis is still lacking. This paper
Jan 1, 1997
-
Introductory Review - Mine Systems Analysis and DesignBy Y. J. Wang
Along with the inexpensive availability of computing hardware, a proliferation of powerful personal computers is being realized throughout the mining industry. People from every arena within the indus
Jan 1, 1989
-
The Impact Of Classification On The Flotation Of Waste Phosphate SlimesBy Y. Q. Lu
Efficient flotation of fine phosphate minerals from a deslimed waste phosphate stream (-74 microns) has been achieved by both bench-scale flotation and by flotation with a 2-inch air-sparged hydrocycl
Jan 1, 1995
-
Solving Mine Ventilation Networks With Fixed And Nonfixed Operating PointsBy Y. J. Wang
The ventilation network problem, having both fixed and nonfixed operating points as control devices, is examined in this paper. Emphasizing the concept of solving a system of n equations in n unknowns