Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A material balance calculation procedure for grinding circuit hydrocyclone selection

    "Process specifications for classification system design f or closed circuit grinding are identified. A computer-assisted, mass balance procedure for estimation of material size distributions and requ

    Jan 1, 1984

  • CIM
    Influence of selective mining on optimum pit design

    By Alexandre Desbarats, Michel David

    "All optimum pit design studies start from the geological are reserves inventory, the estimated grades of all blocks of potential are within the interpreted limits of the deposit. The actual optimizat

    Jan 1, 1984

  • CIM
    Lithological interpretation based on monitored drilling performance parameters

    By J. Peck, M. J. Scobie, M. D. Pollitt

    "IntroductionOne aspect of current research in the Canadian Centre for Automation and Robotics in Mining (CCARM) involves the automatic identification of different rock types based on particular drill

    Jan 1, 1991

  • CIM
    Power factor regulation and peak load regulation

    By Jean-Luc Beaudoin

    "In addition to the actual energy consumed, billing is dependent on the peak load and the power factor. The lower the power factor goes, the higher will be the penalty the consumer pays. The principle

    Jan 1, 1982

  • CIM
    Underground water treatment at the Kidd Creek Mines

    By M. K. Walter

    "The underground operations of Kidd Creek Mines uses an average of 450 U.S. gpm water during regular operations, and discharges an average of 800 U.S. gpm through consecutive staged pumping lifts of 1

    Jan 1, 1988

  • CIM
    Digital instrumentation and control for industrial and small utility electrical systems

    By D. B. Langford, R. Hart

    "This paper presents an overview of the state-of-the-art in industrial and utility power metering and control systems with particular emphasis on Digital Power Meters and Power Demand Controllers.Intr

    Jan 1, 1991

  • CIM
    COALMOD A Financial Analysis and Policy Simulation Model for Coal Mining Developments

    By Philippe Monier, Frank C. Basham

    "This paper outlines the scope and applications of 'COALMOD', the British Columbia Ministry of Energy, Mines and Petroleum Resources' computerized financial simulation model for coal mi

    Jan 1, 1981

  • CIM
    The role of Canadian universities in technology development

    By Michael Farley, Paul Dufour

    "Relationships, Partnerships,Marriages (RPM)RPM has a nice musical ring to it, but it is in fact synonymous with science and technology, university-government -corporate links and the more genera l is

    Jan 1, 1986

  • CIM
    Casing Integrity of a Typical Pre-Salt Wellbore under Local Salt Dissolution Conditions

    By E. Poiate, P. A. L. P. Firme, D. Roehl, M. A. Carrion, A. M. Costa

    Drilling high-pressure/high-temperature wells in salt rock formations is still a challenge for the energy industry. Creep and solubility is part of the salt rock physical-chemical behaviour, which mus

    Jan 1, 2015

  • CIM
    Status report on Canadian coal mining

    By Eric D. Jamieson

    "How well is the Canadian coal industry able to expand in the tough competition with other fuels in Canada and with other suppliers in the international, metallurgical and thermal coal trade? Coal pro

    Jan 1, 1980

  • CIM
    Prediction of radiation levels and ventilation requirements in underground uranium mines

    By J. H. Nantel, J. F. Archibald

    "The presence of radon from uranium-bearing ores, waste and from backfill material introduced underground to provide ground support, work platform and waste disposal functions, requires that ventilati

    Jan 1, 1984

  • CIM
    Energy conservation at Inco Metals Company: Frood-Stobie mill-heating and ventilating system

    By C. R. Kerr

    "This paper describes the revisions to the heating and ventilating system at the Frood-Stobie mill, which resulted in substantial savings in energy costs.IntroductionInco Metals Company, a unit of Inc

    Jan 1, 1981

  • CIM
    The application of high density paste backfill at Dome Mine

    By D. L. Churcher, R. J. Perry

    "In recent years much work has been don e to examine alternate underground backfill support systems with the objectives of improving ground support and reducing mining costs. This report deals with th

    Jan 1, 1990

  • CIM
    Reserve/consumption ratios - How can they be interpreted?

    By F. W. Wellmer

    "This paper discusses the changing nature of reserve/consumption ratios, using data from Canadian operations and focussing particularly on copper.IntroductionStudies in world metal consumption and wor

    Jan 1, 1981

  • CIM
    Determination of a Friction Angle for an Alkaline Igneous Rock

    By John E. Udd

    The stability of a rock mass is influenced by the presence of discontinuities. In assessing stability, it is required that one should know the frictional and cohesive properties of these contained wea

    Jan 1, 1979

  • CIM
    Computer design of underground mine dewatering systems

    By E. M. De Souza, R. Penner

    "Water is encountered at the majority of underground mines, both over their lifetime and during each stage of development and production. The dewatering system is one of the most important and costly

    Jan 1, 1993

  • CIM
    The Mechanical-Electrical Sector of the Mining Industry: Technical Innovations in the Energy Context

    By Jacques Nantel

    Mechanical-electrical personnel are present in all phases of the mining industry; the coverage is broad and diversified. Concepts of energy accounting are reviewed to pinpoint the sectors with a large

    Jan 1, 1979

  • CIM
    The SALA Caravan Mill-synopsis

    By G. Kollberg

    "IntroductionThe SALA Caravan Mill system represents a proven concept for the design and operation of mobile and semi-mobile ore dressing plants.The Caravan Mill has been developed to meet the demand

    Jan 1, 1982

  • CIM
    Experience With Mine Roadway Steel Arch Supports in the United Kingdom

    By A. B. Szwilski

    The paper outlines the factors taken into account for the selection of steel arch supports. The results are based on experience using the long wall system of coal mining where roadway closure can be e

    Jan 1, 1979

  • CIM
    Computer modelling of the geology of the Coal Mountain Mine

    By M. Lytle

    "The Corbin area of southeastern British Columbia has been a coal mining area since 1908. Byron Creek Collieries Ltd. Has operated its Coal Mountain Mine in this area from 1974 until the present. In F

    Jan 1, 1982