Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Inspector's Manual For Driven Pile Foundations ? Introduction

    This manual provides basic practical instruction on the inspection of driven piles. It covers the essential components of pile driving, such as the pile driving hammer, hammer accessories, the pile an

    Jan 1, 1997

  • DFI
    Augercast Piles - History And Advancements

    By Larry Rayburn

    Augercast piles evolved in the late forties from the process of pressure grouting open holes backfilled with stone. In 1956, a patent was issued for a cast in situ pile by pumping high pressure grout

    Jan 1, 2005

  • DFI
    Session 32 "Grout Mixtures and Materials 3"

    By Lois G. Schwarz

    I did a project (Sungai Piah) as a consultant to your firm in Malaysia, where we were faced with a similar situation as sketched out in your question. The following is what we did for the grouting of

    Feb 10, 2003

  • DFI
    Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction

    By Alan D. Fisher

    Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen

    Jan 1, 2013

  • DFI
    Newtown Creek Pile Foundation Work 2009

    By Thomas Trochalides

    Newtown Creek Water Pollution Control Plant in Brooklyn, NY is the largest of 14 Water Pollution Control Plants in New York City. It services over 1 million people with a current processing capacity

    Jan 1, 2010

  • DFI
    Guidelines for Selecting Cutoff Wall Systems

    By Mary Ellen Large

    This publication of Deep Foundations Institute (DFI) is intended to provide project owners, design engineers and construction professionals with guidelines for selecting cutoff wall and barrier system

    Jan 1, 2021

  • DFI
    King?s Cross Station Re-Development Passive And Active Mitigation Of Tunnelling - Induced Settlement

    By Clif Kettle

    The paper will detail the design and execution of passive and active settlement control measures, the means adopted to overcome the various physical and operational constraints, and to meet specified

    Jan 1, 2008

  • DFI
    Mooring Bridge Caissons During Construction Using Jetted-In Driven Plate Anchors

    By Osama A. Safaqah

    Driven plate anchors can be used to hold in place large bridge caissons during floating construction. Their small size and simple method of installation make them a very cost effective alternative to

    Jan 1, 2013

  • DFI
    Augered Cast-In-Place Piles Quality Control

    By Rudolph P. Frizzi

    The current trend of increasing augered cast-in-place (ACIP) pile diameter, length, and load carrying capacities demonstrates improvements in installation equipment, increased acceptance, and that qua

    Jan 1, 2001

  • DFI
    Retaining Wall Installation Beneath An Existing Structure

    By Kenton W. Braun

    Concourse B at the Anchorage, Alaska International Airport is currently being renovated while retaining the original building structure and foundations. Part of the renovation includes the installati

    Jan 1, 2008

  • DFI
    Contactless Anchor Measurement with Elastomagnetic Sensors

    By Damir Dedic, Wörle. Patrick

    "Soil properties within a construction project area are analyzed during the planning phase. However, it is only possible to achieve selective soil exploration, even in the case of very extensive inves

    Jan 1, 2017

  • DFI
    Comprehensive QA/QC Integrity Testing Using Thermal Integrity Profiler

    By Brad W. Taylor

    "During the past several months, I have introduced to civil and structural engineers an innovative solution for the integrity testing of concrete using the Thermal Integrity Profiler (TIP) Wire Cable

    Jan 1, 2017

  • DFI
    Foundation Innovations Ensure Successful Bridge Replacement

    By Mark S. Greenleaf, Alec D. Smith, Mary Vittoria-Bertrand, Heather B. Scranton, Jean Louis Z. Locsin

    "Rhode Island’s new $163.7 million, 2,265 ft (690 m) long, four-lane Sakonnet River Bridge sits just south of the existing bridge in Portsmouth/Tiverton. The bridge, a critical transportation system l

    Jan 1, 2015

  • DFI
    Broadway Viaduct Design Phase Load Test Program For Post Grouted Shafts

    By Mike Muchard

    A design phase load test program was performed at the Broadway Viaduct bridge site to evaluate load carrying capacity and constructability of post grouted drilled shafts. The program included construc

    Jan 1, 2009

  • DFI
    Installation And Testing Of 260 Hollow Core Bar Micropiles

    By Jesús E. Gómez

    A total of 260 micropiles were installed as part of a retrofit effort for two existing bridges. The micropiles consisted of hollow core bars installed under limited headroom conditions. Of the total n

    Jan 1, 2007

  • DFI
    Installation Of Drilled Piers In Shales ? Synopsis

    By A. C. Ackenhell

    The geologic environment of Pittsburgh, Pennsylvania is both inviting and challenging to drilled pier installation. The shales and clayey soil zone of the hills are favorable but the alluvial soils of

    Jan 1, 2010

  • DFI
    Bridge Pier Remediation, New London CT

    By Walter Kaeck

    In a recent upgrade of their system, Amtrak converted a bascule type draw bridge over the Thames River to a vertical lift structure supported by the existing piers. During the bridge replacement, sign

    Jan 1, 2009

  • DFI
    Keynotes: Axial Capacity Of Drilled Foundations In Soft Rocks And Intermediate Geomaterials - Presentation Notes

    By Michael W. Neill, O&apos

    This presentation addresses some of the problems encountered in estimating the capacity of drilled shafts and augered, cast-in-place piles in soft rock. Methods to quantify side and base resistance ar

    Jan 1, 2001

  • DFI
    New Outfall Bridge Structures At Bonneville Dam - 1. Introduction

    By Lance Helwirg

    New high and low double outfall bridge structures for a juvenile fish bypass system have been constructed on the Washington Shore approximately two miles downstream from the Bonneville Dam on the Colu

    Jan 1, 2001

  • DFI
    The Berkeley Art Museum: Repurposing a Historical Building

    By Timothy Nelson, Simon Burnworth

    "The Berkeley Art Museum and Pacific Film Archive (BAMPFA), which currently resides in a 1970s-era post-modern concrete structure just south of the University of California, Berkeley campus, was in ne

    Jan 1, 2016