Field Test Of An Alternative Approach To Electric Motor Predictive Maintenance; Design And ImplementationBy G. T. Homce
Most electric motor predictive maintenance methods have drawbacks that limit their effectiveness in the mining environment. The U.S. Bureau of Mines is developing an alternative approach to detect win
Jan 1, 1994
-
Advancing CO2 Scrubber Chemistries used in Respiratory Protective Devices and Refuge AlternativesBy D. Murray
"The Mine Improvement and New Emergency Response (MINER) Act included the need for improved chemical technologies to address respiratory protective device inadequacies and refuge alternative developme
Jan 1, 2018
-
Fire Obstruction By Steel Stoppings?In A Simulated EntrywayBy L. D. Savage
Several experiments were conducted using a large crib fire adjacent to a Kennedy Metal Products steel stopping in a simulated cross cut to evaluate the proposed mechanisms by which a mine fire would b
Jan 1, 1996
-
Economico-Mathematical Analysis Of Transition From Open-Pit To Underground MiningShallow ore deposits are mined by surface methods but a depth is reached in the case of most deposits after which underground methods are applied for the extraction of the remaining ore. The determina
Jan 1, 2010
-
The Evolution Of Drill Bit And Chuck Isolators To Reduce Roof Bolting Machine Drilling NoiseBy R. Michael
Among underground coal miners, hearing loss remains one of the most common occupational illnesses. In response, the National Institute for Occupational Safety and Health (NIOSH) conducts research to r
Jan 1, 2010
-
Estimating Tunneling Costs Using An Interactive Computer ModelBy William E. Little, William R. Sharp, Edward R. Kennedy
Cost o f mechanical tunneling requires the knowledge of many machine/rock parameters such as rock types, machine power, penetration rate, cutter life, maintenance schedule, etc. Capital investment, la
Jan 1, 1983
-
Sinking The Silver ShaftBy Bruce A. McKinstry
For many major mining projects the time frame from initial planning to production can be measured in terms of decades. Hecla's Silver Shaft project, which is scheduled to go into production by th
Jan 1, 1983
-
Conveyor Problems Associated With Short Acceleration TimesBy David D. Gallagher, Edmond J. O’Donovan
It has been well accepted for many decades that hard starting of conveyors has associated problems. It is particularity damaging to the belt and splices. Recent measurements of hard starts on a long c
Jan 1, 1998
-
Design Problems For Underground Nuclear Waste Disposal In BasaltBy Birger Schmidt
The design of underground nuclear waste disposal facilities poses new problems related to the requirement of long term safety against radionuclide migration. The degree and effects of rock disturbance
Jan 1, 1981
-
Subsurface Investigations Utilizing Large Diameter Borings For The Price Road Drain TunnelBy Gary S. Brierley, Ronald E. Romley, Alan L. Howard
The Price Road Drain Tunnel in Tempe, Arizona is part of the drainage system constructed in conjunction with the Outer Loop Highway in metropolitan Phoenix. The Outer Loop Project is a part of a much
Jan 1, 1991
-
Construction Difficulty Index For Tunnel ConstructionBy Sigmund J. Sulinski
The following is a progress report on a continuing study being made by the Sanitary District for purposes of developing reliable data for predicting costs and progress on future tunnel contracts. All
Jan 1, 1997
-
Introduction (8330e5d0-0433-45d7-a3a9-b515b3d0cc95)At periodic intervals-typically at the end of each month, quarter, and year- the accounting department in each division of a company distributes a set of reports to the division's managers. These
Jan 1, 1999
-
Geotechnical Performance Of A Large Machine-Bored Precast Concrete Lined TunnelBy Edwin A. Blackey, Joseph G. Engels, James T. Cahill
An extensive geotechnical instrumentation program was undertaken during the construction of a 6.7 m (22 ft) inside diameter tunnel to monitor the ground-structure response and to check assumptions mad
Jan 1, 1981
-
The Alternative Storage System ? ?Eurosilo? - SummaryBy Peter Hall
The need for large volume covered storage has increased drastically in the last ten years. Increased world demand for such products as thermal coal, potash, metallic concentrates, etc., availability o
Jan 1, 1982
-
State Of The Art Of Soft-Ground TunnelingBy A. J. Hendron, B. Mohraz, R. B. Peck
INTRODUCTION The state of the art of soft-ground tunneling was discussed in detail by the senior author at the 7th International Conference on Soil Mechanics and Foundation Engineering held in Mexi
Jan 1, 1997
-
Developments in Mine Waste Biotreatment ProcessesThe development of economical and effective treatment processes for solid and aqueous waste is a critical issue facing the mining industry today. Cyanide, nitrates and acid rock drainage are environme
Jan 1, 1992
-
Optimization of thickener performanceBy W. E. Foreman, A. Hayatdavoudi, A. Ghalambor
The objective of this investigation was to determine the sensitivity of three selected input parameters in the operational control of continuous bottom fed thickeners used for the treatment of coal re
Jan 1, 1991
-
Simulation As A Tunneling Research And Project Planning ToolBy Martha McJunkin, Lawrence Pietrzak
This paper describes and demonstrates the application of systems analysis and mathematical modeling techniques in the planning of actual tunnel projects and research and development to improve tunneli
Jan 1, 1974
-
Underrcutting - A Unique Method To Bore Non-Circular OpeningsBy Pieter Barendsen
INTRODUCTION One of the main problems in tunneling without the use of explosives lies in the development of tools which, at an economically acceptable level, are capable of continuous breakage of t
Jan 1, 1997
-
Bulyanhulu Mine: Blended Paste Backfill and Surface Paste Deposition / The State of the Art in Paste TechnologyBy John Frostiak, Don Welch, David Landriault
The use of paste technology for underground cemented backfill is widely accepted in the mining industry today as a potentially cost effective alternative to cemented rock and hydraulic slurry fill. Wh
Jan 1, 2001