Blast Created Trenches for Groundwater RemediationBy Jeffrey E. Loney, Andrew F. McKnown
Recovery of contaminated groundwater migrating through bedrock can be very difficult due to the low transmissivity of many bedrock fracture systems. To overcome these difficulties, a system of control
Jan 1, 1995
-
Computer Modelling of Bench Blasting for Grade ControlBy Lindsay Wade, Peter Dare-Bryan
Benches in surface mines often contain known areas of ore and known areas of waste, which must be mined selectively. When rock is blasted it not only fragments but is also physically, and non-uniforml
Jan 1, 2001
-
How the Blasthole Burden, Spacing, and Length Affect Rock BreakageBy Norman S. Smith, Richard L. Ash
Relationships between the three design factors of borehole burden, spacing, and length that control rock breakage were examined by means of reduced-scale bench blasts in dolomite. A set of three indic
Jan 1, 1977
-
The Effect of Rock Strength on Perimiter Blasting and the "Blastibility" of Massive RockBy Qingshou Chen, Paul N. Worsey
It has been recently argued that rock strength has little effect on the final results of pre-split blasting and is of only minor importance when blasting rock in general. However, it can be shown that
Jan 1, 1986
-
Blasting Cost Minimization at Duvha OpencastBy S A. Steyn, I P. Douglas
Duvha Opencast is a large South African dragline operation supplying coal to the Duvha Power Station which is operated by Eskom, the state power utility. For Duvha to remain competitive with other col
Jan 1, 1991
-
Borehole Study of Precompression Resistance in Detonators and ExplosivesBy Joseph A. Sohara, John J. Mullay, Curtis J. Keefer, Robert L. Schrepple
The desensitization of an explosive column by the action of a previous detonation (adjacent borehole, deck or detonating cord) is a vital concern to the explosives industry. Previous reports to this s
Jan 1, 1990
-
Journal: Blast Vibration and Seismograph Section / Post Blast Assessment Using Blasting Seismograph DataBy Kenneth Eltschlager
Post-blast assessment techniques using off-site data which includes location, seismograph and photographic data were discussed during the Blaster’s Weekend at this year’s ISEE Conference. Blast and pr
Jan 1, 2007
-
Utilizing European Magnetic Coupling of High Accuracy Detonator Technology in U.S. MinesBy Raymond M. Dixon, Dale L. Ramsey
Upon being introduced to the MAGNETIC COUPLING concept,Balsinger,Inc. wanted to conduct field trials to explore the potential of Magnetic Coupling in the U.S.. Although the Magnetic Coupling Concept h
Jan 1, 1990
-
State-of-the-Art Explosive Void Measurement SystemBy J P. F Warkentin, A W. Bauer
Recently, significant improvements have been made in both blast design methods and blasting accessories. The introduction of extremely accurate blast delays now allows proper implementation of advance
Jan 1, 1991
-
Preparation - The Key to a Good Legal DefenseBy G Alan Foster
The presence of approximately 600,000 attorneys in the U.S.A. and the determination by the courts that blasting is considered an 'ultra hazardous' activity makes every practical blaster aware that at
Jan 1, 1982
-
The Underwater Test as a Toll for Rating ExplosivesIncreasingly specialized blasting needs require that the explosive energy available in a borehole be reliably known for representative blasting conditions. The underwater test, when properly performed
Jan 1, 2000
-
Vibration and Ground Rupture Criteria for Buried PipelinesBy Lewis L. Oriard
This paper describes the process of developing blasting specifications for 850 miles of new pipe trench running parallel to an existing high-pressure gas pipeline, often with as little as 14 ft to the
Jan 1, 1994
-
Blasting at Cyprus Northshore Mining Company - A New Approach to Mining Taconite at an Old MineBy Thomas L. Barkley, Michael A. Indihar
The new Cyprus Northshore Mining Co. has taken the previous blasting methods of Reserve Mining Co.'s mine in northern Minnesota and adapted them to a new competative Iron Ore Industry. Cyprus was chal
Jan 1, 1991
-
Supression of Blast Pressure and Noise from Implosive Type ConnectorsBy Ettore Contestabile, Cameron Thomas
Implosive-type electrical/mechanical connectors such as XECONEX have been used extensively for joining electrical transmission lines. This implosive action of explosives has also been applied to other
Jan 1, 1995
-
Blasting Research to Enhance Permeability for In Situ MiningBy Mark S. Stagg, Rolfe E. Otterness, Stephen Rholl
The Bureau of Mines is engaged in research to develop and test high explosive fracturing and rubblization techniques that will enhance ore body permeability and thus increase recovery during in situ m
Jan 1, 1991
-
Why the 8MS Rule Doesn’t WorkBy D. Bartley, R. McClure, W. Reisz
Ever since the 8ms criterion was developed in the early 60’s there has been an ongoing debate among many blasters as to its actual value in controlling ground vibration. The perpetuation of the myth s
Jan 1, 2006
-
Effect of Blast Preconditioning on Communition for Selected Rock TypesCurrent research in comminution includes efforts to increase the efficiency of mineral processing systems and reduce the amount of electrical energy needed for size reduction. In most mining operation
Jan 1, 1996
-
Delay Timing and Vibration Characteristics at Low-Frequency Mine SitesBy D E. Siskind
The Bureau of Mines performed a comparative study of nine sites at eight surface coal mines to determine if the presence of near-surfaced underground abandoned workings resulted in the generation of a
Jan 1, 1990
-
Oil & Gas Well Perforating the Other Explosive IndustryBy Richard Arsenault
The production of oil & gas from wells requires method of flow from the producing formation into the well bore. Once the well is drilled it will have casing pipe installed to protect the integrity of
Jan 1, 2007
-
Non-Electric Sequential Blasting for Open Pit Mining ApplicationBy C A. "Hawk" Hanger
"The paper that will be presented is an in-depth study of sequential blasting using standardnon-electric shock tube down hole timing along with surface M.S. connector timing.Included also will be a di
Jan 1, 1993