Construction Technique Used To Build The Drilled Shafts For The Victory BridgeBy T. Jason Hardell
The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin
Jan 1, 2005
-
Special Foundation Technique For The Intersection Of Two Canals Near Magdeburg, Germany - Summary:By Wolfgang G. Brunner
The closing of the gap in the European waterway- net is one of the big and challenging traffic projects following the German reunification. The water canals in the North German plain connect the Rhine
Jan 1, 2000
-
Micropile-Supported Wall To Resist Lateral Deflection Of Existing Railroad Bridge AbutmentBy Samer R. Rabab?ah
As part of the PHX Sky TrainTM project at Phoenix Sky Harbor International Airport in Phoenix, Arizona, the existing traffic lanes at the 44th Street underpass below the Union Pacific Railroad (UPRR)
Jan 1, 2011
-
New Possibilities for Quality Assurance of Diaphragm Wall JointsBy Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider
"Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc
Jan 1, 2014
-
Vibratory Driver/Extractors Do More Than Drive Sheet Piles - SummaryBy John L. White
Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to
Jan 1, 1997
-
Limitations Of Predicting Deformations During Excavation In Soft Clay ? SummaryBy Richard J. Finno
Detailed measurements made at a test section adjacent to a deep braced cut and other published data are combined to illustrate the limitations of the common methods of predicting movements associated
Jan 1, 1991
-
Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted PilesBy John F. MacDonald
From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn
Jan 1, 1990
-
Caisson Design And Construction, Upstream Guide Wall, Locks And Dam No. 26By E. C. Demsky
This paper describes the large diameter caisson foundation for the upstream guidewall at the Lock and Dam No. 26 (Replacement) Project. The guidewall is supported on two rows of 1.8-m diameter concret
Jan 1, 1989
-
Capacity Of Piles And Settlement Of Pile FoundationsBy M. Mets
Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo
Jan 1, 2000
-
Permanent Displacement And Pile Driving Vibrations - SummaryBy Charles H. Dowding
Whenever piling vibrations are significant, construction activities associated with pile driving and/or excavation can produce permanent displacement. These permanent displacements are more detrimenta
Jan 1, 1991
-
Experiences With Heavy Drop Hammer Testing Of Rock-Socketed ShaftsBy Frank Rausche
Since the early 1980s, when the Road Construction Authority of Victoria authorized the dynamic proof testing of roughly 100 drilled shafts of 1.5 m diameter and typically 60 m length in Melbourne Aust
Jan 1, 2006
-
Application of Mammoth Vibro-Tamper (MVT) for the Shallow Compaction at Airport Runway Expansion Project on Florida Limestone GroundBy Kazunori Matsushita, Frank Vespi, Emi Walder, Mitsuo Nozu
During the runway expansion project at the Fort Lauderdale-Hollywood International Airport in Florida (FLL project), therewere complicated geotechnical issues with a number of cavities in the limeston
Jan 1, 2018
-
Deep Open Excavation In Chicago Downtown Area For Red Line And Blue Line Subway Connection At Block 37By Gordon Chen
The Block 37 Chicago Transit Authority (CTA) Tunnel Construction Project was originally designed by STV to connect Blue Line subway in North Dearborn Street and Red Line subway in State Street in the
Jan 1, 2009
-
Comparison of a and ß Methods with CPT and Pile Load Test Data: A Case Study with Attention on Soil Setup EffectsBy Mohammadreza Khanmohammadi, Kazem Fakharian
"AbstractIn driven piles, the gradual dissipation of excess pore water pressure and consequently the soil setup significantly contribute to increasing the pile capacity with time. The question is rise
Jan 1, 2014
-
Experimental And Theoritical Studies On Pile Capacity - SynopsisBy K. Rambha Devi
The paper is an attempt to co-relate the findings of pile capacity using a number of formula suggested by various authors with the actual field load test results. Five locations consisting of wholly s
Jan 1, 1996
-
Use Of Non-Invasive Helical Foundations For Urban Forest Canopy Walk Way ? Atlanta Botanical GardenBy David C. Kraft
Helical piles and ground anchors were used to meet critical design and constructability requirements for an urban forest Canopy Walk at the Atlanta Botanical Garden, Atlanta, GA. The 12-foot wide ped
Jan 1, 2011
-
Quality Assessment Procedure And Classifications Of Cast-In-Place Shaft Using Low Strain Dynamic TestBy Liqun Liang
Various nondestructive testing (NDT) inspection methods are available to evaluate the structural integrity of cast-in-place shafts. The widely used methods include Cross Hole Sonic Logging Testing and
Jan 1, 2011
-
O Street Anchored Precast Lagging And Soldier Pile Retaining WallBy John Wise
Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu
Jan 1, 2003
-
Foundation Retrofit Design and Construction for the Benicia-Martinez Bridge, Martinez, California - 1998 DFI Annual Conference October 7th-9th, 1998 Seattle, WashingtonBy Roy A. Imbsen
Following the 1989 Loma Prieta earthquake, California Department of Transportation (Caltrans) expedited an effort to evaluate and retrofit important state-owned toll bridges to enhance performance of
Jan 1, 1998
-
Evaluation of Crane Pad Performance on Partially Improved Ground Adjacent to a SeawallBy Paul J. Sabatini, Yazen A. Khasawneh
"A Demag CC1800 crawler crane was partially erected on crane mats adjacent to a seawall when settlements near a corner of the crane mat area were observed to be slightly larger than previously assesse
Jan 1, 2017