    Problems in reclaiming stripped mined tundra lands on the North Slope, Alaska

    By D. R. Maneval

    The vast coal resources of North Slope, Alaska, can be expected to attract substantial interest because the nearly flat-lying coal beds of the coastal plain are specially amenable to surface mining. M

    Jan 1, 1987

  • SME
    Semiautogenous Ball Mill Crushing Circuit at Inco’s Clarabelle Mill

    By Tom McDonald

    Test work and plant operation confirmed that semiautogenous (SAG) milling is a viable option for Inco's milling rationalization project at Sudbury only if pebble crushing is included. Throughput

    Jan 1, 1992

  • SME
    Spinel As An Internal X-Ray Standard For Samples Of Variable Mineralogy

    By Alice Blount, F. Patrick Carr

    The quantitative evaluation,of quartz and other minerals in acid-insoluble residues from carbonate rocks and other industrial mineral products derived from sedimentary and low-grade metamorphic rocks

    Jan 1, 1991

  • SME
    Tunnel Destruction:State Of The Art

    By Charles E. Joachim

    Current Army tunnel destruction criteria (1) are based on limited nuclear-explosive (NE) and high-explosive (HE) test data. The PILE DRIVER (2) and HARDHAT (3) events investigated tunnel and support s

    Jan 1, 1979

  • SME
    Nast Tunnel Excavation History

    By Dewey W. Geary

    Nast Tunnel is the first granitic rock tunnel to be excavated by a machine for the U. S. Bureau of Reclamation. The machine has excavated 7500 ft of the tunnel at this writing. There have been a few g

    Jan 1, 1997

  • SME
    Two Underground Hydroelectric Power Plants In East Africa

    By Gunnar Sparrman, Börje Ahlgren, Sten Rosenström

    Starting in 1967 two major hydroelectric power projects have been implemented in East Africa viz. Kafue Gorge in Zambia and Great Ruaha in Tanzania. The two projects have similar characteristics and e

    Jan 1, 1979

  • SME
    Carbon Dioxide Problems In Compressed Air Tunneling

    By John T. Gormley, Pressley L. Campbell, Harry L. Crouse

    INTRODUCTION This paper summarizes an investigation conducted to determine the relationship, if any, between reported occurrences of abnormal levels of carbon dioxide (C02) gas and the construction

    Jan 1, 1979

  • SME
    Hardgrove Grindability Study Of Powder River Basin And Appalachian Coal Components In A Midwestern Power Station Blend

    By P. L. Padgett, J. C. Hower

    Five coals blended at a Midwestern United States power station were subjected to detailed analysis of their Hardgrove grindability. The coals, representing four distinct coal beds, are a low-sulfur, h

    Jan 1, 1998

  • SME
    Development And Test Of A New Emission Control System Approved For Use In German Coal Mimes

    By Jörg Weidemann, Peter W. Kuchar, Paul Burgwinkel

    The West German Ruhrkohle AG and the engineering company BEDIA have developed an emission control system for diesel engines that is suitable for use in underground coal mining, consisting of a granula

    Jan 1, 1989

  • SME
    Mine Panel Failure-A Case Study (55c93e4a-a415-4c79-98cf-200bcc20cd84)

    By K. Morsy, S. S. Peng

    This paper deals with the causes and mechanisms of massive pillar failure in a room-and-pillar mine that employed nine-entry panel system using supersection technique under a cover ranging from 91 to

    Jan 1, 2000

  • SME
    A Model For Long Range Scheduling Of The Mining Sequence For Flat Lying Orebodies

    By R. Gerling

    A computer program has been developed for finding a near-optimum schedule of the mining sequence for flat lying, tabular orebodies. The deposit is divided in blocks with equal areas and definite grade

    Jan 1, 1986

  • SME
    Simulation and Animation of the Materials Handling for a Working Smelter

    By Thomas Fliess, Klaus-Christof Ritter, John R. Sturgul

    The optimum flow of materials through a smelter is an extremely important phase of the mining cycle. A typical copper smelter will have up to $US 1,000,000 per day of copper being processed. The motio

    Jan 1, 1996

  • SME
    A Comparison Of The Performance Of Impactors And Gravimetric Dust Samplers In Mine Airflow Conditions

    By R. V. Ramani, R. Bhaskar

    While the National Academy of Sciences has stated that gravimetric sampling technology for compliance purposes is adequate, research into various aspects of respirable dust control require data on man

    Jan 1, 1987

  • SME
    Temporary Tunnel Support By Precast Segments

    By Werner A. Ruemmele, Steven R. Wardwell

    INTRODUCTION The first phase of the Los Angeles Metro Rail Project consists of 7.1 km (4.4 miles) of subway and stations running through downtown Los Angeles from Union Station to MacArthur Park. S

    Jan 1, 1989

  • SME
    A Method to Evaluate the Effectiveness of Coal Fire Extinguishing Agents

    By Charles P. Lazzara, Alex C. Smith, Mark W. Ryan

    The U.S. Bureau of Mines developed an experimental method to evaluate the relative effectiveness of water additives on the extinguishment of coal fires. The experiments were conducted in the fire zone

    Jan 1, 1992

  • SME
    Surface Chemical Characteristics and Adsorption Properties of Calcite as One of the Gangue Minerals of Phosphate Ores

    By P. Somasundaran, S. E. El-Mofty

    A comparison of the IMC Anionic Process and the CLDRI Process, based on pilot plant testing of waste pebble by Jacobs Engineering is presented. Estimated costs for constructing and operating a benefic

    Jan 1, 2002

  • SME
    Quantitative Vibration Evaluation Of Modified Rock Drill Handles

    By T. N. Moore, E. M. De Souza

    Vibratory hand-tools can produce Hand Arm Vibration (HAV) Syndrome in their operators. This disease, often called Vibration White Finger, can cause varying levels of hand-arm discomfort and, in severe

    Jan 1, 1992

  • SME
    Stability Problems Caused By Seams And Faults

    By T. L. Brekke, T. R. Howard

    Stability of an underground opening can be defined in several ways. To geologists and engineers that are used to working in geological environments where the major parts of the works after careful sca

    Jan 1, 1997

  • SME
    Hiring Recent College Graduates Versus Hiring Experienced Mining Engineers

    By John Wilson

    HARRY HINDS: Our first speaker today is Dr. John Wilson. Dr. Wilson is chair and Union Pacific/Rocky Mountain Energy Professor in mining engineering at the University of Missouri-Rolla. He has previou

    Jan 1, 1998

  • SME
    Separation Of Metals From Waste Incineration Residue By Application Of Mineral Processing

    By G. Schmelzer

    The disposal and reintroduction into recycling of residues produced by today's industrial society is not only a problem of much public debate in the countries concerned but also an increasingly p