Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    A Maximum Instantaneous Charge Map for Environmental Protection in Rock Blasting at the Serra Sul Mine (S11D)

    By Raúl Carretero de la Hoz, Leonardo Soares Chaves, João Paulo Soares Toneli, Francisco Felipe da Silva Dantas, Marcos Peres Lopes, Marcus Vinicius da Silva Gonçalves

    The mining activity results in environmental impact and thus requires the adoption of techniques to minimize its effects. The rock blasting process is required to break up and move the rock enabling t

    Jan 21, 2025

  • ISEE
    Shock Tube Detonator Shelf Life in Relation to Timing Accuracy

    By Joshua Hoffman, Philip Mulligan, Braden Lusk, Tristan Worsey

    Blasters rely upon detonators to achieve the designed timing sequence to move material where it needs to go, minimize vibration, or optimize fragmentation. At times detonator inventory on seldom used

    Jan 1, 2013

  • ISEE
    Epic Blast of 275 US Ton (250 tonnes) Sets Benchmark in Opencast Mining Arena in Environmental Sensitive Area With Desired Fragmentation and Muck Profile.

    By Tapas Kumar Mukherjee, Sujit Kumar, Sanjay Kumar Singh

    This paper dwells on the epic blast conducted at Tata Steel’s captive coal mine in India and the insights drawn from it. Optimal blast design parameters had to be ascertained for operating benches (6.

    Jan 1, 2019

  • ISEE
    Shock and Transient Gas Pressure Damage to Electronic Detonators

    By G. Adderley, Rob. Farnfield, L. Bermingham

    The benefits of using electronic detonators within the drilling and blasting process in both surface and underground mining operations are well established and the use of this technology is widespread

    Jan 1, 2024

  • ISEE
    Evaluating the Fragmentation Data from Copper and Gold Mines

    By Sedat Esen

    "This paper presents a critical review of the fragmentation data obtained from some large open pit copper and gold mines. Database ncludes 35 mines with Uniaxial Compressive Strength values ranging fr

    Jan 1, 2017

  • ISEE
    Initial Testing of a Speed of Sound Test Apparatus for Powdered Explosives

    By Barbara Rutter, Shonn Kevin McNeil

    "This study discusses how a prototype was built to measure the sonic velocity in powdered explosives.The sonic velocity of an explosive is a benchmark to determine if the explosive deflagrates or deto

    Jan 1, 2017

  • ISEE
    EUExcert a European Initiative for Improved Explosive Competence

    By Roberto Folchi, Hans Wallin, Mara Battocchio

    An understanding of explosives science and technology, and the competence to harness it is central to maintaining Explosives capability, national security, and in sustaining a competitive industry. A

    Jan 1, 2013

  • ISEE
    Hole Diameter: Does it Affect Vibration Attenuation?

    By Tyler Acorn, Paul Worsey, Nathan Rouse

    The effect of the hole diameter on vibration attenuation has not been incorporated in most vibration models in the blasting industry. In current vibration models, the charge weight and the distance fr

    Jan 1, 2013

  • ISEE
    Western Europe's Largest Underground Blast

    By P McConnell, T Garrigan

    Tara Mines Limited, in Ireland, is Western Europe's largest zinc mine. Annual metal production, from 2.5 million tonnes of ore, consists of 180,000 tonnes of zinc and 34,000 tonnes of lead.

    Jan 1, 1989

  • ISEE
    Vibration Data Analysis to Optimize the Blast Design and Improve Shovel Productivity

    By Luana Ferreira de Carvalho, Aurelio Manço Garcia, Gustavo Sampaio Lopes, Jose Silvio Corsini, Davi Bastos Martins de Oliveira

    The Enaex Mining Technical Solutions (EMTS) team, in partnership with the Anglo American Iron Ore Brazil drilling and blasting team, has developed a study aiming to optimize the blast design applied a

  • ISEE
    Vibration Data Analysis to Optimize the Blast Design and Improve Shovel Productivity

    By Luana Ferreira de Carvalho, Aurelio Manço Garcia, Gustavo Sampaio Lopes, Jose Silvio Corsini, Davi Bastos Martins de Oliveira

    The Enaex Mining Technical Solutions (EMTS) team, in partnership with the Anglo American Iron Ore Brazil drilling and blasting team, has developed a study aiming to optimize the blast design applied a

    Feb 1, 2020

  • ISEE
    Full-Scale Trials Involving the Open Detonation of Large Bombs Close to Structures.

    By Ambrose Buchanan, Rob Farnfield, Charles Adcock

    Beginning on 7th September 1940 the City of London was subjected to 57 consecutive days of bombing in what became known as the ‘London Blitz’. To commemorate the 70th anniversary of this event a telev

    Jan 1, 2011

  • ISEE
    Drill Monitoring & Navigation Systmes at BHP Billiton's Navajo Mine

    By John Vynne

    BHP’s Navajo coal mine installed drill monitoring and high precision navigation systems on their three overburden drills during 2002 and 2003. Details of the DrillNav system hardware and reporting sys

    Jan 1, 2007

  • ISEE
    Tehachapi, CA, Double-Track Project, Rock Slope Design and Excavation

    By Thomas Pallua, William C. Gates

    "Two major railroad companies have identified several segments along the railroad corridor betweenTehachapi and Bakersfield, Kern County in California that require construction of a second track to im

    Jan 1, 2017

  • ISEE
    Comparison of Ground Vibrations vs. Frequencies to Strain Rates from Blasting Operations at the Tennessee Capitol Corridor in Nashville, TN

    By Gabe McClain, Thomas Pallua, Joe Schrank, William C. Gates

    Because of restrictions on blasting in urban areas and, more importantly, the proximity of this construction to national historic landmarks, blasting operations were extensively monitored to measure a

    Feb 1, 2020

  • ISEE
    Optimization of Blast Design Parameter for Ring Blasting in Underground Hard Rock Mine Using Numerical Simulation

    By VIVEK KUMAR HIMANSHU, Murari Prasad Roy, Kaushik Dey, Rakesh Kumar Singh, Ashish Kumar Vishwakarma

    Sublevel stoping is commonly adopted method in underground hard rock mining. Proper planning and its execution is the key requirement for stope extraction using this method. The stope extraction has b

    Feb 6, 2023

  • ISEE
    O'Shaughnessy Dam Hydroelectric Project

    By Alan Hooper, James E. Mischler

    Construction began in 1984 for a 5 megawatt hydroelectric power retrofit at the O'Shaughnessy Dam for the City of Columbus, Ohio. The construction necessitated excavation of limestone bedrock up to 27

    Jan 1, 1986

  • ISEE
    Beyond Regression: A New Wavelet-Based Approach for Airblast Overpressure Prediction

    By Al Romphf

    Managing blasting-induced air overpressure levels is a key compliance requirement for most blasting operations. Regression analysis, plotting overpressure amplitude vs cube root scaled distance, will

    Jan 26, 2026

  • ISEE
    Confiner Strength and Thickness Effects on Detonation Characteristics of Emulsion Explosives

    By D. Lynn Gordon, Larry B. Weston, Michael W. Manhart, Patrick R. Bowden, Michael W. Redmond

    Study of confinement effects on detonation characteristics and subsequent fitting form development as a function of confiner strength and thickness.

    Feb 1, 2020

  • ISEE
    Rational Methodologies for Setting Blast Vibration Limits for Houses

    By Adrian Moore, Alan Richards

    "It has been common practice to set blast vibration limits for structures using an “observational”approach whereby limits are set at a level based on observations of damage, or the lack ofdamage, comb

    Jan 1, 2013