Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The selection of truck haulage and teledumper trucks for backfilling at the Cannon Mine

    By J. Baz-Dresch

    "The most cost-effective method of placement of the high strength fill used in the Cannon Mine' s overhand cut-and-f ill bench stopes was determined to be truck haulage. Constraint s imposed by t

    Jan 1, 1989

  • CIM
    The Optimal Block Size in the Block Caving Mining Method

    By J. Someehneshin

    Nowadays along with population growth, industry development, consumption of mineral resources and the fact that the reserves on hand are running out, the depth of surface and underground mines for fur

    Aug 1, 2013

  • CIM
    High Purity Alumina from Greenland

    By James Tuer, John R. Goode, Jim Cambon

    "Hudson Resources Inc. (Hudson) has defined a major resource of high purity anorthosite (calcium feldspar) assaying about 30% Al2O3 at the White Mountain (Naajat) deposit in Western Greenland. Extensi

    Jan 1, 2016

  • CIM
    Survey on the requirements of computer training for the coal industry in Canada

    By B. M. Das, D. B. Cross

    "In June 1983, the Computer Applications and Process Control Committee (CAPC) of the Canadian Institute of Mining and Metallurgy (CIM) circulated a questionnaire to coal mining, exploration and consul

    Jan 1, 1986

  • CIM
    Geology of the Lake George antimony deposit southern New Brunswick

    By A. A. Ruitenberg, C. J. Morrissy

    "The Lake George antimony deposit comprises a system of stibnite-bearing quartz veins that cut Silurian greywacke and slate. The stibnite-bearing ore zone is in part enveloped by a uraniferous zone.Th

    Jan 1, 1980

  • CIM
    Design and operation of thickened tailings disposal system at Les Mines Selbaie

    By K. R. Wood, G. W. McDonald

    "The tailings disposal system at Les Mines Selbaie includes dewatering of tailings in a high-capacity thickener, followed by point discharge of the thickened solids to form a stable conical pile. Tail

    Jan 1, 1986

  • CIM
    Tentative identification of chemical elements likely to escape in the atmosphere at the Lingan coal-fired power plant, Lingan, Nova Scotia

    By Erwin L. Zodrow

    "For 25 chemical elements in electrostatically precipitated fly ash (Lingan coal-fired power station), concentration changes are studied as a function of increasing proportions of fines (ash particle

    Jan 1, 1982

  • CIM
    ONSET OF A BOTTLENECK ? The Permitting and Regulation of New Mining Projects - The Western Canadian Experience

    What Bottleneck? ??Resurgence of BC Mining Industry; ??Climate of heightened activity ?Increases pressure placed upon regulatory agencies; ??Current EA and permitting system, when Federal agencies

    May 1, 2006

  • CIM
    Lessons Learned from the Sullivan Tragedy ? A regulator?s Point of View

    By Al Hoffman

    During the period May 15 ? 17, 2006 four fatalities occurred at #1 Waste Dump, at Teck Cominco?s Sullivan mine located at the city boundary of Kimberley, British Columbia, Canada. The fatalities occur

    May 1, 2010

  • CIM
    TUFFSTUDDS-A new wear protection system

    By V. Silins, J. Tameling, R. C. Cook

    "A general review of the wear problems encountered in the mining industry is presented and current practice for wear protection systems is reviewed.A new concept in wear protection is described and co

    Jan 1, 1982

  • CIM
    The technical-scale realization of the Kivcet Process for lead

    By Kiran B. Chaudhuri, Michael Koch, Jorg Lema Patino

    "Stricter pollution regulations together with other factors have stimulated interest in the modernization of the traditional sinter - blast-furnace lead operation. In this context, direct smelting met

    Jan 1, 1980

  • CIM
    Improving Flotation Recovery of Oxide Copper Minerals

    By T. Bhambhani, O. Yavuzkan, D. R. Nagaraj

    "Cu ore bodies commonly contain oxide Cu at the surface, with sulfide Cu content increasing with depth. The recovery of oxide Cu minerals by flotation is a longstanding challenge in the minerals indus

    Jan 1, 2016

  • CIM
    Electric furnace matte tap hole developments at Falconbridge Limited

    By I. A. Cameron, F. Ham, R. Sriram

    "Planned increases in electric furnace productivity and higher matte temperatures needed for the Sudbury Smelter's S02 Abatement Plan, require an improved matte tap hole. Since startup in 1978, t

    Jan 1, 1995

  • CIM
    Single Pass Bolting Approach for the Stabilisation of Rock Masses in High Stress Conditions

    By François Charette

    High stress conditions in underground mines push the performance envelope of support systems to their limit. In weak rock masses these conditions lead to large deformation and breakdown of the rock ma

    Nov 1, 2011

  • CIM
    Interactive computer modelling of draglines

    By P. W. Udo Graefe

    "An interactive computer model of a dragline, windrow and spoil pile has been developed for modelling oil sands mining operations. The model is to be used in conj unction with models of other oil sand

    Jan 1, 1982

  • CIM
    Synchronized Bypass Drive System for Grinding Mills

    By A. Mellek, M. Pischtschan, M. Perrucci

    ABB has received an order for one of the most challenging mill drive projects in its history. With one SAG mill and one ball mill to be added at an iron ore mine in Sweden, the customer’s plant manage

    Jan 1, 2016

  • CIM
    The Transformation of Two-Line Ferrihydrite into Crystalline Products: Influence of the Media (Sulfate vs. Nitrate)

    By Yongfeng Jia, Shaofeng Wang, Danni Zhang

    Ferrihydrite is ubiquitous in soils, groundwater and aquatic sediments and is usually classified as "2-line" or "6-line" according to the number of diffuse XRD peaks. It has high surface area and reac

    Jan 1, 2016

  • CIM
    Ecological Engineering in a Mining Context: Past Progress-Future Promise

    By Margarete Kalin

    Mine Waste Management ?Reduction of Sulphideoxidation or inhibiting weathering of rocks Geologist - broken or ground rocks Hydrologist - sources of contaminants Mining engineer - waste sites C

    May 1, 2013

  • CIM
    Application of MDL Reichert cone and spiral concentrators for the separation of heavy minerals

    By Thomas J. Ferree

    "There has been a major evolution of mineral processing technology in the past decade. The evolution has been driven by recognition of broad environmental changes which have impacted various areas of

    Jan 1, 1993

  • CIM
    Using The Six Sigma Approach Towards A Metallurgical Project: Nickel Loss Reduction And General Improvements To The Raglan Rougher Flotation Circuit

    By C. Ciriello

    Six Sigma methodology, as applied within Xstrata (formerly Falconbridge and Noranda), involves a disciplined approach to managing projects, solving problems, improving performance, and leveraging info

    Jan 1, 2007