Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Friction Loss in Tieback Anchors used for Landslide StabilizationBy John P. Turner, Benjamin J. Turner
"Tieback anchors are now used routinely for landslide stabilization in the USA and abroad. It is generally understood by design engineers that friction loss over the unbonded length of a tieback ancho
Jan 1, 2017
-
Analysis And Performance Of Sheet Pile Cofferdam Under Demolition Blast LoadsBy Michael Oakland
This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn
-
Analysis and Performance of Sheet Pile Cofferdam under Demolition Blast LoadsBy John Mould, Gordon Chen, Michael Oakland, William McElwee
"This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn
Jan 1, 2017
-
Wick Drain Guide Specification (Method)"1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi
Jan 1, 2014
-
Drilled Pier Foundations for Mercedes-Benz StadiumBy Jean Wehbe, Daniel C. Brahana
"The new Mercedes-Benz Stadium (MBS), home of the Atlanta Falcons, is part of a new era of stadium construction in the U.S. These new-age stadiums are larger and have more amenities than their predece
Jan 1, 2016
-
Analysis of Panel and Pile Verticality and Overlap in a Project Information Management SystemBy Jamey Rosen, Georgette Hlepas
Verticality data collected from panel and pile elements of seepage barrier walls describe the shape and position of those elements in three dimensions. These data are used to determine if a barrier wa
Sep 8, 2021
-
Ground-Supported Working Platforms For Tracked Plants And Mobile Cranes – Investigations Of Intercaction EffectsBy Moritz Schleeh, Christian Moormann
Temporary working platforms are generally required in order to ensure that heavy construction machinery such as drilling and trench wall units, pile drivers, vehicle and crawler cranes can be set up s
May 1, 2022
-
Cumulative Settlement Of Pile Group Under Cyclic High-Speed Train LoadingBy Pratik Goel, Sumanta Haldar
High-speed rail is an emerging area of interest in India. The Government of India is implementing prestigious bullet train projects in various parts of the country. High-speed rail (HSR) will be opera
Sep 1, 2022
-
Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)By Lori A. Simpson, Linda H. Liang
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T
Jan 1, 2017
-
Building A High-Rise Adjacent To Transit Tunnels In San FranciscoBy Lori A. Simpson
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.
-
Helical Pile Foundation Solution for Landfill RedevelopmentBy Kevin Baumgartner, Steven Babcock
A landfill in Phoenix, AZ reached capacity and was graded over in the 1970s. The property was subdivided into lots in 2007 to create a business park. However, the challenging site conditions caused by
Sep 8, 2021
-
Soil and Rock Nail Wall for Construction of a Subterranean AuditoriumBy Andrew Moran, William H. Walton, Matthew D. Emrick, Mary C. Nodine
"A rapidly growing company in the northern US needed a large auditorium built into a dolomite bedrock hillside. The structure required an 80-foot-deep earth retention system independent of the auditor
Jan 1, 2017
-
Deep Soil Mixing Ground Improvement for the U.S. Federal Courthouse in Downtown Los Angeles, CaliforniaBy Roberto A. Lopez, Eric Lindquist, Jon Bussiere, Dean Iwasa
"The new 11-story U.S. Federal Courthouse building in downtown Los Angeles demanded a cost effective foundation system capable of attaining a strict total settlement criterion of 0.5 inches (12 mm) un
Jan 1, 2015
-
Improvements in Deep Compaction Using Vibratory Pile Hammers (a877ad8a-6d27-4e33-a419-f0edb9bac870)By Dennis Nottingham
"Increased interest in seismic soil liquefaction and preventative soil stabilization sets the stage for improved deep compaction methods using pile driving techniques. In 1971, L.B. Foster Company per
Jan 1, 2005
-
Effect of Cold Joint on Behavior of Block Type Deep Mixing Improved GroundBy M. Kitazume, H. Imai
The deep mixing method was developed in Japan and put into practice in the middle of 1970s. Since then, the wet and dry type methods have been applied for various improvement purposes in Japan. One st
Sep 8, 2021
-
Construction of Large Drilled Shafts the 2nd Annual Mike O'neill LectureBy Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
May 11, 2007
-
Fresh Concrete Pressure in Cast In-Situ Bored PilesBy Matthias Pulsfort, Hanna Nissen, Markus Herten
An insufficient integrity of cast in-situ bored piles can lead to a reduction of the load bearing capacity and may require cost intensive repairs. Reasons for an insufficient pile integrity are linke
Sep 8, 2021
-
Innovative Soe Solutions For Shaft Construction: Getting To Depth With Diaphragm Walls At Westerly Storage TunnelBy Ryan Sullivan, Lisa Smiley, Jewels Stover
The Westerly Storage Tunnel (WST) Project is part of Project Clean lake, the North East Ohio Regional Sewer Dist years. When completed in 2020, WST will be nearly 2 miles of 25-ft diameter tunnel 200-
-
Full Waveform Inversion of Cross-Hole Stress Waves for Structural Integrity Testing of Drilled ShaftsBy Joseph T. Coe, Alireza Kordjazi, Michael Afanasiev
Cross-hole sonic logging (CSL) is a common quality assurance measure for the evaluation of the structural integrity of drilled shafts. The results of CSL can be supplemented by a set of tomographic im
Jan 1, 2019
-
On Driven Piles In Coralline Deposits: A Selected Case From The Red Sea Coast Of Saudu ArabiaBy Waddah Akili
At an offshore site along the Red Sea coast of Saudi Arabia, marine structures were supported on tubular steel piles driven into coral and coral contaminated sands and silts. Surprises and disappointm