Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Statistical Assessment Of Scale Effect On Rock Properties Using The Theory Of Extremes (a88bd68b-1039-4f02-9939-cf8b1021a976)

    By T. M. Yegulalp

    A new explanation of the scale dependency of the strength properties of rock is presented based on the theory of extremes. A review of past work on specimen size strength relationship is followed by a

    Jan 1, 1992

  • SME
    Open Pit Mining And Concentrating Of Spodumene From North Carolina Pegmatities

    By Frederick A. Subosits

    The Lithium Corporation of America's Hallman-Beam spodumene-pegmatite open pit mine is located in the Kings Mountain area of North Carolina. Figure 1. Presently this area of North Carolina is the

    Jan 1, 1978

  • SME
    Industrial Minerals Review 2010

    By R. L. Virta

    Ball Clay -- Four companies - H.C. Spinks Clay Co. Inc. (owned by Lhoist Group), Imerys Group (formerly Kentucky-Tennessee Clay Co.), Old Hickory Clay Co. and Unimin Corp. - mined ball clay in four st

    Jan 1, 2011

  • SME
    Testing For Autogenous And Semi-Autogenous Grinding - A Designer's Point Of View ? Introduction

    By D. J. Barratt

    The application of autogenous and semi-autogenous grinding circuits in recent years has contributed toward substantial savings in capital and operating costs compared to conventional circuits, particu

    Jan 1, 1985

  • SME
    LED Area Lighting to Reduce Glare for Roof Bolter Operators Mining, Metallurgy and Exploration

    By John J. Sammarco, Alan G. Mayton, Elaine N. Rubinstein

    Researchers from the National Institute for Occupational Safety and Health (NIOSH) developed a light-emitting diode (LED) area luminaire called the Saturn and conducted a laboratory study using a Flet

  • SME
    Selection Of A Grinding Circuit - Case Study ? Introduction

    By D. W. Cooper

    The AMAX of Canada Limited Kitsault mine is located approximately 150 kilometers, by air, north of Prince Rupert, British Columbia at the head end of A1 ice Arm, just east of the southern tip of the A

    Jan 1, 1982

  • SME
    Monitoring Reclaimed Mine Land For Stray CO2 Hazards

    By M. Moagabo

    CO2 emissions from carbonate laden reclaimed mine spoil has been shown to pose a hazard to residents in homes built on or adjacent to such land. The objective of this project was to develop a soil CO2

    Jan 1, 2012

  • SME
    Improvements In Copper/Lead Separation With Activated Carbon (cda83d32-ab8b-441a-bc6d-9412a16e7289)

    By John A. Meech

    In many multiple-sulphide ore flotation processes, it is desirable to concentrate each of the various valuable minerals into separate products. Although there are a variety of techniques and chemicals

    Jan 1, 1977

  • SME
    EPB Tunnel Boring Machine Design For Boulder Conditions

    By Craig Bournes, David Chapman, Michael DiPonio

    Historically, boulders are a frequent source of problems in soft ground tunneling. During tunnel construction, the need to manually break and remove boulders as obstructions causes delays to the proje

    Jan 1, 2007

  • SME
    Design Methodology, Testing And Evaluation Of A Continuous Miner Cutterhead For Dust Reduction In Underground Coal Mining

    By B. Asbury, M. Cigla, C. Balci

    The Western Mining Resource Center (WMRC) at the Colorado School of Mines (CSM) received a grant from the National Institute for Occupational Safety and Health (NIOSH) to perform a study that will hel

    Jan 1, 2002

  • SME
    Lead Contamination At Old Smelter Sites In The West: The Socorro, New Mexico, Case History

    By G. S. Austin

    Soil next to an abandoned smelter near Socorro, New Mexico, has the highest Pb concentration in the clay-size fraction, although this fraction accounted for only 1 to 3 wt. % of the soil. The depth of

    Jan 1, 1992

  • SME
    The use of waste material in underground coal mines - SME Transactions 2010

    By R. Brown, A. J. S. Spearing, M. Treinen, M. Theisinger

    The mining and use of coal creates a significant amount of waste material that needs to be safely disposed of. It is likely that in the medium term, the Environmental Protection Agency (EPA) in the U.

    Jan 1, 2010

  • SME
    Horizontal Chemical Grouting Beneath the Hollywood Freeway, Los Angeles Metrorail C-311

    By Michael F. Roach, Joseph K. Cavey, Gary E. Taylor

    A rigorous horizontal drilling and chemical grouting program was specified beneath the Hollywood Freeway (U.S. Route 101) section of Los Angeles Metrorail Contract C-311.Twin 6.67-m (22-ft.) diameter

    Jan 1, 1997

  • SME
    The History Of Forced Aeration In Copper Sulfide Leaching

    By W. J. Schlitt

    The development of forced aeration as an approach to enhancing copper sulfide leaching is traced from its earliest development up to present day operations using this technology. Both large-scale fie

    Jan 1, 2006

  • SME
    Production Operations

    By Lee W. Saperstien

    At the heart of the mining process are a number of basic and fundamental tasks whose regular and repeated performance constitute the mining cycle. As will be discussed presently, these tasks are the b

    Jan 1, 2008

  • SME
    Completion And Commissioning Of The SMART Dual-Purpose Tunnel ? Introduction

    By Arthur Darby

    The city of Kuala Lumpur was founded in 1857 by miners seeking tin near the confluence of the Klang and Gombak rivers. The rapid development of the city and surrounding area since independence has led

    Jan 1, 2008

  • SME
    La Ciénega – A New Gold Mine in Mexico

    By F. Grajales Muñoz

    The Ciénega project, now under construction by Peñoles group, is located in the mountains of northwest Durango, Mexico. The gold and silver deposits are found in a 4-km (2.5mile) long system of veins.

    Jan 1, 1994

  • SME
    Application Of A Computer Simulation Model To A Contour - Area Mines

    By L. Barry Phelps

    The application of an open-pit Materials Handling Simulator (OPMHS) to analyze mine planning and scheduling problems in large surface mines is discussed. The mine chosen for this application employed

    Jan 1, 1978

  • SME
    A Critical Path Approach To Mine Ventilation Networks With Controlled Flow

    By Y. J. Wang

    A critical path approach is presented for the problem of mine ventilation net- works where regulators and fans are employed to control the airflow distribution which is preassigned. The problem is a c

    Jan 1, 1981

  • SME
    Tunneling Under Glaciers Galore Creek Mine Access Tunnel, BC, Canada

    By Dean Brox, Jason Morrison, Peter Procter

    The Galore Creek Mine project is one of the newest major mining projects underdevelopment in Canada. The project is located in a very remote area of northwester British Columbia and is being developed

    Jan 1, 2007