Little Britain Project: Construction Of BasementBy R. H. Wright
This paper describes the design philosophy and methods employed in constructing the foundation elements for the Little Britain Project in the City of London. The Contract is a design and construct pac
Jan 1, 1989
-
New CIGMAT Downhole Penetrometer (DHP-CIGMAT) For Use During Drilled Shaft ConstructionBy C. Vipulanandan
It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increas
-
Evaluation Of Existing P-Y Models For Caliche Based On Numerical Analysis Of Raiders Stadium Lateral Load TestsBy Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan
Numerical lateral load analysis based on the beam on Winkler foundation (BNWF) model (i.e., the p-y method) is a simple, and widely used tool to predict lateral responses of drilled shafts from field
Oct 1, 2022
-
Laboratory Study on Creep Behavior of Chemically Stabilised Soft Soils under Unconfined ConditionsBy Venda Oliveira P. J., Correia A. A. S., Danisi C. M.
"AbstractA laboratory study has been undertaken to establish common understanding of the creep phenomenon of a Portuguese soft soil chemically stabilised with binders. In order to study the effect of
Jan 1, 2014
-
Grouting Methods Involved in Stabilization of TBM Tunnel near CP-06, UAA-04, Chennai MetroBy Yeruva Ramanareddy, Sohail Wajid, Ahmed Shaz, K. Bhavani
"CP-06 is an NATM cross passage which connects up-line and down-line metro tunnels near Kilpauk Medical College, Chennai. It lies completely in loose silty sand to dense sand with water table almost t
Jan 1, 2017
-
Diaphragm Walls, Recent Developments to Improve ReliabilityBy A. Frits van Tol, Rodriaan Spruit, Jan H. van Dalen
"Abstract In recent years, there have been major problems with deep excavations in urban areas supported by diaphragm walls. In some cases, like the fatal Nicoll Highway collapse in Singapore the qual
Jan 1, 2014
-
Recycling Jet Grout Backflow: Waste Mitigation and Cost BenefitsBy Craig T. Jones, Zachary Q. Maassen
"Jet grouting is a method of ground improvement that relies on the erosive capacity of high-speed jets to cut and mix the ground in place with a cementitious grout. A continuous return flow of cutting
Jan 1, 2017
-
Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing MethodsBy Juan M. Antorena
A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a
Jan 1, 1995
-
Design Of Drilled Pier In Expansive SoilsBy G. T. Hong
A numerical model for use in design is developed to predict the stresses and axial and bending displacements in a drilled pier in expansive soils. The prediction is based on the horizontal swelling p
Jan 1, 2007
-
Prediction Of Jet Grout Column Diameter In Cohesive SoilBy Chu E. Ho
Current methods of determining jet grout column diameters are highly empirical and site specific, and do not take into account the jet hydrodynamics and soil parameters explicitly. A theoretical model
Jan 1, 2006
-
Jetting-Assisted Sheet Pile DrivingBy Marie-Pierre Bourdouxhe-Barnich
Since 1997, in partnership with the Laboratoire Central des Ponts et Chaussées in Strasbourg, ProfilARBED has been carrying out a vast study to qualify the improvements jetting can make to vibratory d
Jan 1, 2002
-
Use Of Helical Piles Set Into Soft Rock For 1500-Ton Screw Press FoundationBy David C. Kraft
A major manufacturer and user of machine tools had the need to install a screw press machine at its plant site with the following design load requirements: (1) Vertical Compression Live Load = 2000 ki
Jan 1, 2003
-
Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? IntroductionBy Daniel L. Hanson
This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently
Jan 1, 1994
-
Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation ProjectBy Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres
In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma
Jan 1, 2018
-
Ultimate Lateral Load of a Pile in Cohesive Soil under Static LoadingBy Dileej M. Dewaikar, Poonam A. Patil
"In this paper, the ultimate lateral resistance of a long, flexible, unrestrained vertical pile in a cohesive soil is computed under static loading condition using py curves. A simple and improved met
Jan 1, 2005
-
Design Of Laterally Loaded Single Pile In Sand Near Slope - A Proposal For Subgrade Reaction FactorsBy Salim Mezazigh
Usually different methods for designing a single pile submitted to a lateral loading are available. They are based on theory of elasticity with the parameters E,v or subgrade reaction method using the
Jan 1, 2002
-
Soil Displacement Caused By Pile Driving In ClayBy K. Rainer Massarsch
The effects of soil displacement caused by pile driving on adjacent piles and structures are discussed. A method is proposed to estimate the point of force equilibrium which makes it possible to calcu
Jan 1, 1989
-
Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic RetrofitBy A. R. Dover
The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew
Jan 1, 2008
-
Design Of Cooper River Bridge FoundationsBy Osama Safaqah
The new Cooper River Bridge will replace two existing bridges along U.S. Highway 17. The cable-stayed bridge will be one of the largest in the U.S and will connect the City of Charleston and the town
Jan 1, 2005
-
Caisson Design And Construction Challenges On The New Tiger Stadium Project - SummaryBy Fritz J. Klingler
From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc
Jan 1, 1999