Organization
Organization
  • CIM
    Exploration Innovation Consortium, an Initiative of the Canada Mining Innovation Council (CMIC)

    By François Robert

    The rate of new mineral discoveries in Canada has been declining in the last two decades. In response to the challenge and to stagnating investments in mining-related R&D, twenty Industry partners, su

    May 1, 2011

  • CIM
    Technological Advances in Telecommunications for Mines

    By Patrick M. Y. Waye

    As mines utilise more automation in mining operations to improve efficiency and safety, a corresponding increasing demand is placed on the transport of information. Some of the recent technological ad

    May 1, 2001

  • CIM
    Improved Concentrate Grade and Recovery through the Application of the 6 Sigma Methodology at Noranda Matagami Mill

    By Martin Plante, Denis Hamel, Marie-Pier Bédard, Jeff McLaughlin

    "The results and methodology for the optimisation of the zinc flotation circuit at the Matagami Mill using the 6-Sigma methodology are shown in detail while only the base line and final results are pr

    Jan 1, 2001

  • CIM
    Observation of Ore Pass System Performance at Brunswick Mine

    Brunswick Mine employs an ore and waste pass system for material transfer. This paper reviews the evolution and performance ore pass systems at the mine. It presents the range of selected configuratio

    Feb 1, 2008

  • CIM
    Geotechnical challenges at the Beal Mountain mine, Montana

    By D. Stone

    "The Beal Mountain mine near Anaconda, Montana, is an interesting case history of a mine that has continued operations despite several large pit wall failures over a period of approximately 10 years.

    Jan 1, 2002

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009

  • CIM
    Reducing maintenance costs through predictive fault detection

    By Y. Faitakis

    In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis.

    Jan 1, 2004

  • CIM
    UNIFLOT SP129 - Copper Sulphide Collector

    By S. Auger, S. McDonald, K. Ward

    "This preliminary paper provides a summary of lab and mill flotation investigations into the copper collector at two Canadian operations. The orebodies illustrated in these studies both contain mainly

    Jan 1, 1992

  • CIM
    Améliorations apportées au minage de la zone 1 à la mine Doyon

    By François Girard

    La zone 1 de la mine Doyon (zone altérée), se situe à l?extrémité sud de la mine et est constituée d?une série de veines étroites à fort pendage et ayant des épontes de très faible résistance. Les épo

    Feb 1, 2008

  • CIM
    Alkaline Pressure Oxidation Barrick Mercur Experience

    By P. T. O'Kane

    "INTRODUCTION Wright Engineers Limited is active and has extensive experience in the design of pressure oxidation plants for the treatment of refractory gold ore and concentrate. In addition to the Me

    Jan 1, 1989

  • CIM
    Chemical Additives for Improving the Wet Grinding of Ores

    By R. Samuels, R. Klimpel

    "IntroductionLaboratory and industrial grinding tests have shown that the process of size reduction of metal containing ores can be significantly influenced by chemicals added to the slurry being grou

    Jan 1, 1979

  • CIM
    Backfill at Madsen

    By L. H. Van Loon, E. G. Crayston, A. F. Heather

    "IntroductionTHE PROPERTY of Madsen Red Lake Gold Mines. Limited. comprises fifty-eight claims located between Russet and Faulkenham lakes in Baird and Heyson townships of the Patricia portion of the

    Jan 1, 1954

  • CIM
    A pilot-scale evaluation of the effect of grind size on the recovery of a UG2 platinum ore

    By Trevor Harris, Martin Harris

    "This paper evaluates the effect of grind size on the flotation performance of a platinum ore from the UG2 reef of the Bushveld Igneous Complex, in South Africa. The study was conducted on the Mintek

    Jan 1, 2002

  • CIM
    Numerical Analysis of the Early Response of Paste Backfill in a Vertical Stope

    By N. E. Mkadmi

    Backfilling increases the stability of underground stopes and may help reduce the environmental footprint from the mining operation. The barricades holding the backfill in place must be designed to pr

    May 1, 2011

  • CIM
    Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)

    By Y. Faitakis, G. J. Powley, C. Mackenzie

    "In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis

    Jan 1, 2004

  • CIM
    Large Flotation Machine Development and Operation

    By M. Churchill, V. R. Degner

    "Over the past two decades, declining ore body grades, increased operating costs and increased construction costs have provided an incentive for the development of progressively larger flotation machi

    Jan 1, 1982

  • CIM
    Quantitative Treatment of Aeromagnetic Data 1n Mineral Areas

    By B. K. Bhattacharyya, Morley. L. W.

    "The primary purpose of conducting aeromagnetic surveys in mineral areas, and interpreting the data thus obtained, is to aid in the extrapolation of the geology from known to unknown areas-both in a h

    Jan 1, 1966

  • CIM
    Optimising Stope Sequences for Long Term Mine Planning

    By André van Wageningen

    Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    May 1, 2004

  • CIM
    A New Design Approach of Roadside Cut Rock Slope Based on Ecological Environment Protection

    By Lian-Jin Tao

    With fast development of China modernization, road construction obtains great achievement. However, in the construction process of highway, especially the high-grade highway in mountainous area, there

    May 1, 2009

  • CIM
    Interactions between Slurry Density and Grinding Media Size

    By Claude Bazin, Patricia Obiang

    "The slurry density (pulp percentage of solids) and the size of the grinding media are often used for the optimization of an operating ball mill. In many cases a change of ball size is made at the slu

    Jan 1, 2007