Evaluation Of Methods For Controlling Silica Dust Exposures On Roof BoltersBy J. A. Organiscak
This paper examines methods for limiting occupational silica exposures for roof-bolting personnel in underground coal mining. A canopy air curtain and an air tube were evaluated as means to provide fi
Jan 1, 2003
-
Sag Mill Pulp Lifter Design, Discharge And BackflowBy David Royston
Conventional straight-radial SAG mill pulp lifters suffer from incomplete discharge of the rock portion of the charge. The resulting backflow of undischarged rock limits pulp lifter performance and is
Jan 1, 2005
-
Surface Response Method In The Optimization Study Of A Multi-Gravity Separator: Concentration Of Chromite FinesBy A. Marabini, G. Belardi, N. Sheau, F. Veglio
The present paper deals with the modelling of a Multi-gravity separator in the treatment of chromite fines. A first screening study was carried out by 2" full-factorial experiments in order to check t
Jan 1, 1995
-
History and Use of Expert Control Systems in Minerals ProcessingBy Lynn B. Hales, Randy A. Ynchausti
Because of the high economic value associated with small improvements in the operating performance of mineral processing plants, innovations in instrumentation, stabilization and expert control system
Jan 1, 2000
-
The Use of an In-Situ Porous Reactive Wall to Remediate a Heavy Metal PlumeBy Rick McGregor, David Blowes, Mike Choi, Ralph Ludwig
The oxidation of sulfide minerals at an ore transfer location in Western Canada has resulted in widespread contamination of underlying soil and groundwater. The oxidation of sulfide minerals has relea
Jan 1, 2000
-
Adapting the intelligent decision system to variable mining conditionsBy R. H. King, R. E. Cameron
Mine managers need better information to locate new opportunities and then to assess the effect of their decisions. We are developing the Intelligent Decision Support System (IDSS) and its two major m
Jan 1, 1991
-
New Methods For In-Situ Remediation Of Metals-Contaminated GroundwaterBy H. Kempton
New methods for remediating metals-contaminated groundwater include in-situ emplacement of highly adsorptive substrates to permanently retard solutes. Substrates are introduced by sequential injection
Jan 1, 1999
-
2. Maintenance Information Systems - Maintenance Philosophy - Overview Of Goals And Objectives - Primary Goals And ObjectivesThe primary goal of a maintenance information system should be to aid the maintenance department in providing the required equipment or plant availability at the lowest possible cost. To achieve this
Jan 1, 1979
-
A Numerical Simulation Of The Effects Of Swelling On Concrete Settlement Tanks Founded On Swelling ClayBy Ch. Arvanitidis
This paper presents the design solution for an actual case of settlement tanks, for a wastewater treatment plant under construction, actually founded on swelling clay (the nature of which had not been
Jan 1, 2005
-
Experimental studies on dust dispersion in mine airways (b67fb167-a13b-4d4a-8ba4-f1001ddc30a7)By R. V. Ramani, R. A. Jankowski, R. Bhaskar
The spatial distribution of airborne dusts, deposition of dust in the airway, as well as the effect of airflow velocity and particle density on dust behavior in mine airways were studied in a set of e
Jan 1, 1987
-
Prelimary Evaluation of a Computer Vision Sensor for Analysis of Phosphate TailingsBy K. C. Kane, D. L. Meredith, B. E. Davis, D. A. Stanley, O&apos
Computer control of the minerals beneficiation process is limited by a lack of adequate sensors to provide information on the current state of the process. Recent reduction in the cost of image acquis
Jan 1, 1990
-
Permeable Reactive Barrier Installation With High Velocity WaterjetBy R. Ciccu
Permeable reactive barriers (PRB) are one of the most promising systems for groundwater remediation. PRB are constructed with the purpose to intercept the contaminated flow and to degrade it as a big
Jan 1, 2008
-
51. Discovery of the Olympic Dam Copper-Uranium-Gold-Silver DepositBy J. H. Lalor
The Olympic Dam deposit was discovered in July 1975 with the intersection of 38 m (125 ft) of 1.05% copper in diamond drill hole RD 1. A further eight holes were drilled with only marginal encourageme
Jan 1, 1991
-
The Reactivity of Sulphur-Rich Sediments in Lake Junin, Peru: The Importance of Permanent SubmergenceBy Thomas F. Pedersen, J. Jay McNee, Alan J. Martin
Field sampling was conducted in Lake Junin, Peru in order to assess the post-depositional reactivity of the highly contaminated lake sediments. High resolution profiles of dissolved Fe, Mn, SO42- and
Jan 1, 2000
-
Effect Of Foam Surfactants On Quartz And Dust Levels In Continuous Miner SectionsBy R. Gong, R. Bhaskar
A coal mine study was conducted to evaluate the effectiveness of a compressed-air, foam spray system installed under a continuous miner boom and directed to cover the pan and the gathering arm. The st
Jan 1, 1993
-
Current Methods Of Objective Ground Assessment For Underground ConstructionBy Graham E. Rawlings
Geotechnical investigations for underground projects are subject to a variety of constraints, including factors such as accessibility, geological complexity, thickness of oberburden and finance. As a
Jan 1, 1983
-
Leaching behavior of palladium in ammoniacal solutions with oxygenBy K. N. Han
The leaching behavior of palladium in ammoniacal solutions was investigated by using the rotating-disk technique in an autoclave. The study included the effects of rotation speed, temperature, oxygen
Jan 1, 1999
-
Measurement And Simulation Of Face Ventilation Effectiveness For Large Diesel Powered Equipment (3a087281-c2fc-4d07-aec1-494daa617bd2)By Carl E. Brechtel, Edward D. Thimons
Providing adequate airflow to effectively dilute and remove diesel pollutants in large mine working headings is a little researched area. A simulated diesel mucking operation was carried out in the Ex
Jan 1, 1987
-
Design And Manufacture of Conveyor Pulley Assemblies for Drummond Coal Shoal Creek Slope BeltBy Rick Sarkisian, Albert D. Bonneau, David Keech
The Drummond Co. Inc.'s Shoal Creek Coal Mine Slope Belt Conveyor transports 5000 mtph (5500 tph) of material over a length of 1400 m (4600 ft.) and a lift of 3609 m (1180 ft.). Four 1500 kW (200
Jan 1, 1996
-
Optimization Of The Autogenous Grinding In "Cascade" Mill At Iron Ores ProcessingBy Alexandr A. Abramov, Svetlana M. Angelova, Oleg P. Maljuk
In this paper the effect of the ratio of grinding and grindable size classes (ore lumps, particles and grains) and the guantity of intermediate size classes in the feed of the primary wet autogenous g
Jan 1, 1995